| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77,323.90Accepted-AOC | ₹77,323.90 | L1 | Accepted-AOC LOW PRICE ACCEPTED |
| 2 | L2₹78,082.25Rejected-Finance CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹78,082.25 | L2 | Rejected-Finance HIGH PRICE REJECTED |
| Sl No | Description | Qty | Unit | GUNASEKARAN AND CO L2 | S.Saravanabhavan L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation, etc., in all soil sand sub- soils and to full depth as may be directed except in hard rock requiring blasting inclusive of shoring, shuttering, bailing out water wherever necessary refilling the foundation with excavated earth other than sandy soil in layers of not more than 15 cm thick well rammed and depositing the surplus earth with in the compound in place shown by the departmental officers within an initial lead and lift and clearing and levelling the site etc.,complete | 6.3 | M3 | 265 ₹1,669.50 | 263 ₹1,656.90 |
| 2.00 | Supplying and filling in foundation and basement with good Stone Dust in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specfication. | 0.45 | M3 | 850 ₹382.50 | 845 ₹380.25 |
| 3.00 | Cement Conceret 1:4:8 (One Cement four M-sand and eight aggregate) using 40mm hard broken granite stone jelly for foundation including dewatering and wherever necessary laying in layers of 15cm thick and consolidated and curing complying with standard specification and as directed by the departmental officers etc., complete | 0.45 | M3 | 6,700 ₹3,015 | 6,695 ₹3,012.75 |
| 4.00 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.-Mixing by mechanical means (S.No:135-SD Book Vol-I ) | 6.54 | M3 | 8,050 ₹52,687.25 | 8,000 ₹52,360 |
| 5.00 | Supplying and erecting centering to sides and soffits including supports and strutting with necessary cross bracing for plain surface such as RCC slabs rectangular beams all beams lintels etc., centering for soffits upto 3 meter height using mild steel sheet of size 90 cm x 60 cm x 10 mm gauge with MS angles of size 25mm x 25mm x 3mm laid over silver oak (CW) joists of size 10cm x 6cm spaced upto 90cm c/c and casurina props or 10 cm to 13 cm dia spaced at 0.750 cm c/c complying with standard specifications as per TNDSS NO : 30 & 86. | 21 | M2 | 720 ₹15,120 | 710 ₹14,910 |
| 6.00 | Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two M.sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) | 12 | M2 | 210 ₹2,520 | 200 ₹2,400 |
| 7.00 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 16.8 | M3 | 160 ₹2,688 | 155 ₹2,604 |
Tender Value
₹95,000
Closing Date
27 Feb 2026, 3:00 pmClosed
EXECUTIVE OFFICER, NANNILAM TOWN PANCHAYAT
1, Kuchipalaya Steet, Nannilam
General Fund 2025-26 Construction Of Pump Platform With Protection Wall At Ward No.15, Vettiyara Street In Nannilam Town Panchayat.
2026_DTP_667578_1
43/2025/A1-14
Open Tender
Civil Works - Water Works
180 days
NANNILAM TOWN PANCHAYAT OFFICE
Please refer Tender documents.
1 document required · 1 mandatory
₹0
31 Mar 2026
27 Feb 2026
27 Feb 2026
27 Feb 2026
27 Feb 2026
27 Feb 2026
27 Feb 2026 - 27 Feb 2026
Earth work excavation for foundation, etc., in all soil sand sub- soils and to full depth as may be directed except in hard rock requiring blasting inclusive of shoring, shuttering, bailing out water wherever necessary refilling the foundation with excavated earth other than sandy soil in layers of not more than 15 cm thick well rammed and depositing the surplus earth with in the compound in place shown by the departmental officers within an initial lead and lift and clearing and levelling the site etc.,complete
Supplying and filling in foundation and basement with good Stone Dust in layers of not more than 15cm.thick well rammed watered and compacted etc., complete complying with standard specfication.
Cement Conceret 1:4:8 (One Cement four M-sand and eight aggregate) using 40mm hard broken granite stone jelly for foundation including dewatering and wherever necessary laying in layers of 15cm thick and consolidated and curing complying with standard specification and as directed by the departmental officers etc., complete
Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.-Mixing by mechanical means (S.No:135-SD Book Vol-I )
Supplying and erecting centering to sides and soffits including supports and strutting with necessary cross bracing for plain surface such as RCC slabs rectangular beams all beams lintels etc., centering for soffits upto 3 meter height using mild steel sheet of size 90 cm x 60 cm x 10 mm gauge with MS angles of size 25mm x 25mm x 3mm laid over silver oak (CW) joists of size 10cm x 6cm spaced upto 90cm c/c and casurina props or 10 cm to 13 cm dia spaced at 0.750 cm c/c complying with standard specifications as per TNDSS NO : 30 & 86.
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two M.sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
BOQ_801985.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid