| 1 | L1₹1.3 CrAccepted-AOC 13 1 3 PUDHUSAMPALLI RAMAN NAGAR METTUR DAM 636 403 | METTUR DAM | SALEM | TAMIL NADU | 636403 | ₹1.3 Cr Quoted ₹1.5 Cr | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | PA and CO L1 |
|---|---|---|---|---|
| 1.00 | Earthwork excavation for cutting and levelling the site in Hard Rock requiring blasting and deposting on bank with an initial lead of 10 mtrs. and lift of 2 m | 231 | m3 | 1,000 ₹2,31,000 Lowest |
| 2.00 | Earthwork excavation for cutting and levelling the site in Soft disintegrated Rock requiring blasting and deposting on bank with an initial lead of 10 mtrs. and lift of 2 m | 231 | m3 | 250 ₹57,750 Lowest |
| 3.00 | Earthwork excavation for cutting and levelling the site in hard gravelly soil and deposting on bank with an initial lead of 10 mtrs. and lift of 2 m | 462 | m3 | 150 ₹69,300 Lowest |
| 4.00 | Earthwork excavation for foundation with an initial lead of 10 m and lift of 2 m etc complete.
In hard gravelly soil | 598 | m³ | 150 ₹89,700 Lowest |
| 5.00 | Earthwork excavation for foundation with an initial lead of 10 m and lift of 2 m etc complete
In medium rock and dense medium rock not requiring blasting. | 69 | m³ | 400 ₹27,600 Lowest |
| 6.00 | Earthwork excavation for foundation with an initial lead of 10 m and lift of 2 m etc complete
Hard Rock requiring blasting & stacking | 34 | m³ | 1,000 ₹34,000 Lowest |
| 7.00 | Earthwork excavation for foundation with an initial lead of 10 m and lift of 2 m etc complete
Removing hard rock by wedging and chiseling and trimming to proper shape where blasting is prohibited | 34 | m³ | 2,000 ₹68,000 Lowest |
| 8.00 | PCC 1:3:6 using 20mm HBG metal for foundation without formwork including cost of cement, all materials, labour, lead, lift etc. complete | 111 | m³ | 7,000 ₹7,77,000 Lowest |
| 9.00 | PCC 1:2:4 using 12 to 20 mm HBG machine crushed metal for Transformer plinth, Breaker plinth & other plinth concrete without form work plinth with formwork including cost of cement all materials,labour,lead lift, curing etc., complete. | 90 | m3 | 9,000 ₹8,10,000 Lowest |
| 10.00 | PCC 1:2:4 using 12 to 20 mm HBG machine crushed metal for Structure Plinth retaining wall, kerb wall concrete with formwork including cost of cement all materials,labour,lead lift, curing etc., complete. | 203 | m3 | 13,000 ₹26,39,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.0 L
Closing Date
25 Sept 2025, 2:30 pmClosed
CE/TP-I/CNI
O/o the Chief Engineer/Transmission Projects I / Chennai, 3rd Floor , 110 KV GIS Substation building A-10, Guindy Industrial Estate, Guindy, Chennai -32
Providing Transformer plinth,Various structure plinths ,cable duct ,RCC road ,Retaining wall ,yard filling ,HBG Metal filling and allied civil works for Proposed Poochur 110 KV substation
2025_EB_603440_1
TP1-82/2025-26 OF CE/TP-I/CNI
Open Tender
Civil Works
Works
120 days
POOCHUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.0 L
28 Apr 2026
12 Sept 2025
26 Sept 2025
12 Sept 2025
25 Sept 2025
12 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_721356.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].