| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹72.8 LAccepted-Finance GRAM GUTHNA BUZURG POST KAMHARA JANPAD LAKHIMPUR | LAKHIMPUR | UTTAR PRADESH | L1 | Accepted-Finance BID ACCEPTED DUE TO LOWEST RATE | |
| 2 | L2₹72.9 L+₹10,957.55 (0.15%)Rejected-Finance 0 272 273 1 | L2 | Rejected-Finance BID REJECTED DUE TO HEIGHER RATE | |
| 3 | L3₹87.6 L+₹14.7 L (20.2%)Rejected-Finance | L3 | Rejected-Finance BID REJECTED DUE TO HEIGHER RATE | |
| 4 | L4₹89.7 L+₹16.9 L (23.2%)Rejected-Finance VARANASI | VARANASI | UTTAR PRADESH | L4 | Rejected-Finance BID REJECTED DUE TO HEIGHER RATE |
Tender Value
₹90.3 L
EMD Value
₹1.8 L
Closing Date
6 Aug 2024, 2:00 pmClosed
Superintending Engineer
Irrigation Works Circle Sitapur
Fabrication and installation, repair work of steel gates of miners under the control of National Water Management Project, Sharda Canal Division, Shahjahapur (Lot No.-03)
2024_UPIDC_939746_3
01/SE/2024-25
Open Tender
Civil Works
Item Wise
180 days
Shahjahanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹1.8 L
29 Aug 2024
23 Jul 2024
6 Aug 2024
23 Jul 2024
6 Aug 2024
23 Jul 2024
Amount
Earth work in foundation in dry ordinary soil (loam clay or sand) including lift up to 1.5 meter and lead up to 30 meter.
C.C. 1:3:6 i/c cost of all material, labour and T&P etc.
1st class Brick Masonary in 1:3 with cement and corse sand i/c cost of all material, labour and T&P with all lead and lift for proper completion of work approved by Engineer - in- charge etc.
Cement pointing in 1:2 (Deep struct ) on Brick masonry i/c cost of material, labour and T&P etc.
Color washing with lime on udercorated wall surface two coats over and and including a primary coat including all material ,labour and T&P etc.
Earth work in embankment by power transpotad earth with a led beyond 200 M and upto 1 k.m. encluding execavation, loding, unloding, manual compection, dressing and all lifts complets.
Laying Boulder in Toe wall in wire crates work (Wire crate of size 2.50m x0.60mx1.00m )including cost of all material and labour and T&P required for proper completion of work.
R.R. Stone Masnory (1:4 Cement Mortar) in construction of toe wall and sleepers for boulder pitching including cost of all material and labour and T&P required for proper completion of work.
Laying Pea Gravel 4 to 12 mm including cost of all material and labour and T&P required for proper completion of work.
Laying Pea Gravel 12 to 20 mm including cost of all material and labour and T&P required for proper completion of work.
Supplying and laying boulder 20 to 40 kg on side slopes and d/s of syphon including cost of all material and labour and T&P required for proper completion of work.
TRISHIRA CONSTRUCTION PVT LTD
M/S K.G.N. TRADERS
M/S S K ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .