Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.7 LAccepted-AOC KK PATH BORBHETA JORHAT ASSAM PIN 785004 | JORHAT | JORHAT | ASSAM | 785004 | L1 | Accepted-AOC Being lowest and reasonable amount | |
| 2 | L2₹15.5 L+₹55,554.30 (3.71%)Rejected-AOC | L2 | Rejected-AOC Rejected due to L2 | |
| 3 | L3₹15.8 L+₹86,797 (5.80%)Rejected-AOC | L3 | Rejected-AOC Rejected due to L3 |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
20 Mar 2025, 6:00 pmClosed
GARRISON ENGINEER
Garrison Engineer GE Jorhat
REPAIR MAINT OF DOZING SYSTEM AND SUPPLY OF VARIOUS TYPES OF CHEMICAL FOR WATER INSTALLATION SYSTEM OF THE AREA LICHUBARI AND MARIANI UNDER GE JORHAT
2024_MES_684526_3
8213/GE/E8
Open Tender
Civil Works
Item Rate
180 days
GE Jorhat
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GARRISON ENGINEER Jorhat
₹30,000
Yes
5 Apr 2025
19 Feb 2025
21 Mar 2025
19 Feb 2025
20 Mar 2025
26 Feb 2025
19 Feb 2025 - 23 Feb 2025
Amount
NOTES :The bidders/contractors are advised to read tender document & all corrigendum/ amendments and General conditions of contracts before entry/quoting the rates.
Supply only Hi-strength granular chlorination chemical based with CIAS (Corrosion Inhibitor & Anti-scalant) to be ratified by E-inC’s Branch, Dry, free flowing, consistent white granules (or powder) and without hard lumps or impurities should not induce substances beyond acceptable limit as give in IS:10500:2012 in treated and disinfectant water, chlorine having minimum 55%-60% chlorine content by mass packed in 45Kgs PVC sealed container, 5-10 % moisture content, upto 4% Calcium Hydroxide, upto 15 % Sodium Chloride suitable for treatment of drinking water and swimming pool (Much more stable than chlorine gas, bleaching power and sodium hypochlorite) all as specified and directed by Engr-in-Charge. (i) Note:- (i) IV & RV shall be maintained for every consignment of the material supplied,and the same shall be entered in MB as not to Abstract, before making payment. (ii) The contractor shall produce manufacturers "Certificate of Compliance" indicating date of manufacturer in original alongwith every consignment of supply. (iii) Test certificate from Govt approved Test Laboratory, having NABL accreditation, shall accompany with every consignment of supply to ensure that the materials supplied are in with conformity with relevant IS.
Supply only Poly Aluminium Chloride (PAC) inorganic soluble polymer raw water flocculants powder in 25 Kg bags conforming to the following specifications: -(a) Bulk Density/specific Gravity at 20 Degree Celcius: 0.75 + 0.10 (b) PH Value of aqueous solution (w/v): 3.5 – 5.0 (1%)(c) Chloride content (w/w): 31.0% + 2.0%(d) Sulphate content: 10 % (Max)(e) Basicity: 40.0 + 5.0(f) Mercury & Lead: Not desirable all as specified and directed by Engr-in-Charge.
Supply only following spares / components to be incorporated against chemical Dozing pumps of make RMCO/CHEMINJECT model RPQ 40 HD high pressure single head gear motor adjustable chemical dosing (metering) pump cap. 2 to 40 US GPD @ 100 PSI & capacity or any other make / capacity complete for the following items : Pump tube
Injection check valve
Suction Line Strainer 3/8'
Suction / Discharge Tube
Check Valve / Duck Bill
Connecting Nut 3/8"
Ferrule
Demolition of Concrete ( Unreinforced ) of any description and in any position not otherwise specifically provided for etc complete all as specified and as directed
Material & labour for Plain Cement Conerete 1 : 3 : 6 type C2 using 40 mm graded stone agregate as in foundation/platform of pump set/pump panel & other works at different pump house complete all as specified and as directed by the Engr-in-charge.
Collection of 08 nos water samples ( RAW and Treated ) from 04 water supply installations ( Pump House No. 7,8,9 & 10 ) incl water treatment plant under GE Jorhat in a special sterilized container and submitting to test laboratory for Bacteriological/Chemical analysis as per IS code and obtain test result from lab incl submitting to Engineer-in-Charge as directed. Total 09 Nos of pump houses and 09 Nos samples in a month for testing of both Raw and treated water . Nature of Tests :- (NOTE: Testing shall be carried out at NTC/NEIST Jorhat or any other Govt approved laboratory with prior approval of GE)
Collection of 04 nos water samples (Treated ) from 04 water supply installations ( Pump House No. 7, 8, 9 & 10) incl water treatment plant under GE Jorhat in a special sterilized container and submitting to test laboratory for Lead analysis as per IS code and obtain test result from lab incl submitting to Engineer-in-Charge as directed. Total 09 Nos of pump houses and 09 Nos samples in a month for testing of treated water . Nature of Tests :- (NOTE: Testing shall be carried out at NTC/NEIST Jorhat or any other Govt approved laboratory with prior approval of GE)
Supply only Spiral Cap type pet sterile bottle made from BPA free material for taking samples of water all as specified & directed. complete all as specified and as directed.
Supply and fix in repair PE /FRP dozing tank of capacity 100 litres, 480 mm dia and 575 mm height with lid containing port hole for pouring chlorination chemical and water including provision for mounting arrangement for motor & dosing pump, solution level indication Gauge suitable for chemical dosing plant complete complete all as specified and directed.
Taking down of defective motor of capacity 1 HP, 415 Volt, 1440 RPM with gear assembly from chemical dozing system after disconnecting electric connection and servicing the motor & gear assembly for proper functioning including replacement of burnt copper winding, oiling and greasing etc, and refixing back in same position complete all as specified and as directed. Note: Spares such as NRV, Bearing, Rubber coupling will be deemed to be included in rate quoted against above item.
Supply & Fixing Safe water pre-filter capsule suitable for accommodating one unit of Prefil sealed refill for corrosion & scale inhibition as well as sediment filtration sealed of 51.0 cm. for drinking water applications, ( before PVC Tank Inlet ) with spcifications such as pressure: 7 Bar, Temperature: 35°C Max, End connections: 1½ inch, Installing location: Vertical Spindle all as specified and directed by Engr-in-Charge
Supply and Fixing Safe water pre-filter capsule suitable for accommodating one unit of Prefil corrosion & scale inhibitor sealed refill of 12.7 cm. for drinking water applications of following specifications: Flow Rate: 1,000 LPH Pressure: 1.5 Mpa Temperature: 35°C Max. End connections: ½ inch ( before Geyser / Kitchen Tap ) Installing location: Vertical Spindle Environment: Cool dry place away from direct sunlight Backwash option: manual key all as specified and directed by Engr-in-Charge.
Supply and Fixing MS rolled sectioon as in Joist, channel, angle, or tee sections, fixed independently, without connecting plates, etc. (cut to ordinary lengths i.e. within 20mm of the length indicated) conforming to Fe-290 (Gde E?165) etc including dismantling old unserviceable one complete all as specified and as directed.
Supply & fixing in repairs NRV assembly 20mm, PVC for inlet and outlet pipes complete all as specified and directed.
S & F in repair for 50 mm outer diameter of 3- layer PP-R Polypropylene random copolymer) pipes, SDR 7.4 (PN16) UV stabilized and antimicrobial fusion welded having thermal stability for hot & cold water supply all PP-R plain & brass threaded polypropylene random fittings laid in trenches complete all as specified and as directed.
S & F in repair for 32 mm outer diameter of 3- layer PP-R Polypropylene random copolymer) pipes, SDR 7.4 (PN16) UV stabilized and antimicrobial fusion welded having thermal stability for hot & cold water supply all PP-R plain & brass threaded polypropylene random fittings laid in trenches complete all as specified and as directed.
S & F in repair for 25 mm outer diameter of 3- layer PP-R Polypropylene random copolymer) pipes, SDR 7.4 (PN16) UV stabilized and antimicrobial fusion welded having thermal stability for hot & cold water supply all PP-R plain & brass threaded polypropylene random fittings laid in trenches complete all as specified and as directed.
S & F in repair for 32 mm gate valve for 3- layer PP-R Polypropylene random copolymer) pipes, SDR 7.4 (PN16) UV stabilized and antimicrobial fusion welded having thermal stability for hot & cold water supply all PP-R plain & brass threaded polypropylene random fittings complete all as specified and as directed.
S&F in repairs GI steel water tubings , medium grade galvanised with all fittings 15 mm bore , fixed to wall/pole with suitable size of MS flat clamps all as specified and directed .
Excavation in trench in soft/loose soil not exc. 1.5 mtr width and n. exc 1.5 mtr in depth and getting out for taking up or laying water pipe line for soft / loose soil.
Returning, filling in, including spreading, levelling, watering and well ramming in layers n.exc 25cm thick as in soft/loose soil.
Removing excavating material n.exc 50m and depositing where directed at a level not exceeding 1.5m above the starting point.
S & F in repair for 50 x 40 mm brass threaded socket for 3- layer PP-R Polypropylene random copolymer) pipes, SDR 7.4 (PN16) UV stabilized and antimicrobial fusion welded having thermal stability for hot & cold water supply all PP-R plain & brass threaded polypropylene random fittings complete all as specified and as directed.
S & F in repair for 32 x 25 mm brass threaded socket for 3- layer PP-R Polypropylene random copolymer) pipes, SDR 7.4 (PN16) UV stabilized and antimicrobial fusion welded having thermal stability for hot & cold water supply all PP-R plain & brass threaded polypropylene random fittings complete all as specified and as directed. Note: “If any above water supply and connected items become breakdown, the contractor shall take the problem/ fault at site within 12 hours on intimation by JE/ AGE and ensure that fault rectified within 24 to 48 hrs, failing which an amount of Rs 100/- per hours will be recovered as penal recovery from any payment due to the contractor after expiry of 48 hours. And also daily routine complaints to be done by the contractor. One FGM & One helper should be provided from 0900 AM to 0500 PM in complaint cell of water supply complaints”).
Note: Schedule of credit (SCHEDULE OF CREDIT) amount of Rs ₹ ___________ mentioned on Page No ____ shall be deducted from the total quoted amount of BOQ.
4S ASSOCIATES (BID ID -3267370)
NIHAR ENTERPRISE (BID ID -3267421)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .