| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.0 CrAccepted-AOC | ₹5.0 Cr | 1 | Accepted-AOC Found reasonable |
| 2 | Rejected-Technical NOT SPECIFIED | - | - | Rejected-Technical EMD and other Documents not Submitted |
| 3 | Rejected-Technical B 12 VISHAKARMA JYOTI SUBHASH LANE MALAD E MUMBAI 400097 | MUMBAI SUBURBAN | MAHARASHTRA | 400097 | - | - | Rejected-Technical EMD and other Documents not Submitted |
Tender Value
₹5 Cr
EMD Value
₹5.8 L
Closing Date
29 Nov 2023, 6:00 pmClosed
DG MAP
DG MAP E-in-Cs Branch Kashmir House Rajaji marg New Delhi-110011
COMPLETION OF BALANCE WORKS FOR CONSTRUCTION OF DWELLING UNITS INCLUDING ALLIED SERVICS FOR OFFICERS ORS AT KALINA AND MALAD MUMBAI
2023_MES_607287_2
CA No DGMAP PH II PKG 28 MUMBAI R C OF 2023 24
Open Tender
Construction Works
Lump-sum
182 days
Kalina Malad Mumbai
As per NIT
11 documents required · 11 mandatory
₹2,000
DGMAP
₹5.8 L
31 Jan 2024
26 Oct 2023
1 Dec 2023
26 Oct 2023
29 Nov 2023
15 Nov 2023
26 Oct 2023 - 31 Oct 2023
Amount
SCH "A " SECTION - II INTERNAL WATER SUPPLY Total of Sch " A " Section -II
SCH "A " SECTION - III INTERNAL ELECTRIFICATION Total of Sch " A " Section -III
SCH "A " SECTION- IV ROAD, PATH Total of Sch " A " Section -IV
SCH "A " SECTION- V AREA DRAINAGE AND CULVERT Total of Sch " A " Section -V
Sch 'A' Sec I (Building Works) Note: This schedule is not pre-priced and the prepriced rate indicated as "0.00" under Col 5 signifies this fact only -
Completion of balance works of Construction of block of 4 DUs for Major and above (G + 1, 2 DUs in each floor) in RCC framed structure with PCC block masonry wall including car garages, covered stair case, servant quarters, balconies, lofts, passages, built in furniture as specified, plinth protection, water storage tanks including staging, loft tanks complete including RCC foundations all as specified and shown on drawings at Kalina Mumbai
Completion of balance works of Construction of block of 3 DUs for Major & above (G + 1, 2 DUs at GF + 1 DU at FF), in RCC framed structure with PCC block masonry wall including car garages, covered stair case, servant quarters, balconies, loft, passages, built in furniture as specified, plinth protection, water storage tanks including staging, loft tanks, complete including RCC foundations all as specified and shown on drawings at Kalina Mumbai.
Completion of balance works of Construction of block of 4 DUs for Major and above (G + 1, 2 DUs in each floor) in RCC framed structure with PCC block masonry wall including car garages, covered stair case, servant quarters, balconies, lofts, passages, built in furniture as specified, plinth protection, water storage tanks including staging, loft tanks complete including RCC foundations all as specified and shown on drawings at Malad Mumbai.
Completion of balance works of Construction of block of 28 DUs for ORS (G + 3, 4 DUs at GF and 8 DUs each in F.F., S.F. & T.F.) in RCC framed structure, including plinth protection, platforms, steps, ramps, covered stair case, balconies, cup boards with built in furture, RCC lofts shelves, garages etc complete water storage tanks including staging, loft tanks, including RCC foundations, all as speficied and shown on drawings at Kalina Mumbai.
Completion of balance works Construction of block of 18 DUs for ORS (G + 2, 6 DUs in each floor) in RCC framed structure, including plinth protection, platforms, steps, ramps, covered stair case, balconies, built in furniture as specified, RCC lofts shelves, water storage tanks including staging, loft tanks etc complete including RCC foundations, all as speficied and shown on drawings at Kalina Mumbai.
Completion of balane works Construction of block of 6 DUs for ORS (G + 2, 2 DUs in each floor) in RCC framed structure, including plinth protection, platforms, steps, ramps, covered stair case, balconies, built in furniture as specified, RCC lofts shelves, water storage tanks including staging, loft tanks etc complete including RCC foundations, all as speficied and shown on drawings at Malad Mumbai.
Completion of balance works Construction of block of 9 Scooter garages for ORs with RCC framed structure including foundations, RCC roof, RCC Shelves, ramps etc complete all as specified and shown on drawings at Kalina Mumbai.
Completion of balance works of Construction of block of 6 Scooter garages for ORs with RCC framed structure including foundations, RCC roof, RCC Shelves, ramps etc complete all as specified and shown on drawings at Malad Mumbai.
Completion of balance works of Construction of garbage bin with plinth protection at Malad complete all as specified and shown on drawings.
Construction of garbage bin with plinth protection at Kalina complete all as specified and shown on drawings.
SCH "A " SECTION - VI STREET LIGHTING
JM & L sand filling in & around the cable including in & around punning down for cushioning complete as directed by Project Manager.
Supplying & laying unreinforced precast concrete cable cover class HVP type 1 with peak size 300 mm x 180 mm x 40 mm (Sub Class-B) laid in trenches for LT Cable protection complete as directed by Project Manager.
Supply, laying & jointing reinforcement concrete pipe 100 mm bore class NP-2 including collars as necessary for road crossing all as specified & directed (Earth work shall be measured & paid separately under respective item of schedule-A
Supply & laying in trenches/ pipe/ duct floor cable heavy duty armoured XLPE insulated & sheathed as per IS 1100 Volts grade Aluminium stranded conductor cable earth of size 6 sqmm 4 core all as specified & directed by Project Manager (Earth work sand cushioning & cable cover shall be measured & paid separately)
Supply & laying in trenches/ pipe/ duct floor cable heavy duty armoured XLPE insulated & sheathed as per IS 1100 Volts grade Aluminium stranded conductor cable earth of size 25 sqmm 3.5 core all as specified & directed by Project Manager (Earth work sand cushioning & cable cover shall be measured & paid separately)
Supply & termination of 4Cx 6Sq mm aluminium armoured cable with suitable size single compression brass cable gland & copper lugs complete.
Supply & termination of 3.5Cx 25Sq mm aluminium armoured cable with suitable size single compression brass cable gland & copper lugs complete.
Supply & erecting of steel tubular swaged poles including foundation as per manufacturer's design, single bend to shape complete with cast iron base plates, bolts, nuts & screws as specified Type 410 SP-31 (9.00 Metre long) complete suitable for street light fittings with painting two coats of aluminium paint over a coat of red oxide zinc chromate primer complete.
Supply & Laying of 2x2.5 Sq mm +1.5 Sq mm Multistrand copper conductor FRLS wire with 2 mm thick PVC sleeve of suitable size from street light pole marshalling box to light fixture complete with termination to MCB as directed by Project Manager
M & L for PCC 1:4:8 D-2 using stone aggregate of 40mm grade as in foundation concrete for pole including finishing the exposed surface using extra cement all as specified as per drawings & specification.
M & L for PCC 1:2:4 type B1 using stone aggregate of 20 mm grade as in foundation concrete for pole including finishing the exposed surface using extra cement all as specified as per drawings & specification.
Supply & errection of weather proof marshalling box with hinged door with proper size gasket etc. of size 300 x250 x135 mm for street light poles made of 14 SWG GI sheet with two coats of enamel paint red oxide primer along with 6 Amps SP MCB on din rail for phase & terminals blocks 3C x2.5 Sq mm cable glanding & proper fixing of clamp with bolts & nuts complete all as specified & directed by the Project Manager
Supply & fixing of street light luminaries HPSV 150 W single piece die cast/ Deep drawn aluminium housing complete with control gear compartment acrylic cover UV stabilised, blast of dual taping dynamic power shaving device of reduce power & wattage to 100W after 6 hours of peak load pre-wired complete with lamp & including arrangement for mounting GI pipe suitable size bracket arm complete with connection etc as specified
Supply & laying earth continuity conductor for main earthing lead of size 8 SWG (4 mm dia) GI wire fixed to wall or chased buried in ground or fixed to poles or any other indicated situation for loop earthings as required.
Earthing complete with galvanised steel earth pipe electrode 40 mm bore medium grade 2.5m length buried directly & preferably vertically in ground with top edge not less than 1.25 metres below ground level connected with earthing lead of 4mm dia galvanised iron of steel wire all as shown in Plate No-4-SSR Part-I to the earthing test point all as specified & indicated including earth pit & trench, excavation, removal of surplus soil, PCC pit cover with fitting hook, funnel with watering pipe with wire mesh, charcoal salt, testing.
Earthing complete with galvanised steel earth plate electrode 600 x600 x 6 mm thick buried directly in ground not less than 2.25 metres deep connected to galvanised iron strip 32 x6 mm as earthing lead by means of bolts, check nuts & washers of galvanised iron of steel wire all as shown in drg details, earth pit & trench connected to earthing test point all as specified & indicated with & including excavation & earth work in any type of soil & removal of surplus soil up to 50m, PCC pit cover with lifting hook, funnel with watering pipe with wire mesh, charcoal salt testing.
Supply, installation & commissioning of feeder pillar for street lights, cubicle type weather proof double door & sloped canopy outdoor type, totally enclosed factory made, dust & vermin proof, fabricated from CRCA sheet minimum 2 mm thick including painting as per the 7 tank process suitable for 415 Volts, 3-Phase, 50 C/S AC supply & space for spare feeders as shown including the cost of RC pedestal (1:2:4) to be included in the rate offered for each item & comprising of the following INCOMING (I) MCB, 3-Phase, 4 Pole, 63 Amps 25 KA 415 Volts -1 No (ii) Bus bars, 3-Phse, 4 Strips of Aluminium strips, 25KA rating, 100 Amps - 1 set OUTGOING a) 20 Amps TPN MCCB, 25 KA,415Volts, 3 Phase- 415 Volts 50 C/S AC supply - 3 Nos with Timer switch 415 Volts, 3 Phase-, 415 Volts, 50 C/S AC Supply of 20 Amps rating with contractors 3 phase complete fittings & connection to LT cable for street light poles, use of timer controls (With feeder pillars) with control to reduce the lighting as under:- (I) 6 PM to 10 PM : 100% (ii) 10 PM to 02 PM - 66% (iii) 2 PM to 6 PM-33%
M&L for rendering 10mm thick plaster on fair faces of brick work or concrete surface in CM 1:4 finished even & smooth without using extra cement.
Supply & fixing 40mm GI pipe light grade 1.2 M long partly in ground and partly along with the existing pole bending etc as required.
Numbering of street light pole with enamel paint complete all as specified
SCH "A " SECTION - VII EXCAVATION,EARTHWORK& SITE CLEARANCE Total of Sch " A " Section-VII
SCH "A " SECTION - VIII SCHEDULE OF CREDIT
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .