| 1 | L1₹1.3 CrAccepted-AOC 13 1 3 PUDHUSAMPALLI RAMAN NAGAR METTUR DAM 636 403 | METTUR DAM | SALEM | TAMIL NADU | 636403 | ₹1.3 Cr Quoted ₹1.5 Cr | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | PA and CO L1 |
|---|---|---|---|---|
| 1.00 | Earthwork excavation for cutting and levelling the site in Hard Rock requiring blasting and deposting on bank with an initial lead of 10 mtrs. and lift of 2 m | 231 | m3 | 1,000 ₹2.3 L |
| 2.00 | Earthwork excavation for cutting and levelling the site in Soft disintegrated Rock requiring blasting and deposting on bank with an initial lead of 10 mtrs. and lift of 2 m | 231 | m3 | 250 ₹57,750 |
| 3.00 | Earthwork excavation for cutting and levelling the site in hard gravelly soil and deposting on bank with an initial lead of 10 mtrs. and lift of 2 m | 462 | m3 | 150 ₹69,300 |
| 4.00 | Earthwork excavation for foundation with an initial lead of 10 m and lift of 2 m etc complete.
In hard gravelly soil | 598 | m³ | 150 ₹89,700 |
| 5.00 | Earthwork excavation for foundation with an initial lead of 10 m and lift of 2 m etc complete
In medium rock and dense medium rock not requiring blasting. | 69 | m³ | 400 ₹27,600 |
| 6.00 | Earthwork excavation for foundation with an initial lead of 10 m and lift of 2 m etc complete
Hard Rock requiring blasting & stacking | 34 | m³ | 1,000 ₹34,000 |
| 7.00 | Earthwork excavation for foundation with an initial lead of 10 m and lift of 2 m etc complete
Removing hard rock by wedging and chiseling and trimming to proper shape where blasting is prohibited | 34 | m³ | 2,000 ₹68,000 |
| 8.00 | PCC 1:3:6 using 20mm HBG metal for foundation without formwork including cost of cement, all materials, labour, lead, lift etc. complete | 111 | m³ | 7,000 ₹7.8 L |
| 9.00 | PCC 1:2:4 using 12 to 20 mm HBG machine crushed metal for Transformer plinth, Breaker plinth & other plinth concrete without form work plinth with formwork including cost of cement all materials,labour,lead lift, curing etc., complete. | 90 | m3 | 9,000 ₹8.1 L |
| 10.00 | PCC 1:2:4 using 12 to 20 mm HBG machine crushed metal for Structure Plinth retaining wall, kerb wall concrete with formwork including cost of cement all materials,labour,lead lift, curing etc., complete. | 203 | m3 | 13,000 ₹26.4 L |
Tender Value
Refer Docs
EMD Value
₹1.0 L
Closing Date
25 Sept 2025, 2:30 pmClosed
CE/TP-I/CNI
O/o the Chief Engineer/Transmission Projects I / Chennai, 3rd Floor , 110 KV GIS Substation building A-10, Guindy Industrial Estate, Guindy, Chennai -32
Providing Transformer plinth,Various structure plinths ,cable duct ,RCC road ,Retaining wall ,yard filling ,HBG Metal filling and allied civil works for Proposed Poochur 110 KV substation
2025_EB_603440_1
TP1-82/2025-26 OF CE/TP-I/CNI
Open Tender
Civil Works
120 days
POOCHUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.0 L
28 Apr 2026
12 Sept 2025
26 Sept 2025
12 Sept 2025
25 Sept 2025
12 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_721356.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid