Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAccepted-AOC HOUSE NO A 31 POWER CITY JAMSHEDPUR KORBA CHHATTISGARH 495450 | KORBA | CHHATTISGARH | 495450 | ₹9.6 L Quoted ₹8.2 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹8.6 L+₹45,809.06 (5.60%)Rejected-Finance | ₹8.6 L+₹45,809.06 (5.60%) | L2 | Rejected-Finance Not L1 bidder |
| 3 | L3₹9.0 L+₹77,402 (9.47%)Rejected-Finance AMRAIYAPARA KORBA CG 495447 | KORBA | KORBA | CHHATTISGARH | 495447 | ₹9.0 L+₹77,402 (9.47%) | L3 | Rejected-Finance Not L1 bidder |
Tender Value
₹20.3 L
EMD Value
₹25,400
Closing Date
12 Dec 2022, 5:00 pmClosed
Staff Officer Mining SECL Korba Area
Office of the General Manager Korba Area Post and District Korba Chhattisgarh
(1) Dismantling and transportation of 02 nos. direct haulage from (i) 17LE panel to 31LE panel (ii) Surface to 31LE panel and installation at 31LE panel (2) Dismantling, transportation of haulage track line from (i) 17LE panel to 31LE panel and (ii)
2022_SECL_263617_1
SECL/KB/GM/SO(M)/eNIT/22-23/17
Open Tender
Civil Works - Others
Item Rate
180 days
Korba
As per NIT
3 documents required · 3 mandatory
₹25,400
12 Jan 2023
29 Nov 2022
13 Dec 2022
29 Nov 2022
12 Dec 2022
30 Nov 2022
29 Nov 2022 - 5 Dec 2022
Amount
Dismantling, transportation and laying / installation of Direct/ Endless haulage considering at a lead of 2km. max. from old site to new site in UG Dismantling and transportation from (1)14R/18L, 17LE panel to 31LE panel at 42R/29LE (2) Surface workshop to 31LE panel at 62D/29LE and installation at (i) 42R/29LE (ii) 62D/29LE.
Dismantling of Haulage track line of 1200m length i.e. 1200×2=2400m rail of 30lbs from (i) 34D/18LWX to 16D/11LWX = 600M (ii) 18LE/1D to 24D/18L in from 17LE panel = 600M, Total 1200 Mtr.
Transportation of 100m track line (i.e. 2000m×2=4000m rail of 30 lbs) to 31LE panel. (i) from 34D/18LWX to 16D/11LWX = 600M (ii) 18LE/1D to 24D/18L in from 17LE panel = 600M (iii) from surface Work-shop = 800M Total = 2000 Mtr to 26D/29LE in 31LE panel.
Laying of haulage track line in 31LE panel from 26D/29LE to 62D/29L = 880 M 62D/29LE to 62D/46L = 420 M 32LE/62D to 32LE/70D = 200 M 37LE/62D to 37LE/75D = 300 M 42LE/62D to 42LE/69D = 200 M , Total = 2000 Mtr.
Total impact of GST for the purpose of CTC
RAJ KUMAR SHARMA
Jai Maa Bhawani Construction and Suppliers
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .