Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹33.8 LAccepted-AOC | 1 | Accepted-AOC accept | |
| 2 | 2₹40.0 L+₹6.0 L (17.8%)Rejected-AOC | 2 | Rejected-AOC reject | |
| 3 | 3₹56.2 L+₹22.3 L (65.7%)Rejected-AOC 1ST FLOOR SIDHARTH TOWER BALTI KHARKHANA BYELNE S J ROAD ATHGAON GUWAHATI KAMRUP ASSAM 781001 | KAMRUP METRO | ASSAM | 781001 | 3 | Rejected-AOC reject |
Tender Value
₹34 L
EMD Value
₹34,000
Closing Date
6 Nov 2023, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EWC
Bareilly
replacement of 33 KV U/G cable and system strengthening work at various S/S
2023_MVVNL_857753_1
19/EWC(B)/2023-24
Open Tender
Electrical Works
Item Rate
90 days
Shahjahanpur
As per tender document
3 documents required · 3 mandatory
₹3,540
SE EWC
₹34,000
19 Jan 2024
31 Oct 2023
6 Nov 2023
31 Oct 2023
6 Nov 2023
31 Oct 2023
Amount
PART (A) WORK SPECIFICATION FOR SYSTEM STRENGTHENING WORK AT 33/11 V SUB-STAION TILHAR TOWN, IN EDD TILHAR, SHAHJAHANPUR
Loading, unloading and safe carriage of the following materials from any Electy. Store Center of Electricity store division of Bareilly zone.
33 KV Lightening Arrestor
33 KV Line Isolator
33 KV 400 A Bus Isolator
33 KV VCB 800A 750 MVA
33 kv O/D CT CTR 200/100/1
33 KV FUSE SET
33 KV CONTROL PANNAL FOR DOUBLE TF
Earthing of indoor & outdoor equipments of Sub-Station after proper welding of joints and painting of earth strip above soil with proper clamp etc. as per RESPO approved drawing & resistance of earthing should be not more than 2Ω as per details given below.
Making of triangular bridge by using MS electrode, GI strip 50x6mm and GI Pipe 40 mm dia with providing of well type pipe earthing upto 15 Mtr. depth below ground level including welding etc. by boaring process at T/F neutral, LA and newly erected structure including cost of GI pipe of size 40 mm dia 15 mtr. long of ISI mark.(all the required material will be supllied by the contractor).
Supply of GI strip of size 50x6mm for earthing of all newly erected structures and equipments in switchyard including cutting, fixing & proper welding with equipments. All LA will be seprately earth also as per RESPO norms. (All the required materials will be provided by firm.)
Installation of followig equipments on their respective structures including mechanical & electrical fixing after proper adjustment on their structure.
33 KV Bus Isolator
33 KV Line Isolator
33 kv O/D CT CTR 200/100/1
Lightening Arrestor
33 KV VCB 800A 750 MVA
33 KV FUSE SET
Dismentaling of existing following damage equipments on their structure.
33 KV Bus Isolator
33 KV Line Isolator
33 kv O/D CT CTR 200/100/1
33 KV VCB 800A 750 MVA
33 KV FUSE SET
33 KV Lightening Arrestor
33 KV CONTROL PANNAL FOR DOUBLE TF
Complete laying and termination of copper control cables from 10 MVA/5 MVA power T/F, 33 KV VCB, 33 KV CT in the out door switch yard to the existing transformer relay control panel inside the control room including cost of all materials and labour required for proper completion of works as per RESSPO drawings, including cost of testing of transformer, VCB, CT, relay pannel & proper relay settings as per requirement etc.
Control Cable 4x2.5 mm2
Control Cable 2x2.5 mm2
Erection & testing of double T/F Control penel in substation control room including grouting of anchor bolts of panel and making of pocket for control cable to insert in panel from trench and complete filling of control room's tranches by river sand.
Repairing of existing 33KV VCB in switchyard including repalcement of all required accessories as relay, motor, intrruptor etc. All type of material should be provided by the firm.
Carriage of old scrap/dismentaling material from site to store center Shahjahanpur
Repairnig of swichyard fencing complete in all respect, including cost of welding painting etc.
PART (B) WORK SPECIFICATION FOR SYSTEM STRENGTHENING WORK AT 33/11 V SUB-STATION KHUDAGANJ TOWN,IN EDD TILHAR, SHAHJAHANPUR
Loading, unloading and safe carriage of the following materials from any Electy. Store Center of Electricity store division of Bareilly zone.
33 KV Lightening Arrestor
33 KV 400 A Bus Isolator
33 kv O/D CT CTR 200/100/1
Installation of followig equipments on their respective structures including mechanical & electrical fixing after proper adjustment on their structure.
33 KV Bus Isolator
Lightening Arrestor
Dismentaling of existing following damage equipments on their structure.
33 KV Bus Isolator
33 KV Lightening Arrestor
Carriage of old scrap/dismentaling material from site to store center Shahjahanpur
PART(C) WORK SPECIFICATION FOR SYSTEM STRENGTHENING WORK AT 33/11 V SUB-STAION RAMPUR KALAN,IN EDD POWAYAN, SHAHJAHANPUR
Loading, unloading and safe carriage of the following materials from any Electy. Store Center of Electricity store division of Bareilly zone.
33 KV Lightening Arrestor
33 KV Line Isolator
33 KV VCB 800A 750 MVA
33 kv O/D CT CTR 200/100/1
33 KV FUSE SET
Earthing of indoor & outdoor equipments of Sub-Station after proper welding of joints and painting of earth strip above soil with proper clamp etc. as per RESPO approved drawing & resistance of earthing should be not more than 2Ω as per details given below.
Making of triangular bridge by using MS electrode, GI strip 50x6mm and GI Pipe 40 mm dia with providing of well type pipe earthing upto 15 Mtr. depth below ground level including welding etc. by boaring process at T/F neutral, LA and newly erected structure including cost of GI pipe of size 40 mm dia 15 mtr. long of ISI mark.(all the required material will be supllied by the contractor).
Supply of GI strip of size 50x6mm for earthing of all newly erected structures and equipments in switchyard including cutting, fixing & proper welding with equipments. All LA will be seprately earth also as per RESPO norms. (All the required materials will be provided by firm.)
Installation of followig equipments on their respective structures including mechanical & electrical fixing after proper adjustment on their structure.
33 KV Line Isolator
33 kv O/D CT CTR 200/100/1
Lightening Arrestor
33 KV VCB 800A 750 MVA
33 KV FUSE SET
Dismentaling of existing following damage equipments on their structure.
33 KV Line Isolator
33 kv O/D CT CTR 200/100/1
33 KV VCB 800A 750 MVA
33 KV FUSE SET
33 KV Lightening Arrestor
Complete laying and termination of copper control cables from 10 MVA/5 MVA power T/F, 33 KV VCB, 33 KV CT in the out door switch yard to the existing transformer relay control panel inside the control room including cost of all materials and labour required for proper completion of works as per RESSPO drawings, including cost of testing of transformer, VCB, CT, relay pannel & proper relay settings as per requirement etc.
Control Cable 4x2.5 mm2
Control Cable 2x2.5 mm2
Carriage of old scrap/dismentaling material from site to store center Shahjahanpur
Repairnig of swichyard fencing complete in all respect, including cost of welding painting etc.
PART(D) WORK SPECIFICATION FOR SYSTEM STRENGTHENING WORK AT 33/11 V SUB-STAION KHUTAR,IN EDD POWAYAN, SHAHJAHANPUR
Loading, unloading and safe carriage of the following materials from any Electy. Store Center of Electricity store division of Bareilly zone.
33 KV Lightening Arrestor
33 KV 400 A Bus Isolator
33 KV VCB 800A 750 MVA
33 kv O/D CT CTR 200/100/1
33 KV FUSE SET
33 KV CONTROL PANNAL FOR DOUBLE TF
Earthing of indoor & outdoor equipments of Sub-Station after proper welding of joints and painting of earth strip above soil with proper clamp etc. as per RESPO approved drawing & resistance of earthing should be not more than 2Ω as per details given below.
Making of triangular bridge by using MS electrode, GI strip 50x6mm and GI Pipe 40 mm dia with providing of well type pipe earthing upto 15 Mtr. depth below ground level including welding etc. by boaring process at T/F neutral, LA and newly erected structure including cost of GI pipe of size 40 mm dia 15 mtr. long of ISI mark.(all the required material will be supllied by the contractor).
Supply of GI strip of size 50x6mm for earthing of all newly erected structures and equipments in switchyard including cutting, fixing & proper welding with equipments. All LA will be seprately earth also as per RESPO norms. (All the required materials will be provided by firm.)
Installation of followig equipments on their respective structures including mechanical & electrical fixing after proper adjustment on their structure.
33 KV Bus Isolator
33 kv O/D CT CTR 200/100/1
Lightening Arrestor
33 KV VCB 800A 750 MVA
33 KV FUSE SET
Dismentaling of existing following damage equipments on their structure.
33 KV Bus Isolator
33 kv O/D CT CTR 200/100/1
33 KV VCB 800A 750 MVA
33 KV FUSE SET
33 KV Lightening Arrestor
33 KV CONTROL PANNAL FOR DOUBLE TF
Complete laying and termination of copper control cables from 10 MVA/5 MVA power T/F, 33 KV VCB, 33 KV CT in the out door switch yard to the existing transformer relay control panel inside the control room including cost of all materials and labour required for proper completion of works as per RESSPO drawings, including cost of testing of transformer, VCB, CT, relay pannel & proper relay settings as per requirement etc.
Control Cable 4x2.5 mm2
Control Cable 2x2.5 mm2
Erection & testing of double T/F Control penel in substation control room including grouting of anchor bolts of panel and making of pocket for control cable to insert in panel from trench and complete filling of control room's tranches by river sand.
Repairing of existing 33KV VCB in switchyard including repalcement of all required accessories as relay, motor, intrruptor etc. All type of material should be provided by the firm.
Carriage of old scrap/dismentaling material from site to store center Shahjahanpur
Repairnig of swichyard fencing complete in all respect, including cost of welding painting etc.
PART(E) WORK SPECIFICATION FOR SYSTEM STRENGTHENING WORK AT 33/11 V SUB-STAION NANAKPURI,IN EDD POWAYAN, SHAHJAHANPUR
Loading, unloading and safe carriage of the following materials from any Electy. Store Center of Electricity store division of Bareilly zone.
33 KV Lightening Arrestor
33 KV Line Isolator
Installation of followig equipments on their respective structures including mechanical & electrical fixing after proper adjustment on their structure.
33 KV Line Isolator
Lightening Arrestor
Dismentaling of existing following damage equipments on their structure.
33 KV Line Isolator
33 KV Lightening Arrestor
Carriage of old scrap/dismentaling material from site to store center Shahjahanpur
PART (F) WORK SPECIFICATION FOR SYSTEM STRENGTHENING WORK AT VARIOUS 33/11 V SUB-STAION SINDHOLI,MUDIYA PAWAR,JEWA,POWAYAN RURAL/TOWN,GANGASRA,BANDA,DHAKA GHANSHYAM,NANAKPURI,IN EDD POWAYAN, SHAHJAHANPUR
Loading, unloading and safe carriage of the following materials from any Electy. Store Center of Electricity store division of Bareilly zone.
33 KV Lightening Arrestor
33 KV Line Isolator
33 KV 400 A Bus Isolator
33 KV VCB 800A 750 MVA
33 kv O/D CT CTR 200/100/1
33 KV Protection Relay
33 KV FUSE SET
33 KV CONTROL PANNAL FOR DOUBLE TF
Earthing of indoor & outdoor equipments of Sub-Station after proper welding of joints and painting of earth strip above soil with proper clamp etc. as per RESPO approved drawing & resistance of earthing should be not more than 2Ω as per details given below.
Making of triangular bridge by using MS electrode, GI strip 50x6mm and GI Pipe 40 mm dia with providing of well type pipe earthing upto 15 Mtr. depth below ground level including welding etc. by boaring process at T/F neutral, LA and newly erected structure including cost of GI pipe of size 40 mm dia 15 mtr. long of ISI mark.(all the required material will be supllied by the contractor).
Supply of GI strip of size 50x6mm for earthing of all newly erected structures and equipments in switchyard including cutting, fixing & proper welding with equipments. All LA will be seprately earth also as per RESPO norms. (All the required materials will be provided by firm.)
Installation of followig equipments on their respective structures including mechanical & electrical fixing after proper adjustment on their structure.
33 KV Bus Isolator
33 KV Line Isolator
Lightening Arrestor
33 KV VCB
33 KV FUSE SET
Dismentaling of existing following damage equipments on their structure.
33 KV Bus Isolator
33 KV Line Isolator
33 KV VCB
33 KV FUSE SET
33 KV Lightening Arrestor
33 KV CONTROL PANNAL FOR DOUBLE TF
Complete laying and termination of copper control cables from 10 MVA/5 MVA power T/F, 33 KV VCB, 33 KV CT in the out door switch yard to the existing transformer relay control panel inside the control room including cost of all materials and labour required for proper completion of works as per RESSPO drawings, including cost of testing of transformer, VCB, CT, relay pannel & proper relay settings as per requirement etc.
Control Cable 4x2.5 mm2
Control Cable 2x2.5 mm2
Erection & testing of double T/F Control penel in substation control room including grouting of anchor bolts of panel and making of pocket for control cable to insert in panel from trench and complete filling of control room's tranches by river sand.
Repairing of existing 33KV VCB in switchyard including repalcement of all required accessories as relay, motor, intrruptor etc. All type of material should be provided by the firm.
Repacement of damage proection relay of 33 KV transformer control panel at different sub-station including proper connection .(all type of material will be provided by firm except relay.)
Carriage of old scrap/dismentaling material from site to store center Shahjahanpur
Repairnig of swichyard fencing complete in all respect, including cost of welding painting etc.
PART (G) WORK SPECIFICATION FOR SYSTEM STRENGTHENING WORK AT VARIOUS 33/11 V SUB-STAION IN JALALABAD DIV( jalalabad rural/town, madanapur, mirzapur, kalan, allhaganj,chauhnapur,) SHAHJAHANPUR
Loading, unloading and safe carriage of the following materials from any Electy. Store Center of Electricity store division of Bareilly zone.
33 KV Lightening Arrestor
33 KV Line Isolator
33 KV 400 A Bus Isolator
33 KV VCB 800A 750 MVA
33 kv O/D CT CTR 200/100/1
33 KV Protection Relay
33 KV FUSE SET
33 KV CONTROL PANNAL FOR DOUBLE TF
Control pannel for 33 KV Single T/F
Earthing of indoor & outdoor equipments of Sub-Station after proper welding of joints and painting of earth strip above soil with proper clamp etc. as per RESPO approved drawing & resistance of earthing should be not more than 2Ω as per details given below.
Making of triangular bridge by using MS electrode, GI strip 50x6mm and GI Pipe 40 mm dia with providing of well type pipe earthing upto 15 Mtr. depth below ground level including welding etc. by boaring process at T/F neutral, LA and newly erected structure including cost of GI pipe of size 40 mm dia 15 mtr. long of ISI mark.(all the required material will be supllied by the contractor).
Supply of GI strip of size 50x6mm for earthing of all newly erected structures and equipments in switchyard including cutting, fixing & proper welding with equipments. All LA will be seprately earth also as per RESPO norms. (All the required materials will be provided by firm.)
Installation of followig equipments on their respective structures including mechanical & electrical fixing after proper adjustment on their structure.
33 KV Bus Isolator
33 KV Line Isolator
Lightening Arrestor
33 KV VCB
33 KV FUSE SET
Dismentaling of existing following damage equipments on their structure.
33 KV Bus Isolator
33 KV Line Isolator
33 KV VCB
33 KV FUSE SET
33 KV Lightening Arrestor
33 KV CONTROL PANNAL FOR SINGLE/DOUBLE TF
Complete laying and termination of copper control cables from 10 MVA/5 MVA power T/F, 33 KV VCB, 33 KV CT in the out door switch yard to the existing transformer relay control panel inside the control room including cost of all materials and labour required for proper completion of works as per RESSPO drawings, including cost of testing of transformer, VCB, CT, relay pannel & proper relay settings as per requirement etc.
Control Cable 4x2.5 mm2
Control Cable 2x2.5 mm2
Erection & testing of double T/F Control penel in substation control room including grouting of anchor bolts of panel and making of pocket for control cable to insert in panel from trench and complete filling of control room's tranches by river sand.
Erection & testing of single T/F Control penel in substation control room including grouting of anchor bolts of panel and making of pocket for control cable to insert in panel from trench and complete filling of control room's tranches by river sand.
Repairing of existing 33KV VCB in switchyard including repalcement of all required accessories as relay, motor, intrruptor etc. All type of material should be provided by the firm.
Repacement of damage proection relay of 33 KV transformer control panel at different sub-station including proper connection .(all type of material will be provided by firm except relay.)
Repacement of damage WTI of 33 KV transformer at different sub-station including proper connection .(all type of material will be provided by firm)
Repacement of damage OTI of 33 KV transformer at different sub-station including proper connection .(all type of material will be provided by firm)
Carriage of old scrap/dismentaling material from site to store center Shahjahanpur
Repairnig of swichyard fencing complete in all respect, including cost of welding painting etc.
PART (H) REPLACEMENT OF 33 KV U/G CABLE NEAR TILHAR SUB-STATION OF 33 KV TILHAR TOWN LINE OF LENGTH 220 MTR.SINGLE CKT. SHAHJAHANPUR
Loading, unloading and safe carriage of the following materials from any Electy. Store Center of Electricity store division of Bareilly zone.
33 KV 3X300mm2 XLPE Cable
33 KV 3X300mm2 XLPE Cable jointing kit O/D
Laying of single circuit 33 KV 3X300 Sq. mm XLPE cable in normal soil by digging of trench 1050 mm deep, 750 mm wide including supply of required material as fine sand, 1st class bricks, stone slab. Inter axial spacing between the two cable should be in between 0.25 m to 0.40m including fixing of cable route marker with difference of 50 mtr. at time of cable laying with complete engraved details of 33 KV Line and depth of 33 KV cable. (All the material required for laying will be supplied by the contractor except 33 KV XLPE cable)
Hoisting of 33 KV 3X300 Sq. mm. XLPE cable on double pole with GI pipe of size 6" dia 3 M long including its jumpering complete with clamps, nuts and bolts.
Fixing of 33 KV O/D Cable Jointing Kit
M A ELECTRICALS
Bharat Trading Corporation
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .