Loading…
Loading…
Tender Value
₹22.3 L
EMD Value
₹44,500
Closing Date
29 Aug 2026, 4:00 pmDue tomorrow
XEN PWD REASI
XEN PWD REASI
CONSTRUCTION OF LINK ROAD TO WAZIR MOHALLA ARNAS, REASI UNDER UT ROAD SECTOR ( ONGOING WORKS)
2026_PWDJK_320792_2
e-NIT No.38 of 2026-27 Dated 12-08-2026
Open Tender
Civil Works
Percentage
365 days
REASI
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
XEN PWD REASI
₹44,500
13 Aug 2026
13 Aug 2026
31 Aug 2026
13 Aug 2026
29 Aug 2026
13 Aug 2026
13 Aug 2026 - 29 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and Disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 43.2 | Cum | 256.85 | ₹11,095.92 |
| 2 | Providing, laying, spreading and compacting graded stone aggregate (size
range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification
including premixing the material with water at OMC in mechanical mix
plant, carriage of mixed material by tipper to site, for all leads & lifts,
laying in uniform layers with mechanical paver finisher in sub- base / base
course on well prepared surface and compacting with vibratory roller of 8
to 10 tonne capacity to achieve the desired density, complete as per
specifications and directions of Engineer-in-Charge | 151.2 | Cum | 1,885.95 | ₹2,85,155.64 |
| 3 | Providing and applying tack coat using bitumen emulsion conforming to
IS: 8887, using emulsion pressure distributer including preparing the
surface and cleaning with mechanical broom. On W.B.M. /W.M.M. @ 0.4 Kg/sqm | 2,016 | Sqm | 31.6 | ₹63,705.6 |
| 4 | Providing and laying bituminous macadam using crushed stone aggregates
of specified grading premixed with bituminous binder, transported to site
by tippers, laid over a previously prepared surface with paver finisher
equipped with electronic sensor to the required grade, level and alignment
and rolling with smooth wheeled, vibratory and tandem rollers as per
specifications to achieve the desired compaction and density, complete as
per specifications and directions of Engineer-in-Charge.
16.63.1 50 to 100 mm average compacted thickness with bitumen of
grade VG-30 @ 3.5% (percentage by weight of total mix) prepared in
Batch Type Hot Mix Plant of 100-120 TPH capacity. 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @ 3.5% (percentage by weight of total mix) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity | 100.8 | Cum | 8,734.85 | ₹8,80,472.88 |
| 5 | 2.5 cm premix carpet surfacing with 2.25cum and 1.12 cum of stone
chippings of 13.2 mm and 11.2mm size respectively per 100 sqm and 52
kg and 56 kg of hot bitumen per cum of stone chippings of 13.2 mm and
11.2 mm size respectively including a tack coat with hot straight run
bitumen including consolidation with road roller of 6 to 9 tonne capacity
etc. complete (tack coat to be paid for separately). With paving Asphalt grade VG-30 with no solvent. | 2,016 | Sqm | 268.15 | ₹5,40,590.4 |
| 6 | Providing and laying seal coat of premixed fine aggregate (passing
2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg
of bitumen of grade VG-30 bitumen per cum of fine aggregate and
0.60 cum of fine aggregate per 100 sqm of road surface including
rolling and finishing with road all complete | 2,016 | Sqm | 102.85 | ₹2,07,345.6 |
| 7 | Providing and laying River bed material in berms layers not exceeding 20 cm in depth incld. Rolling, watering, and consolidation with power road roller of 8-10 tonne all leads lifts carriages complete | 405 | Cum | 500 | ₹2,02,500 |
| 8 | Carriage of Sand for an av distance of 5Km by MT | 12.1 | Cum | 200.74 | ₹2,428.95 |
| 9 | Carriage of Stone agg for an av distance of 40Km by MT | 50.4 | Cum | 630.74 | ₹31,789.3 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_1067695.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].