Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.8 L
Closing Date
3 Jul 2020, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE (Seabird),Naval Base, Karwar
GE (Seabird),Naval Base, Karwar-581308
MANNING and OPERATION OF MAIN RECEIVING CUM DISTRIBUTION SUB STATION MDSS AT NAVAL BASE, KARWAR
2020_MES_354451_1
3002/09/E3 dt 20/06/2020
Limited
Job Works
Works
30 days
GE (Seabird), Naval Base, Karwar
Please refer Tender documents.
1 document required · 1 mandatory
₹0
Exempted
4 Jul 2020
20 Jun 2020
4 Jul 2020
20 Jun 2020
3 Jul 2020
20 Jun 2020
45 days
Amount
MANNING & OPERATION OF MAIN RECEIVING CUM DISTRIBUTION SUB STATION (MDSS) AT NAVAL BASE , KARWAR 30 days 1. Manning and Operation of Main Receiving cum Distribution Sub Station (MDSS), 11 KV HT supply for 03 (three) shifts of 8 hours each on all days including Sundays and holidays including routine maintenance / checks & attending emergency breakdowns at distribution Sub Stations DSS 6, DSS 4, DSS 4A, DSS UC and connected feeder pillars all as specified and directed by Engineer-in-Charge. The installation comprises of following equipments :- (a) 11 KV, 1250 Amps, indoor type HT VCBs - 42 Nos (B) LT distribution panel board for substation lighting & CPP motors. (C) Battery bank - 1 No (D) Ventilation system. NOTE:- Contractor has to employ minimum following staff for Manning and operation of the MDSS per shift of 8 hours each. (l) One No Highly skilled electrician / operator having minimum ITI qualification in Electrician trade from Govt recognized institute with adequate knowledge and minimum 2 years experience in Maintenance & Operation of HT & LT electrical installation. The operator must be competent to carry out the routine maintenance of MDSS, calibration and setting the IDMT relays and handle the power monitoring SCADA system all as directed by Engineer-in-Charge. (ii) One No helper having minimum 10 th pass with adequate experience.
GENERAL NOTES FOR ITEM No 2: - (i) The unit rate quoted shall be deemed to include for cost of labour for daily routine maintenance for trouble free functioning of installations. (ii) The operator employed by the contractor shall be capable of carrying out minor maintenance & unit rate quoted shall be deemed to be include for cost of stationery, ink cartridge for printer, cotton waste, petroleum jelly for battery terminals etc. (iii) The operator / helper will ensure general area cleanliness and upkeep of the installation on daily basis. (iv) In case of failure due to absence of operative staff, the contractor shall be liable to pay compensation at twice the cost of a day’s Manning & Operation derived from pro rata rate of Sch ‘A’ quoted rates. v) The contractor will ensure general area cleanliness and upkeep of the installation and area around it on daily basis. In case of failure, a penalty of Rs 2000/- per month will be levied and recovered from dues. (vi) The unit rate quoted shall deemed include for maintenance for earth pits, cutting & removing of vegetation and upkeep of the surrounding area, all around the bldg up to 6m from the plinth protection all as directed by Engr-in-Charge. (vii) The Contractor shall not employ same tradesman continuously for more than 11 months. (viii) The contractor shall provide 02 uniforms to each operator & helper and design of uniform shall be got approved from Engineer-in-charge. In case contractor fails to provide the uniform, recovery @ of Rs 1200/- per uniform will be recovered.
(ix)The rate quoted shall deemed to be inclusive of safety gear & required tools for minor maintenance. In case of failure to provide tools kit & safety kit (Gum boots-02 pairs, hand gloves), a penalty of Rs 3000/- will be recovered and levied (x) The Contractor shall pay the wages to the operators/helpers (as applicable) through e-payment i.e Aadhaar linked bank accounts (credit to their bank account). Engineer-in-charge shall ensure that e-payment made to operator/helpers and their wages shall not be less than minimum wages fixed by state Govt or Central Govt whichever is more. Monthly e-banking statement shall be furnished by the contractor to the Engineer-in-charge and the same shall be kept in record duly verified. (xi) It is the responsibility of contractor to deposit the employees provident fund (EPF) to the concerned authority as per the prevailing scales as laid down by Ministry of labour for all operator/helper (as appliable) and necessary proof to this regard shall be submitted to the Engineer-in-charge for verification & record. The quoted rates shall be demand to be included of above provisions. In case contractor fails to produce the proof of EPF, the same shall be recovered from his dues as per the prevailing scale plus 15 percent profit. (xii) The contractor shall maintain all the registers under various labour law rules, 2017 and shall be produced to the Engineer-in-Charge as well as officers detailed by central labour department.
Terms & conditions 1. Rates quoted will deemed to have included all taxes like GST as applicable and no separate cost wise be paid on account of same. 2. Unserviceable dismantled materials will be the property of the department. 3. You will liable for completion of job works within 20 days of placing Job Order. 4. 100% payment will be made on completion of job work against your bill. 5. Job Order can be closed in short notice (i.e 24 hours in advance) on Acceptance of Tender and the payment will be made till the date of acceptance of tender.
JAI SHREE GOPAL ELECTRICALS
OM SAI ELECTRICALS AND HARDWARES
POPULAR ENTERPRISES
SHRI MALLIKARJUN BATTERY AND ELECTRICAL WORKS
stage.html
html • 0.02 MB
finance_395790.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .