Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical 40 SAPTHAGIRI COLONY JAFFERKHANPET CHENNAI 600 083 | CHENNAI | CHENNAI | TAMIL NADU | 600083 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical BEEKAY HOUSE C 450 451 SECTOR 10 NOIDA 201301 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical M 65 M I D C HINGNA ROAD NAGPUR 440016 | NAGPUR | NAGPUR | MAHARASHTRA | 440016 | Admitted-Fee/PreQual/Technical |
Tender Value
₹51.3 Cr
EMD Value
₹51.3 L
Closing Date
11 Jul 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE/MTPS-II
CE/MTPS-II/ Mettur Dam.
Design, Supply, Erection and Commissioning of Augmentation of Dry Fly ash Handling system PDFACS Dense phase pneumatic conveying system 1 set
2022_EB_236670_1
CE MTPSII SE PA EE MM OT No 1043M 2022 23
Open Tender
Miscellaneous Goods
Supply
365 days
MTPS-II/ Mettur dam.
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹51.3 L
Yes
SE PA MTPS II
12 Jul 2022
20 Jun 2022
12 Jul 2022
20 Jun 2022
11 Jul 2022
20 Jun 2022
27 Jun 2022
180 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply Portion A) STAGE-I (From ESP 1st & 2nd field hoppers to New intermediate fly ash storage silo) A1- System at ESP 1st & 2nd row field hoppers (16 Nos. hoppers) consisting of Complete set - Suitable for taking feed from 16 nos. ESP hoppers, consisting of
• 16 nos. RF admittance type permissive level switches,B14
• 16 nos. Adopter cum downcomer pipes to suit ESP hoppers outlet,
• 16 nos. Manual Hand wheel operated knife Gate Valves,
• 16 nos. Expansion joint cum spool pieces,
• 16 nos. Pneumatic conveying Vessels each with inlet valve Complete With Pneumatic panels & electro Pneumatic controls,
• Fluidizing Blowers are required for 16 Nos. of frontline ESP hoppers & fluidizing air supply for Intermediate SILO. (Heaters + Piping + Pads) | 1 | set | - | - |
| 2 | Supply Portion A) STAGE-I (From ESP 1st & 2nd field hoppers to New intermediate fly ash storage silo) A2 - 4 lots MS ERW conveying pipe line along with Hardwares like Flanges, Gaskets, Fasteners & U-Clamps as per IS 1239/3589,
• 4 Nos. 2 / 1 way switch over valves for clubbing the pipe lines of
ESP fields
• 4 lots 90˚ / as required long radius MS Fabricated Cast Basalt /DRC lined Flanged bends
• 4 Nos. Terminal End Boxes.
• The Fly ash filter materials quality should be 50mg/Nm3 with temperature resistant of 140 Degree C.
• The material quality of Dome valves are alloy C.I with 250BHN hardness, Disc with 10mm thick SS ( 350BHN), Seat of replaceable type SS smooth finish with a hardness of 250BHN minimum.
• The fly ash conveying pipe’s material should be of MS as per IS. 3589 of 9.5mm wall thickness. | 1 | set | - | - |
| 3 | Supply Portion B.) STAGE-II (From intermediate Fly Ash Storage silo to main Fly ash storage silos #1 & 2) B1- 300MT intermediate fly ash silo Top facilities – MS structures with RCC supports | 1 | set | - | - |
| 4 | Supply Portion B.) STAGE-II (From intermediate Fly Ash Storage silo to main Fly ash storage silos #1 & 2) B2 - One Set consisting of
• 1 no. Reverse Pulse jet Bag filter,
• 1no. Vacuum cum pressure Air Balance valve.
• 1 no. RADAR type continuous level monitoring for silo,
• 1 no. High level switch for back up protection. | 1 | set | - | - |
| 5 | Supply Portion B.) STAGE-II (From intermediate Fly Ash Storage silo to main Fly ash storage silos #1 & 2)B-3 Two sets - Consisting of Long distance, high tonnage conveying system comprising.
• 4 no. downcomer pipes,
• 4 no. expansion joints,
• 4 no. knife gate valves,
• 4 no. pressure conveying vessels suitable for application complete with pneumatic panels & electro pneumatic control.
• 2 lots MS ERW conveying pipe line along with Hardwares like flanges, Gaskets, Fasteners & U-Clamps as per IS 1239/3589.
• 2 lots 90˚ /as required long radius MS Fabricated Cast Basalt / DRC lined flanged bends,
• 2 no. ½ way Diverter Valve for selection of either of Main FA silo # 1 & 2
• 4 no. Terminal End Box.
• In order to prevent the SILO chamber pressurizing in case, SILO vent fans are to be provided.
• Dry Ash extraction system = 1 x 100 TPH system. | 1 | set | - | - |
| 6 | Supply Portion C)Utilities C1 - Conveying Air System for stage – I
• Three No’s - (2W+1SB) Air/ Water cooled, skid Mounted, Oil injected/Oil free Screw type New Air Compressors having discharge pressure and capacity to handle and evacuate an ash quantity of not less than 135 TPH complete with accessories and drive motor unit.
• Two No’s – New Conveying Air receivers complete with pressure Gauge, pressure Switch, pressure relief valve & Auto Drain Trap with Manual By- Pass along with MS ERW Heavy duty conveying air pipes & piping work as Required.
• Two No’s - (1W+1SB) Water cooled, skid Mounted, Oil free screw type
New Instrument Air Compressors having discharge pressure of 7 - 8 Kg/Sq.cm. (G) Complete with accessories & drive motor unit, along with the air pipe & Piping work and controls with Instrument air receivers.
• Two No’s - (1W+1SB) Instrument Air dryer.
• Two No’s - 1W+1SB twin lobe fluidizing air blowers with Electric air heater, Flow pads, fluidizing pads for fluidizing of pneumatic conveying vessels along with heat insulated MS ERW fluidizing air pipes & piping work | 1 | set | - | - |
| 7 | Supply Portion C)Utilities C2 - Transport Air System for stage-II
For each conveying line from intermediate SILO to the main SILO. 2 Nos. of working and 1 No. of Stand by transport air Compressors (All the 3 nos. of compressors each having same capacity) (2W+1 S/B) water cooled, skid mounted, oil free screw type new air compressors having adequate discharge pressure and capacity to handle and convey the ash quantity of not less than 90 TPH complete with accessories and drive motor unit, each compressors O/L connected to the air receiver of the respective conveying line. Hence for 2 conveying lines this transport air Compressors sets are (2W+1 S/B) x 2 accordingly with air pipes & piping work.
(OR)
For each conveying line from intermediate SILO to the main SILO. 1 No. of working and 1 No. of Stand by transport air Compressors (Both the 2 nos. of compressors each having same capacity) (1W+1 S/B) water cooled, skid mounted, oil free screw type new air compressors having adequate discharge pressure and capacity to handle and convey the ash quantity of not less than 90 TPH complete with accessories and drive motor unit, each compressors O/L connected to the air receiver of the respective conveying line. Hence for 2 conveying lines this transport air Compressors sets are (1W+1 S/B) x 2 accordingly air pipes & piping work.
Two No’s – New Transport Air Receivers complete with pressure Gauge, Pressure switch, pressure relief valve & Auto drain trap with Manual by-pass along with MS ERW heavy duty conveying air Pipes & piping work as required.
Two No’s. - (2W) Silo vent fan complete with accessories & drive motor unit.
These new set of 4working+2standby (or) 1working+1standby new compressor sets and 2 New Transport Air receivers are to be installed for two streams (Stage II – A & B). | 1 | set | - | - |
| 8 | Supply Portion C)Utilities C3 - New 300MT intermediate fly ash silo fluidizing system
Two No’s - 1W+1SB twin lobe fluidizing air blowers with Electric air heater, Flow pads, fluidizing pads for fluidizing of intermediate fly ash Storage silos along with heat insulated MS ERW fluidizing air pipes & connected piping complete set.
• Mixing apparatus provision (but not consisting the slurry disposal pumps and lines), have to be provided. Fly Ash unloading Chute provision at intermediate SILO to facilitate the Bulker loading has to be provided.
• Provision of Direct Loading facility of fly ash, from the proposed intermediate fly ash silo to the bulk ash conveying vehicles
The fly ash loading provision from the intermediate silo to the Bulker trucks should be in such a way with required height and with a capacity of 90 TPH. | 1 | set | - | - |
| 9 | Supply Portion D) Electricals D1 - One No. 3.3 kV HT Board with bus coupler and outgoing feeders with vacuum contactors for conveying air compressors and transport air compressors and spare feeder.
One No - 415V, 3 phase, 4 wire, Non Draw out, Free standing, floor Mounted LT MCC with ACB incomers & Outgoing feeder as required for intermediate silo Fluidizing Blowers and LT loads power supply with feeders of each rating & type | 1 | set | - | - |
| 10 | Supply Portion D) Electricals D2 - One Lot – 11 kV/6.6 kV Grade XLPE - FRLS armoured multistrand aluminium power cable.
One Lot - 1.1 kV (E) Grade FRLS PVC insulated, armoured aluminium power & armoured multistrand copper control cable & cabling Work as required for fluidizing Blowers and other LT loads in bidder’s scope of supply | 1 | set | - | - |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_278650.xls
BOQ Document • 0.32 MB
100217899.pdf
Tender Document • 0.82 MB
100217901.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .