| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹67.1 LAccepted-AOC | ₹67.1 L | L1 | Accepted-AOC AOC |
| 2 | L2₹70.3 LRejected-Finance | ₹70.3 L | L2 | Rejected-Finance L2 |
| 3 | L3₹93.0 LRejected-Finance | ₹93.0 L | L3 | Rejected-Finance L3 |
Tender Value
₹1.1 Cr
EMD Value
₹7.3 L
Closing Date
16 Feb 2026, 12:00 pmClosed
SE, BSR CIRCLE, PWD, BULANDSHAHR
SE, BSR CIRCLE, PWD, BULANDSHAHR
New Construction work of Aurangabad Taharpur to Siddhababa Mandir
2026_CEMRT_1111965_1
1312 /96M/E-TENDER/BSR CIRCLE/2025-26 Dated 28.01.2026
Open Tender
Civil Works - Roads
180 days
SE, BSR CIRCLE, PWD
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
₹7.3 L
Yes
SE, BSR CIRCLE, PWD, BULANDSHAHR
5 Mar 2026
10 Feb 2026
16 Feb 2026
10 Feb 2026
16 Feb 2026
10 Feb 2026
11 Feb 2026
Part (A) Bituminous Part Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3. Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST.
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. Including complete shifting of matrials & Concrete etc and cost of all material, labour, T&P, royality, all taxes and labour cess complete . But excluding GST.
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density. Including complete shifting of matrials & Concrete etc and cost of all material, labour, T&P, royality, all taxes and labour cess complete . But excluding GST.
(Cement Treated Base) providing, laying and spreading in uniform layers with motor grader on a preparedSub base, Cement @ 4% by weight to the spread Material manually,mixing in place with Rotavator and compacting with Road roller at OMC to achieve the desired unconfined compressive strength and form a layer of base. Including cost of all material, labour, T&P,and royalty but excluding cost of GST.
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. Including complete shifting of matrials & Concrete etc and cost of all material, labour, T&P, royality, all taxes and labour cess complete . But excluding GST.
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades as per MORD specifiction clause 508. Including cost of, all material, Bitumen, labour, T&P, royality , all taxes and labour cess complete. But excluding GST.
Providing and laying seal coat by manual means with VG-10 Grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510. Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST.
Supply and Fixing of 350mm dia NP3 type Hume Pipe S&S in position including labour and T&P etc. required for proper completion of work. Including complete shifting of matrials & Concrete etc and cost of all material, labour, T&P, royality, all taxes and labour cess complete . But excluding GST.
Maintenance Charges for Part-A (Bituminous Road Part) Maintenance Charge including Earth Work, repair of painted surface, earthwork on patri, culvert, road furniture etc. as direction of E.I. for the period of five years from the actual completion of work. Maintenance cost for 2nd year @ 0.75% of total work amount
Maintenance Charge including Earth Work, repair of painted surface, earthwork on patri, culvert, road furniture etc. as direction of E.I. for the period of five years from the actual completion of work. Maintenance cost for 3rd year @ 1.5% of total work amount
Maintenance Charge including Earth Work, repair of painted surface, earthwork on patri, culvert, road furniture etc. as direction of E.I. for the period of five years from the actual completion of work. Maintenance cost for 4th year @ 2.25% of total work amount
Maintenance Charge including Earth Work, repair of painted surface, earthwork on patri, culvert, road furniture etc. as direction of E.I. for the period of five years from the actual completion of work. Maintenance cost for 5th year @ 3% of total work amount
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
Tendernotice_2.pdf
PDF • 1.70 MB
BOQ_2055997.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid