Tender Value
₹91.4 L
EMD Value
₹1.6 L
Closing Date
18 Jun 2026, 6:00 pm
CWE JAIPUR
Military Engineer Services, HQ Commander Works Engineer, KalyanMarg, Banipark, Jaipur-06
SPL REP TO SV HALL OF APS UNDER AGE B/R-I AND PROVISION OF 15 NOS TOWER AC FOR BLDG NO-581 UNDER ZONE-1 AREA AT JAIPUR MIL STN
2026_MES_757804_3
82538/JPR/E8
Open Tender
Civil Works
180 days
GE JAIPUR
AS PER NIT
6 documents required · 6 mandatory
₹1,000
GE JAIPUR
₹1.6 L
Yes
HQ CWE JAIPUR
4 Jun 2026
4 Jun 2026
20 Jun 2026
4 Jun 2026
18 Jun 2026
12 Jun 2026
10 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of Wall and ceiling boards (fibre, pulp, insulation, etc.) or insulation boards/slabs/ blankets, any thickness, including cover fillets complete all as specified and directed. | 1,110 | Sqm | - | - |
| 2 | Providing and Fixing Channelled perforated panels of width 192mm, thickness of 15mm and length 2400 mm, made of a Moisture resistant fibre board substrate with a laminated facing as per the approved shade (Portland Maple, Sea Beach, Siam Wood & Mystique Walnut, Interior White, Alumina Pearl) and a melamine balancing layer on the reverse side. The boards shall have a special perforation pattern where the reverse surface has a “Helmholtz” fluted perforation with consecutive 3mm wide groove followed by 13mm of visible pane. The edges of the panel shall be “tongue-and-grooved” to fix special clips for installation and seamless visual. The back of the perforated panel shall have sound absorbing non-woven Soundtex acoustical fleece hot pressed to achieve NRC of 0.6. (Average value of Absorption Co-efficient readings taken at 250 Hz, 500 Hz, 1000 Hz and 2000 Hz) as per ASTM C423 and Humidity Resistance (RH) of 70% with camber limit less than 1mm/1000mm and bow less than 1mm/300mm.The panels shall be mounted on special aluminium splines (keel) using inside clips provided by Manufacturer and approved by the Architect/ Engineer-in-Charge. The panel shall be mounted by tongue and groove mechanism using inside clip on aluminium extruded keel made of Grade 6063-T5 having dimensions 3000(L) x 24(H) x 15.5(W).The keel shall also be used for transition of the butt end of adjacent panel at every 7.2m. INSTALLATION:An appropriate vapour barrier (by others) shall be applied/installed on the vertical surface before the installation to properly seal against entry of any moisture. Vapour barrier (by others) shall be installed as per Manufacturer’s recommendation. Install wooden batten grid (provided by others) of section 50x50mm or as approved by the Architect on the solid wall/partition to provide level and plumb surface for fixing Keel. Install Keel vertically using screws and plugs at spacing of not more than 600mm centre-to-centre. The first and last keel should not be more than 150mm from the ends. Trim the tongue of the first bottom panel and install using headless nail with groove side upward. Subsequent panels are installed with tongue side downward by engaging with each other using tongue and groove mechanism and secured by inside clip. Continue this process until required height is achieved. Shorter butt edges need to be joined using industrial/wood glue. The keel shall also be used for transition of the butt end of adjacent panel at every 7.2m. Install the Skirting (provided by others) of width 50mm or more as required by the Architect/ Engineer-in-Charge. Finish off the edges using wooden moulding of matching colour (by others). Installation should be carried out as per Manufacturer recommended procedure complete all as specified and directed.
MAKE - KNAUF CEILINGS SOLUTIONS, TOPAKAUSTIC, SAINT GOBAIN OR EQUIVALENT IN APPROVED MAKE LIST | 585 | Sqm | - | - |
| 3 | M & L for post construction anti-termite treatment along the external wall below concrete or masonry apron using chemical emulsion @ 2.25 litres per linear metre including drilling and plugging holes etc. in apron complete all as specified and directed. | 110 | RM | - | - |
| 4 | M & L for post construction anti-termite treatment at points of contact of wood work by chemical emulsion (in oil or kerosene based solution) @ 0.5 litre/hole by drilling 6mm dia holes at a downward angle of 45 degree at 150mm centre to centre and sealing the same complete all as specified and directed. | 80 | RM | - | - |
| 5 | M & L for post construction anti-termite treatment of soil under existing floors using emulsion @ one litre per hole, 300mm apart including drilling and plugging 12mm dia holes with cement mortar 1:2 (1 cement: 2 coarse sand) to match the existing floors complete all as specified and directed. | 100 | Sqm | - | - |
| 6 | Taking down cement plaster on brick or stone walls incl raking out joints hacking for key scrubbing down with water complete all as specified and directed. | 150 | Sqm | - | - |
| 7 | M&L for rendering 15mm thick cement plaster on fair faces of brick or concrete surfaces in cement mortar 1:6, finished even and smooth w/o using extra cement complete all as specified and directed. | 150 | Sqm | - | - |
| 8 | Providing & Fixing of Fibre Glass Acoustical Suspended Ceiling System with 15mm thick Microlook 90 Edge Tiles with 15mm Bolt Slot exposed grid. The tiles shall have smooth laminated visual with Humidity Resistance (RH) of 95%, NRC 0.85 – 0.95 (Average value of Absorption Co-efficient readings taken at 250 Hz, 500 Hz, 1000 Hz and 2000 Hz) as per ASTM C423 standard, Light Reflectance ≥88% as per ASTM E-1477, Colour Pebble White, Fire Performance of Class 0/1 as per BS 476 Part 6/7 with 20/25mm Square Tegular/Microlook 90 ̊ edge and 8mm drop in module size of 600 x 600mm. It shall be suitable for Green Building application, with Recycled content of 85%.SUSPENSION: The tile shall be laid on grid system with 15mm white flanges incorporating a 6mm central reveal in white/black colour with mitred ends & “bird’s mouth” notches to provide mitred cruciform junctions colour global white. Grid shall have double stroke rotary stitching on all T sections i.e. the Main Runner, 1200 mm & 600 mm Cross Tees with a web height of 38mm (all sections). The deflection loading of the system shall be 7.9 kg/m2 (as per standard installation layout mentioned below) and main beam tested as per ASTM C635 (Deflection limit less than L/360) with a deflection loading of 9.5 kg/m. The end details of the cross tee shall be made of pre hardened steel clip fixed to the ends of the cross tee to provide double locking between “cross tee to cross tee” and “cross tee to main beam”. All main beam to main beam and cross tee to cross tee connection shall have a pull out strength of more than 100kg. The T Sections shall be made of 90 gsm as per IS 277 (2003) pre-painted steel with baked polyester paint of 0T bending capability. INSTALLATION: To comprise main runner spaced at 1200mm securely fixed to the structural soffit using suspension system (specifications below) at 1200mm maximum. The First/Last suspension system at the end of each main runner shall not be greater than 450mm from the adjacent wall along with the first and the last main beam shall be at less than 600mm from the wall. Flush fitting 1200mm long cross tees to be interlocked between main runners at 600mm to form 1200 x 600 mm module. Cut cross tees longer than 600mm require independent support. 600 x 600mm module to be formed by fitting 600mm long flush fitting cross tees centrally between the 1200 mm cross tees. Perimeter trim to be wall angles of size 3000x19x19mm, secured to walls using screws at 450mm centre to centre maximum. Installation shall be carried out as per Manufacturer recommended procedure. SUSPENSION SYSTEM accessories supplied by Manufacturer consisting of M6 Anchor Fasteners with hanger hole, pre-straightened hanger wire of dia– 2.5 mm of 1.80 m length having a tensile strength of 344-413 MPa and a minimum loading strength of 110 kgs. (Optionally, adjustable hook clips made of 0.7mm thick Grade 1 C55 galvanized spring steel of dimension 100 x 20mm and 4 mm aquiline wire to be used for level adjustment during installation purpose in main runners complete all as specified and directed.
MAKE- KNAUF CEILINGS SOLUTIONS, USG, TOPAKUSTIKS OR EQUIVALENT IN APPROVED MAKE | 525 | Sqm | - | - |
| 9 | Taking down chowkats or frames exceeding 1.5 Sqm but not exceeding 4 Sqm each with shutter (without taking off shutter from the frame) and removing from site complete all as specified and directed. | 4 | Each | - | - |
| 10 | S&F powder coated aluminium frame for doors, windows, ventilators, partitions etc with one or more rebates including joining cleat for fixing etc. complete all as specified (minimum thickness of powder coating not less than 50 micron) complete all as specified and directed. | 50 | Kg | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
RetenderDocuments.pdf
Tender Documents • 0.92 MB
BOQ_861968.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid