Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹5.3 L+₹31,262.70 (6.28%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L2₹5.3 L+₹31,262.70 (6.28%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹6.2 L
EMD Value
₹6,300
Closing Date
25 Sept 2026, 2:00 pmClosed
ZONAL OFFICER-3
Greater Chennai Corporation Aminity Buildng, CMDA Truck Terminal Madhavaram,Chennai-600060
Improvements work for Anganwadi at Telugu Colony in Div-26, Unit-7, Zone-3
2026_CoC_704814_1
Z.O.III.C.NO.E1/5620/2026
Open Tender
Civil Works
Works
120 days
CHENNAI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹6,300
25 Sept 2026
15 Sept 2026
25 Sept 2026
15 Sept 2026
25 Sept 2026
15 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation by Mechanica...2.40m Footing Depth. (including Refilling charges) | 13 | CUM | 368.55 | ₹4,791.15 |
| 2 | Supplying and filling in foundation, basement, etc...tion and as directed by the departmental officers. | 3 | CUM | 391.95 | ₹1,175.85 |
| 3 | Plain Cement Concrete 1:2:4 (one cement, two crush...departmental officers.-Mixing by mechanical means | 3 | CUM | 7,255.21 | ₹21,765.63 |
| 4 | Supplying, fabricating and placing in position Rib...nt and binding wire) Upto plinth / Basement level | 134 | KGS | 96.53 | ₹12,935.02 |
| 5 | Supplying and erecting steel centering including n...shall be given after the concrete is laid). COLUMN | 29 | SQM | 669.67 | ₹19,420.43 |
| 6 | Supplying and erecting centering for plane surface...g shall be given after the concrete is laid).BEAM | 6 | SQM | 1,267.76 | ₹7,606.56 |
| 7 | Providing and laying in position, Standardised Con...the Department for the excess usage of materials). | 2 | CUM | 8,529.2 | ₹17,058.4 |
| 8 | Brick partition walls of 11.50cm thickness using b...rcement will be measured and paid for separately) | 6 | SQM | 1,072.61 | ₹6,435.66 |
| 9 | Plastering the surface of walls with Cement Mortar...d as directed by the departmental officers. (Wall) | 7 | SQM | 317.59 | ₹2,223.13 |
| 10 | Supplying And Fixing of Rubber Moulded Grey Premiu...o Full Depth Curing Thread Lining Etc Complete . | 44 | MTR | 893.29 | ₹39,304.76 |
stage.html
html • 0.02 MB
finance_847227.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.16 MB
BOQ_847227.xls
BOQ • 0.28 MB
5620.pdf
Tender Documents • 1.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .