Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.9 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹16.9 L+₹1.0 L (6.45%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | Rejected-Technical 00 MIYA BAZAR NAGAR NIGAM SHOP HATTHI ASTHAN MAYA BAZAR GORAKHPUR UTTAR PRADESH 273001 | GORAKHPUR | UTTAR PRADESH | 273001 | - | Rejected-Technical Certificate of Competence of BP approved by Executive Engineer not enclosing hence bid is rejected. |
| Sl No | Description | Qty | Unit | M/s Mishra Construction L2 | RAJ ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00Material-Lines&Cable Decentralised.A1 | |||||
| 1.01 | 11 KV CROSS ARM HOLDING CLAMP | 41 | No | 9,020 ₹9,020 Lowest | 9,393.1 ₹9,393.1 |
| 1.02 | F- BRACKET(Ex GST) | 41 | No | 10,250 ₹10,250 | 8,583.35 ₹8,583.35 Lowest |
| 1.03 | PIERCING CONNECTOR | 520 | No | 31,200 ₹31,200 | 20,540 ₹20,540 Lowest |
| 1.04 | 1*16 SQMM XLPE CABLE | 504 | Meter | 30,240 ₹30,240 Lowest | 39,816 ₹39,816 |
| 1.05 | Stay Clamps | 60 | No | 13,500 ₹13,500 Lowest | 13,746 ₹13,746 |
| 1.06 | LT FUSE SET with Box | 8 | No | 12,800 ₹12,800 | 12,640 ₹12,640 Lowest |
| 1.07 | TOP CHANNEL | 21 | No | 18,900 ₹18,900 | 4,811.1 ₹4,811.1 Lowest |
| 1.08 | DROPPER CHANNEL 100*50*1028MM | 23 | No | 18,400 ₹18,400 | 5,269.3 ₹5,269.3 Lowest |
| 1.09 | CLAMP FOR CHANNEL | 100 | No | 25,000 ₹25,000 | 22,910 ₹22,910 Lowest |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
17 Jun 2026, 4:00 pmClosed
Superintending Engineer
Superintending Engineer EDC Santkabirnagar
work of installing new distribution transformers at 21 locations under the Business Plan for the year 2026 27 within the jurisdiction of the Executive Engineer Electricity Distribution Division Khalilabad
2026_PVVNV_1155440_1
06/EDC(SKN)/2026-27
Open Tender
Electrical Works
Lump-sum
90 days
Santkabirnagar
As per Tender Specification
2 documents required · 2 mandatory
₹3,540
SE EDC SKN
₹20,000
30 Jun 2026
30 May 2026
18 Jun 2026
30 May 2026
17 Jun 2026
30 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Material-Lines&Cable Decentralised.A1 | |||||
| 1.01 | 11 KV CROSS ARM HOLDING CLAMP | 41 | No | - | - |
| 1.02 | F- BRACKET(Ex GST) | 41 | No | - | - |
| 1.03 | PIERCING CONNECTOR | 520 | No | - | - |
| 1.04 | 1*16 SQMM XLPE CABLE | 504 | Meter | - | - |
| 1.05 | Stay Clamps | 60 | No | - | - |
| 1.06 | LT FUSE SET with Box | 8 | No | - | - |
| 1.07 | TOP CHANNEL | 21 | No | - | - |
| 1.08 | DROPPER CHANNEL 100*50*1028MM | 23 | No | - | - |
| 1.09 | CLAMP FOR CHANNEL | 100 | No | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
TD_06.docx
Tender Documents • 0.16 MB
BOQ_2164442.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .