Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
7 Nov 2026, 6:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
GE (NW) BHANDUP
GE (NW) BHANDUP, MUMBAI
REPAIR MAINTENANCE OF SPLIT/ WINDOW AC DEEP FRIDGER, REFRIGERATOR, WATER COOLER, VOLTAGE STABILIZER AND GEYSER INSTALLED AT MD AND OTM ACCN AT INS HAMLA UNDER GE (NW) BHANDUP
2026_MES_794715_1
8542/B
Open Tender
Civil Works
Item Rate
270 days
INS HAMLA, MUMBAI
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE (NW) BHANDUP
₹40,000
Yes
17 Oct 2026
17 Oct 2026
9 Nov 2026
17 Oct 2026
7 Nov 2026
31 Oct 2026
17 Oct 2026 - 26 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Material and Labour for servicing of Window / Split type Air conditioner upto 2 Ton capacity (Any make and any type) involving with following other repairs for smooth operation and satisfactory cooling of AC complete all as specified and directed.
Safety First : Turn off the power at the main circuit breaker or unplug the unit.
Indoor Unit Cleaning:
(i) Filters: Remove the front panel and air filters, then wash with water or clean with a vacuum.
(ii) Evaporator Coils: Remove the front cover to access the coils. Clean with a soft brush, vacuum, or a no-rinse coil cleaner.
(iii) Blower Wheel / Fan: Clean the blower wheel, ensuring the fan does not rotate while cleaning.
(iv) Drainage : Clear the drain pipe / line to prevent water leakage.
(v) Cover Electronics: Use a plastic cover to protect the PCB and electrical components from water.
Outdoor Unit Cleaning:
(i) Condenser Coils: Use a soft brush or water to remove dirt, dust, and leaves from the fins.
(ii) Straighten Fins: Use a fin comb to straighten any bent fins, enhancing air flow.
(iii) Final Steps: Re-assemble the unit once all parts are dry, reconnect the power, and run the AC in cooling mode to verify performance.
Note:- (i) Any unserviceable spares parts / gas charging required for smooth operation and satisfactory cooling of AC shall be measured and paid seperately under appropriate item. (ii) Petty stores such as insulation tape, screws, small pieces of wires, indicator lamp, selector switch, control knob, thermostat switch costing less then Rs 200 shall be provided by the Contractor without any extra cost to the department. | 70 | EACH JOB | - | - |
| 2 | Supply and fixing in original position new hermetically sealed (motor and compressor in a single welded housing) copper wound reciprocating compressor unit for window type AC capacity upto 2 Ton from OEM of any make as existing at site including dismantling, taking out existing old unserviceable reciprocating compressor unit complete all as specified and directed by Engineer in Charge. | 1 | EACH | 1 | ₹1 |
| 3 | Supply and fixing in original position new hermetically sealed (motor and compressor in a single welded housing) copper wound rotary compressor unit for Split type AC of capacity 1.5 Ton from OEM of Make as existing at site including dismantling, taking out existing old unserviceable rotary compressor unit complete all as specified and directed by Engineer in Charge. | 12 | EACH | 2 | ₹24 |
| 4 | Supply and fixing in original position new hermetically sealed (motor and compressor in a single welded housing) copper wound rotary compressor unit for Split type AC of capacity 2 Ton from OEM of Make as existing at site including dismantling, taking out existing old unserviceable rotary compressor unit complete all as specified and directed by Engineer in Charge. | 5 | EACH | 3 | ₹15 |
| 5 | Supply and fixing in repair outdoor copper condenser unit complete for Inverter & Non Inverter Split type air conditioner system, upto 2.0 Ton capacity AC of (Make as approved by GE) complete all as specified and directed by Engineer in Charge.
Note for Item No 2 to 5: Gas charging will be measured and paid seperately under respective item of schedule. | 2 | EACH | 4 | ₹8 |
| 6 | M & L for testing leakage in system of window / split type air conditioner upto 2 Ton capacity (any make and any type) by injecting nitrogen gas upto 300 PSi, repairing leaking spots / joints with gas welding / soldering, replacing unserviceable copper filter pencil type, cleaning & flushing out complete system with gas, making the system leak proof, vaccumising the system complete all as specified and directed by Engineer in Charge. | 10 | EACH | 5 | ₹50 |
| 7 | M & L for testing leakage in system of Window / Split type air conditioner upto 1.5 Ton capacity (any make and any type) by injecting Nitrogen gas upto 300 PSi, repairing leaking spots / joints with gas welding / soldering, replacing unserviceable copper filter pencil type, cleaning & flushing out complete system with gas, making the system leak proof, vaccumising the system complete all as specified and directed by Engineer in Charge.
Note:- (i) Labour component for checking leakage, system fusing, welding, soldering, vaccumising cost there off shall deemed to be included in the unit rate quoted against this item. (ii) Necessary T&P for mechanic shall be arranged by the contractor at his end without any extra cost to the department. | 18 | EACH | 6 | ₹108 |
| 8 | Material & labour for charging of gas R-22 / R-410A / R-32 / R-134(a) / R-290 as existing for Split inverter / non inverter type, Window type Air conditioner system of capacity 2 Ton (AC any type Make) capacity 2 Ton including replacement of copper capillary tube of adequate length, complete all as specified and directed by Engineer-in-Charge. | 10 | EACH | 7 | ₹70 |
| 9 | Material & Labour for charging of gas R-22 / R-410A / R-32 / R-134(a) / R-290 as existing for Split inverter / non inverter type, window type Air Conditioner system capacity upto 1.5 Ton (any make) including replacement of copper capillary tube of adequate length, complete all as specified and directed by Engineer-in-Charge.
Note for Item Nos 2 & 9: (i) Labour componenet & Refrigerant gas for charging of equiptment compressor shall be provided by the firm cost there off shall deemed to be included in the unit rate quoted against this item. (ii) All Engineering works shall be carried out at site / E/M store yard only in presence of Engineer-in-Charge or E/M representative detailed. (iii) No equipment shall be transported /carried out to local market for repairs. (iv) Necessary T & P for gas charging of appliances for mechanic shall be arranged by the contractor at his end without any extra cost from the department. (v) Gas charging at one location will be measured and paid as one job only inspite of charging number of times at same location. (vi) Vehicle convenience involved for transportation of equiptment from MES store, INS Hamla/ site to civil work shop shall be carried out by the firm without any extra cost to the department. | 18 | EACH | 8 | ₹144 |
| 10 | S & F in repair to Power Control Board (PCB) of Split type inverter & non inverter Air conditioner (any make) capacity 2 TR complete all as specified and directed. | 10 | EACH | 9 | ₹90 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
TENDERDOCUMENTS_8542.pdf
Tender Documents • 1.50 MB
BOQ_891312.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .