Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹75.2 LAdmitted-Finance NO 2 MANIKANDAPURAM THIRUMULLAIVOYAL CHENNAI 600062 | THIRUVALLUR | TAMIL NADU | 600062 | L1 | Admitted-Finance | |
| 2 | Not Admitted-Fee/PreQual/Technical 2026 3RD STREET BALAJI NAGAR AMBATTUR CHENNAI 53 | CHENNAI | CHENNAI | TAMIL NADU | 600053 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | TAMILNADU CHEMICALS INDUSTRIES L1 |
|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand,silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering, ,and baling out water and cleaning and levelling the site etc.,complete | 832 | M3 | 218 ₹1,81,376 Lowest |
| 2.00 | Plain Cement Concrete 1:4:8 (one cement four sand and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 104 | M3 | 5,751.4 ₹5,98,145.6 Lowest |
| 3.00 | Supplying and erecting steel sheet centering shuttering upto 3.30 m. height including necessary support for plain surfaces for all RCC works in grade beam, beam, slab, waist slab, column, sunshade etc. using MS sheet of size 90cm x 60cm 10 gauge and stiffened with welded mild steel angle of size 25mm x 25mm x 3mm for boarding laid silver oak joist of size 10 cm x 6.5 cm spaced at about 90cm center to center and supported by casurina propes 10 cm to 13 cm dia spaced 75cm center to center complete. Beam and slab etc. complying with standard specification | 1,986 | M2 | 741.5 ₹14,72,619 Lowest |
| 4.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 19,045 | Kgs | 95.3 ₹18,14,988.5 Lowest |
| 5.00 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - The Coarse and Fine aggregates to be used should comply with the requiremnents of IS staandards. (No separate payment will be made by the Department for the excess usage of materials) | 293 | M3 | 8,935.9 ₹26,18,218.7 Lowest |
| 6.00 | Removal of Excavated Excess Earth away from the site to 2K.M including loading and transportation charges etc, complete as per standard specification. | 499 | M3 | 67.9 ₹33,882.1 Lowest |
| 7.00 | Supply and Fixing of 110mm Dia PVC Pipe of 10KSC, to fixed on the side walls including cost and conveyance of all materials to site etc,complete as per standard specification | 120 | RM | 304.8 ₹36,576 Lowest |
| 8.00 | Supply and fixing of 600mm X 600mm Fibre Reinforced Concrete Frame ( SFRC ) and Cover as per Type HD - 20, IS 12592, Part 1 & 2, including the cost and conveyance of all materials to site and labour charges for fixing, laying and curing charges etc complete as per standard specification | 155 | Nos | 2,594.8 ₹4,02,194 Lowest |
| 9.00 | Construction of cast -in- situ Silt Catch Pit of inner
size 450 X 450 X 450 mm including necessary earth
work excavation including providing foundation in
PCC 1:4:8 under wall 150mm thick and cutting the
existing storm water drain of size 300 x 150mm for
fixing 2 Nos of 160mm dia PVC pipe on the storm
water drain mouth with RCC cast in situ wall of size
120mm in RCC 1:1.5:3 with steel of 9.25 kg
including fixing Ductile Iron grating hinged with
frame clear opening 450 x 450mm -25 MT -
completing the finishing work etc (SWD 29 R) | 21 | Nos | 17,265.6 ₹3,62,577.6 Lowest |
Tender Value
₹89.9 L
EMD Value
₹89,900
Closing Date
17 Dec 2025, 3:00 pmClosed
THE COMMISSIONER
AVADI CITY MUNICIPAL CORPORATION AVADI
Construction of Storm Water Drain at Manikandapuram in ward 28
2025_MAWS_629703_1
Roc No.6185/2025/E1_4
Open Tender
Civil Works
Fixed-rate
180 days
ward 28
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹89,900
AVADI CITY MUNICIPAL CORPORATION
31 Dec 2025
8 Dec 2025
17 Dec 2025
8 Dec 2025
17 Dec 2025
8 Dec 2025
8 Dec 2025
Amount
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand,silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering, ,and baling out water and cleaning and levelling the site etc.,complete
Plain Cement Concrete 1:4:8 (one cement four sand and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Supplying and erecting steel sheet centering shuttering upto 3.30 m. height including necessary support for plain surfaces for all RCC works in grade beam, beam, slab, waist slab, column, sunshade etc. using MS sheet of size 90cm x 60cm 10 gauge and stiffened with welded mild steel angle of size 25mm x 25mm x 3mm for boarding laid silver oak joist of size 10 cm x 6.5 cm spaced at about 90cm center to center and supported by casurina propes 10 cm to 13 cm dia spaced 75cm center to center complete. Beam and slab etc. complying with standard specification
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors.
Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - The Coarse and Fine aggregates to be used should comply with the requiremnents of IS staandards. (No separate payment will be made by the Department for the excess usage of materials)
Removal of Excavated Excess Earth away from the site to 2K.M including loading and transportation charges etc, complete as per standard specification.
Supply and Fixing of 110mm Dia PVC Pipe of 10KSC, to fixed on the side walls including cost and conveyance of all materials to site etc,complete as per standard specification
Supply and fixing of 600mm X 600mm Fibre Reinforced Concrete Frame ( SFRC ) and Cover as per Type HD - 20, IS 12592, Part 1 & 2, including the cost and conveyance of all materials to site and labour charges for fixing, laying and curing charges etc complete as per standard specification
Construction of cast -in- situ Silt Catch Pit of inner size 450 X 450 X 450 mm including necessary earth work excavation including providing foundation in PCC 1:4:8 under wall 150mm thick and cutting the existing storm water drain of size 300 x 150mm for fixing 2 Nos of 160mm dia PVC pipe on the storm water drain mouth with RCC cast in situ wall of size 120mm in RCC 1:1.5:3 with steel of 9.25 kg including fixing Ductile Iron grating hinged with frame clear opening 450 x 450mm -25 MT - completing the finishing work etc (SWD 29 R)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.65 MB
BOQ_753004.xls
BOQ • 0.24 MB
TENDERDOCUMENT4.pdf
Tender Documents • 0.94 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .