| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.7 LAccepted-AOC | L1 | Accepted-AOC Found L1 quoted bidder. | |
| 2 | L2₹15.6 L+₹91,463.59 (6.23%)Rejected-Finance | L2 | Rejected-Finance Quoted rate is higher than the estimated cost. | |
| 3 | Rejected-Technical YAMUNA NAGAR ROAD NO 03 DORANDA RANCHI | RANCHI | RANCHI | JHARKHAND | - | Rejected-Technical Not submitted required documents as per BOQ. | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Not submitted the hard copy of uploaded bid alongwith original D.D of BOQ, EMD to the office of GM/TZ-III,JSR with in due date of submission. |
Tender Value
Refer Docs
EMD Value
₹29,400
Closing Date
16 Dec 2021, 3:00 pmClosed
General Manager TZ-III,JSR
Campus 132/33 kV Grid Colony Adityapur-I, Phase-VI, Post- Gamharia, Seraikella-Kharsawan, Pin Code -832108 (Jharkhand)
Rectification of OPGW cable(Communication link) between interconnected Grid Sub-Stations at 132/33kV GSS Jadugoda ,132/33 kV GSS Dhalbhumgarh and 220/132kV GSS Chandil-1 under transmission circle Jamshedpur for uninterrupted data communication.
2021_JSEB_53606_2
210/PR/JUSNL/2021-22
Open Tender
Electrical Works
Works
60 days
Jamshedpur zone
please refer tender documents
2 documents required · 2 mandatory
₹2,950
Accounts Officer, Transmission Zone-III, Jamshedpu
₹29,400
Yes
22 Jul 2022
24 Nov 2021
17 Dec 2021
24 Nov 2021
16 Dec 2021
24 Nov 2021
A.Rectification of OPGW cable betwwen 132/33 KV GSS Jadugoda to 220/132 KV GSS Ramchandrapur for operation of real time data fetched to SLDC without any interruption.
Survey of the each site/GSS
Testing of fiber
Testing of FMS
Testing of CLOSER
Dismantle of CLOSER
Installation of CLOSER
Supply of 24/ 48 port FMS
Installation of 24/48 port FMS
Splicing of fiber laid on offices at Ranchi & Jamshedpur
Splicing of fiber laid on 132KV/220KV line ( Plane area )
Splicing of fiber laid on 132KV/220KV line ( interior area )
Integration of the site
transportation charge
B.Rectification of OPGW cable betwwen 132 kV GSS Dhalbhumgarh to 132 kVJadugoda for operation of real time data fetched to SLDC without any interruption.
Survey of the each site/GSS
Testing of fiber
Testing of FMS
Testing of CLOSER
Dismantle of CLOSER
Installation of CLOSER
Supply of 24/ 48 port FMS
Installation of 24/48 port FMS
Supply of joint box/closer(24 fiber) indoor type
Supply of joint box/closer(24 fiber) outdoor type
Splicing of fiber laid on offices at Ranchi & Jamshedpur
Splicing of fiber laid on 132KV/220KV line ( Plane area )
Integration of the site
Consultancy Charges
transportation charge
C.Rectification of OPGW cable between 220/132 KV Chandil-1 GSS to 220/132KV Ramchandrapur GSS and 220/132KV Chandil-1 GSS to 132/33KV RKSN GSS for operation of real time data fetched to SLDC without any interruption.
Survey of the site (220/132 KV GSS Chandil - I, 132/33KV RKSN & 220/132KV GSS Ramchandrapur)
Dismantling of Communication Equipments from Ramchandrapur (SDH, PDH, FODF/FMS etc.)
Erection of Communication Equipments at Chandil(SDH, PDH, FODF/FMS etc.)
Tresting of fiber
Testing of FMS
Testing of CLOSER
Dismantling of CLOSER
Installation of CLOSER
Supply of 48 port FMS
Installation of 48 port FMS
Splicing of fiber
Intgration of the site
Consultancy Charges
Transportation charges
M/s Siddtharth Power
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .