| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAdmitted-Fee/PreQual/Technical/Finance | ₹2.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.9 LAdmitted-Fee/PreQual/Technical/Finance KERADAMATTAM KOTAGIRI | ₹2.9 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.9 LAdmitted-Fee/PreQual/Technical/Finance | ₹2.9 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹3.1 LAdmitted-Fee/PreQual/Technical/Finance | ₹3.1 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹3.3 LAdmitted-Fee/PreQual/Technical/Finance | ₹3.3 L | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | ASHOKAN L4 | B.R.VISHU (JB Andal Builder / Vishnu Construction) L1 | N.Ezhilan (Vinayaga Contractor) L3 | S.K.BUILDERS and FLAT PROMOTERS L5 | purushothaman L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Conducting geophysical survey inlcuding conveyance of survey instrument and other labour charges etc., complete. | 1 | No | 2,200 ₹2,200 | 3,486 ₹3,486 | 4,500 ₹4,500 | 3,800 ₹3,800 | 2,000 ₹2,000 Lowest |
| 2.00 | Drilling of 150 / 180mm dia vertical bores in hard rock formation to any required depth as directed by the departmental officers including labour charges for inserting casing pipe, assembling in the drilled hole, including welding the joints if necessary grouting the casing pipe etc, and including transportation charges for the rig and supporting vehicles from one place to another place. I- Depth | 150 | M | 280 ₹42,000 | 273.9 ₹41,085 | 220 ₹33,000 Lowest | 280 ₹42,000 | 280 ₹42,000 |
| 3.00 | Supply and Delivery of 200mm O.D.PVC Casing pipes - 6 KSC- TWAD-2025-26 Pn:18 | 24 | M | 660 ₹15,840 | 636.11 ₹15,266.64 Lowest | 720 ₹17,280 | 660 ₹15,840 | 720 ₹17,280 |
| 4.00 | Supply and Delivery of 150mm O.D.PVC Casing pipes - 6 KSC- TWAD-2025-26 Pn:18 | 24 | M | 500 ₹12,000 | 379.31 ₹9,103.44 Lowest | 420 ₹10,080 | 500 ₹12,000 | 420 ₹10,080 |
| 5.00 | Labour Charges for inserting PVC Casing pipes assembly (with slots or without slots) in the drilled hole including jointing the pipes with PVC Couplers with Cement paste etc., complete, supply and packing the annular space with pebbles of size and quality as approved by the executive engineers of TWAD Board.SOR TWAD-2025-26 Pn:296 150 mm dia Casing Pipes assembly | 24 | M | 500 ₹12,000 | 392.01 ₹9,408.24 Lowest | 420 ₹10,080 | 500 ₹12,000 | 430 ₹10,320 |
| 6.00 | 200 mm dia Casing Pipes assembly | 24 | M | 500 ₹12,000 | 392 ₹9,408 Lowest | 420 ₹10,080 | 500 ₹12,000 | 430 ₹10,320 |
| 7.00 | Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting inclusive of shoring strutting and baling out water wherever necessary and refilling the sides of foundation with excavation earth in layers of not more than 15cm thick will remmed and consoled and departmental officers with initial leads and lists etc including leveling the sites complete complying with standard specification and as desired. | 1 | M3 | 210 ₹210 | 136.95 ₹136.95 Lowest | 165 ₹165 | 210 ₹210 | 165 ₹165 |
| 8.00 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 1 | M3 | 7,100 ₹7,100 | 4,611.17 ₹4,611.17 Lowest | 5,100 ₹5,100 | 7,100 ₹7,100 | 5,555.63 ₹5,555.63 |
| 9.00 | Brick work in following Cement Mortar using best quality Burnt Clay Brick of size 9” x 4 3/8” x 2 3/4” with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | 3 | M3 | 7,600 ₹22,800 | 6,371.22 ₹19,113.66 Lowest | 7,200 ₹21,600 | 7,600 ₹22,800 | 7,676.17 ₹23,028.51 |
| 10.00 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. | 10 | M2 | 242 ₹2,420 Lowest | 243.98 ₹2,439.8 | 250 ₹2,500 | 242 ₹2,420 Lowest | 293.95 ₹2,939.5 |
Tender Value
Refer Docs
EMD Value
₹3,500
Closing Date
13 Aug 2026, 3:00 pmClosed
The Commissioner
Walajapet Municipality
Providing New Borewell with Mini Power Pump and Water tank at Nethaji Street in Ward No 02 In Walajapet Municipality
2026_MAWS_690733_1
483/1/2026/E1
Open Tender
Water Supply/Equipments/Meter/Drilling/Boring
Works
30 days
Walajapet
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,500
13 Aug 2026
5 Aug 2026
13 Aug 2026
5 Aug 2026
13 Aug 2026
5 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Conducting geophysical survey inlcuding conveyance of survey instrument and other labour charges etc., complete. | 1 | No | - | - |
| 2 | Drilling of 150 / 180mm dia vertical bores in hard rock formation to any required depth as directed by the departmental officers including labour charges for inserting casing pipe, assembling in the drilled hole, including welding the joints if necessary grouting the casing pipe etc, and including transportation charges for the rig and supporting vehicles from one place to another place. I- Depth | 150 | M | - | - |
| 3 | Supply and Delivery of 200mm O.D.PVC Casing pipes - 6 KSC- TWAD-2025-26 Pn:18 | 24 | M | - | - |
| 4 | Supply and Delivery of 150mm O.D.PVC Casing pipes - 6 KSC- TWAD-2025-26 Pn:18 | 24 | M | - | - |
| 5 | Labour Charges for inserting PVC Casing pipes assembly (with slots or without slots) in the drilled hole including jointing the pipes with PVC Couplers with Cement paste etc., complete, supply and packing the annular space with pebbles of size and quality as approved by the executive engineers of TWAD Board.SOR TWAD-2025-26 Pn:296 150 mm dia Casing Pipes assembly | 24 | M | - | - |
| 6 | 200 mm dia Casing Pipes assembly | 24 | M | - | - |
| 7 | Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting inclusive of shoring strutting and baling out water wherever necessary and refilling the sides of foundation with excavation earth in layers of not more than 15cm thick will remmed and consoled and departmental officers with initial leads and lists etc including leveling the sites complete complying with standard specification and as desired. | 1 | M3 | - | - |
| 8 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 1 | M3 | - | - |
| 9 | Brick work in following Cement Mortar using best quality Burnt Clay Brick of size 9” x 4 3/8” x 2 3/4” with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc.,complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally.other type of bond shall be done as directed by the Executive Engineer in charge. | 3 | M3 | - | - |
| 10 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. | 10 | M2 | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.33 MB
BOQ_830479.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].