Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical ok |
| 2 | Accepted-Technical | Accepted-Technical ok |
| 3 | Accepted-Technical MOH SHER MOHAMMAD PILIBHIT | PILIBHIT | UTTAR PRADESH | 262001 | Accepted-Technical ok |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
23 Jan 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
SE ECTC SLDC Campus UPPTCL, Lucknow
Construction of Security wall at 132 KV Sub Station Bisauli Budaun
2025_UPCTL_1103150_1
85/ECTC(L)/2025-26
Open Tender
Civil Works
Percentage
120 days
SE ECTC SLDC Campus UPPTCL
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,080
Superintending Engineer, E.C.T.C. Lucknow
₹1.5 L
24 Feb 2026
31 Dec 2025
24 Jan 2026
31 Dec 2025
23 Jan 2026
31 Dec 2025
CONSTRUCTION OF SECURITY WALL AT 132 KV SUB STATION BISAULI BUDAUN
BILL OF QUANTITY
FOR CONSTRUCTION OF SECURITY WALL AT 132 KV SUB STATION BISAULI BUDAUN .
(Rate as per Current SOR 05/2024 based on Issued DSR- Group 05)
Total
Conditions:
1.The quantities are tentative and may vary to any extent or deleted during execution as per actual approved lay out plan & site condition.
2.Pozzlona Portland cement confirming to IS 1489(Part 1) 1991 of approved quality like ACC,Ultra-Tech,Birla or equi.shall only be used.
3.Overweight steel section within tolerance shall be measured at standard weight and underweight steel section within tolerance shall be measured at actual weight.
4.In case any change in Bill of Quantity is suggested by higher authority that will be binding on the contractor. The agreement shall be executed on the approved Bill of Quantity only.
5.In case of dismantling of civil structure at site, 60% brick work shall be treated as fresh brick, 30% as brick bat & 10% as debris. Fresh brick & brick bat shall be issued to contractor/ firm at prevailing/pertaining SOR.
6.The amount of scrap steel recovered from dismantling shall be issued to contractor/ firm at 1/3rd of rate in prevailing/pertaining SOR.
7. Rates in BOQ Are exclusive of GST. Labour Cess shall be borne by contractor.
8. All civil work shall be execute according to the approved drawing of UPPTCL.
9. All civil work shall be carried out as per UPPTCL/UPPWD specifications.
10. Rates quoted by the contractor shall be Inclusive of all charges/contingencies that may be encountered at the site. Only GST bill be paid extra as applicable.
11. The Contractor will submit all papers of royalty related to the material use at site in divison office .
12. Drawing if required will be submitted by the contractor for approval by completent authority the cost of which shall be borne by the contractor.
13 .If tendered or quoted rates are below w.r.t. Departmental SOR then additional security / performance guaranty shall be deposited by entered as per GO. No.622/23-12-2012-02-audit-08.
14 . The contractor will make necessory arrangements of testing of material cubes or any other testing as per direction on engineer in charge and submit 3 copies of test results in division office. The cost of which will be borne by the contractor.
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.26 MB
Tendernotice_2.pdf
PDF • 0.59 MB
BOQ_2034278.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .