Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹23.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L1₹23.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L1₹23.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L1₹23.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L1₹23.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹23.2 L
EMD Value
₹23,171
Closing Date
18 Jun 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
COMMISSIONER, SMC
SAMBALPUR MUNICIPAL CORPORATION, DURGAPALI, SAMBALPUR, 768006
Construction of road and drain from Sai garage to Abhay Pattnaik House via Akshaya Mahapatra house at Pragati Vihar, Ainthapali, ward no.-28, under SMC SAMBALPUR
2026_ORULB_131182_3
16/SMC_SBP/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
SAMBALPUR MUNICIPAL CORPORATION
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹23,171
Yes
23 Jun 2026
9 Jun 2026
19 Jun 2026
9 Jun 2026
18 Jun 2026
9 Jun 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Cement Concrete Grade M-15 & M- 20 including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres | 260.9 | cum | 840 | ₹2,19,156 |
| 2 | Removal of excavated dismantled materials away from work site by mechanical means within 5km lead including loading unloading etc complete. | - | cum | 320.6 | - |
| 3 | Earthwork in excavation of foundation in hard or gravelly soil with initial lead & lift including rough dressing & levelling the bed etc. complete. | 100.1 | cum | 225.7 | ₹22,592.57 |
| 4 | Supplying , filling Sand in F & P including cost, Conveyance & royalty of sand, cost of all labour, T & P, labour cess, watering, ramming etc. complete. | 21.2 | cum | 814.1 | ₹17,258.92 |
| 5 | Cement Concrete (1:4:8) using 4cm size B.H.G. (C. B.) Metal including cost, conveyance , royalty & taxes of all materials etc. complete | 76.7 | cum | 5,376.9 | ₹4,12,408.23 |
| 6 | P.C.C. work in (1:2:4) with 12mm size crusher brocken h.g. chips mixing with concrete mixture laying , compacting including cost of all material with taxes , watering, curing labour required for the work etc but excluding centring, shuttering . Complete as per direction of E-I-C.Cement concrete (1:2:4) using 12mm. size c.b.b.h.g chips including cost of all materials etc. complete. | 19.1 | cum | 7,382.2 | ₹1,41,000.02 |
| 7 | R.C.C work M-20 grade with 20mm & down grade crusher broken hard Granite chips | 87 | cum | 5,656.3 | ₹4,92,098.1 |
| 8 | Providing reinforcement for RCC work with cutting bending binding , placing in proper position as per design including cost of steel , binding wire and labour required for bending , binding . Complete as per direction of E-I-C. | 40.01 | Qntl. | 8,527.3 | ₹3,41,177.27 |
| 9 | Rigid smooth centring and shuttering for R.C.C. works including false work and dismantling then after casting including cost of materials complete in ground floor. Complete as per direction of E-I-C. | 767 | Sqm. | 248.1 | ₹1,90,292.7 |
| 10 | Providing, spreading Quarry Rubbish in Sub-Base in layers not exceeding 22.5cm. including watering ,compacting to the required density in O.M.C. with rolling by Vibratory Roller as per O.P.W.D. specifications including cost, conveyance & royalty of all materials,cost of all labour, T & P, labour cess, watering, turfedging, hire & running charges of Vibratory Roller etc. complete. | 55.5 | cum | 1,398.45 | ₹77,613.98 |
stage.html
html • 0.03 MB
finance_595557.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_595557.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .