| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹31.9 L+₹1.2 L (3.75%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹33.1 L+₹2.3 L (7.51%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹36.7 L+₹5.9 L (19.2%)Rejected-AOC | L4 | Rejected-AOC L4 |
Tender Value
₹41.1 L
EMD Value
₹82,200
Closing Date
24 Mar 2021, 6:30 pmClosed
S.E. I.W.C. Prayagraj
Office of the S.E. I.W.C. 9 Saproo Road, Civil Lines, Prayagraj
Reconstruction of 05 No. Head Regulator of Puramunai Minor, Darshni Minor, Bhagatpur Minor, Bogaha Minor Bhagesar Minor Offtaking From Belan Main Canal.
2021_UPIDC_573419_4
09/SE/2020-21
Open Tender
Civil Works
Item Wise
90 days
Prayagraj
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹82,200
15 Feb 2023
19 Mar 2021
24 Mar 2021
19 Mar 2021
24 Mar 2021
19 Mar 2021
Amount
Dismantling of old C.R.S masonary including stakingof boulder ,all labour T&Pas per direc.of Er-in-charge
Dismantling of old R.C.C slab including all cost proper disposal , labour and T&P,etc as per direction.of Er-in-charge
Dismatling of C.C. of old and damaged base concrete including all cost proper disposal labour and T&P etc as per direction of Er-in-charge
E/W in excavation in foundation including back filling of excavated earth with 30m lead & 1.5 m lift etc.
Supply and laying local sand below in foundation C.C. including cost of all materials labour T&P etc
Laying.C.C. 1:3:6 in foundation & floor including cost of all materials labours T&P etc.
C.R.S. Masonary with 1:3 C.M.including cost of all material labour and T&P etc.
Centering & shuttering for C.C & R.C.C. slab including cost of all materials labour T&P etc.
Supply & laying 3mm thick Tar paper on bed Block including cost of all types of labour, material, T& P etc. For proper copmletion of work As per direction of engineer-in charge.
Supply & laying 20mm thick joint filler board in expansion joints of slab etc. including cost of all types of labour, material, T& P etc. For proper copletion of work As per direction of engineer-in charge.
Reinforcement for R.C.C.work including cutting ,bending,binding and placing including cost of all materials ,labour T&P etc.
Laying R.C.C. 1:1.5:3 in slab bridge including cost of all materials labour and T&P etc.but excluding cost of reinforcement.
Deep struck cement pointing on stone masonary with 1:2C.M. including cost of all material labours and T&P etc.
Laying C.C 1:1.5:3 for wearing coat and coaping of parapet including cost of all materials, labour and T&P etc.
Dry Stone pitching the approach including cost of all materials,labour and T & P etc.
E/W In Embankment for restoration of canal section on VRB Nearby in all type of soil mixed including all lead ,lift dressing , etc.
MOHD. SHOEB KHAN
SHARDA CONSTRUCTION
RAGHU NANDAN SINGH
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .