| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Finance 42 641 009 | COIMBATORE | TAMIL NADU | 641009 | ₹1.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹4.3 L (3.13%)Admitted-Finance 1 SRI GOKULAM COMPLEX 15 155B MARAPALAM MADUKKARAI COIMBATORE DISTRICT 641 105 | COIMBATORE | TAMIL NADU | 641105 | ₹1.4 Cr+₹4.3 L (3.13%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M S ENGINEERS L1 | ABBI ASSOCIATES L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavations in all soils and sub-soils and the full depth as may be directed by the Deptl.officers with initial leads and lifts and cleaning and leveling the site etc, complete complying with standard specification | 1,847.18 | m3 | 78 ₹1,44,080.04 Lowest | 84.5 ₹1,56,086.71 |
| 2.00 | Conveying the excavated earth from the site to the distance of 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges etc complete as per the direction of departmental officers. | 928.33 | m3 | 101 ₹93,761.33 Lowest | 110 ₹1,02,116.3 |
| 3.00 | Providing laying spreading and compacting wet mix macadam with clean,crushed,graded aggregates and granular material and finished in accordance with the requirements of the specifications and thickness as per approve plans or as directed by the departmental engineers | 928.33 | m3 | 2,137 ₹19,83,841.21 Lowest | 2,313 ₹21,47,227.29 |
| 4.00 | Prime coat over WMM using 7kg of 80/100 bitumen for 10 m2 area in manually including hire charges of machinery and labour charges etc., complete | 12,314.52 | m2 | 77.5 ₹9,54,375.3 Lowest | 84 ₹10,34,419.68 |
| 5.00 | Tack coat over WMM Surface using 2.5kg of 80/100 bitumen for 10 m2 area in manually including hire charges of machinery and labour charges etc., complete | 12,314.52 | m2 | 17.3 ₹2,13,041.2 Lowest | 19 ₹2,33,975.88 |
| 6.00 | Providing and laying 50mm compacted thick Dense Bitumenous macadam using 0.24 cum of 26.50mm - 13.20mm graded metal and 0.25 cum of 13.20 mm - 2.36mm graded metal and 0.23 cum of 2.36mm and below with 53.20 kgs of VG30/VG40 bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in central hot mix plant 20-30 tonne capacity, conveying the mix by tipper trucks to paver site, spreading the mix in required temperature in uniform thickness of 50mm with mechanical paver to the specified grades and cross section and compaction by 80-100 KN power roller to the required density etc., including labour for loading bitumen into bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges 20-30 tonne CMP with two bitumen boiler, tipper trucks, paver finisher /9m paver finisher, vibratory/pneumatic roller and all other tools and plant required,includingall other incidential charges etc., complete as per specification usinf CMP clause 504 of MORTH Rev-5 specification. | 615.73 | m3 | 10,600 ₹65,26,738 Lowest | 10,710 ₹65,94,468.3 |
| 7.00 | Providing and laying 30 mm compacted thickness Bitumenous concrete using 8% of Plastic waste and 0.13 cum of 19.00 - 9.50mm,0.17cum of 9.50-2.36mm and 0.26 cum of 2.36 and below graded metal with 46.28kgs of VG30/VG40 bitumen and 4.02kg of plastic Waste for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in central hot mix plant 20-30 tonne capacity, conveying the mix by tipper trucks to paver site, spreading the mix in required temperature in uniform thickness of 40mm with mechanical paver to the specified grades and cross section and compaction by 80-100 KN power roller to the required density etc., including labour for loading bitumen into bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges 20-30 tonne CMP with bitumen boiler, tipper trucks, paver finisher /9m paver finisher, vibratory/pneumatic roller and all other tools and plant required,includingall other incidential charges etc., complete as per specification usinf CMP clause 507 of MORTH Rev-5 specification. | 369.98 | m3 | 10,770 ₹39,84,684.6 Lowest | 10,993 ₹40,67,190.14 |
| 8.00GST 18% | |||||
Tender Value
₹1.6 Cr
EMD Value
₹1.6 L
Closing Date
29 Sept 2022, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Big bazaar street, Town hall, Coimbatore-1
Relaying of BT Surface at Velappan Street in Ward No.43,Maruthakutty Street in Ward No.44, Kamaraja Street in Ward No.45, West Sambantham road, Father Randy Street NS in Ward No.71 and Lawly Road II, Sakthi Mariamman Kovil Street, Thirumoorthi Layout
2022_MAWS_251612_5
e-43/2022 TURIP 2022-23 TWO COVER
Open Tender
Civil Works
Works
180 days
West Zone Package V
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1.6 L
JNNURM Conference Hall, Coimbatore Corporation
3 Oct 2022
14 Sept 2022
29 Sept 2022
14 Sept 2022
29 Sept 2022
14 Sept 2022
21 Sept 2022
Amount
Earth work excavations in all soils and sub-soils and the full depth as may be directed by the Deptl.officers with initial leads and lifts and cleaning and leveling the site etc, complete complying with standard specification
Conveying the excavated earth from the site to the distance of 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges etc complete as per the direction of departmental officers.
Providing laying spreading and compacting wet mix macadam with clean,crushed,graded aggregates and granular material and finished in accordance with the requirements of the specifications and thickness as per approve plans or as directed by the departmental engineers
Prime coat over WMM using 7kg of 80/100 bitumen for 10 m2 area in manually including hire charges of machinery and labour charges etc., complete
Tack coat over WMM Surface using 2.5kg of 80/100 bitumen for 10 m2 area in manually including hire charges of machinery and labour charges etc., complete
Providing and laying 50mm compacted thick Dense Bitumenous macadam using 0.24 cum of 26.50mm - 13.20mm graded metal and 0.25 cum of 13.20 mm - 2.36mm graded metal and 0.23 cum of 2.36mm and below with 53.20 kgs of VG30/VG40 bitumen for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in central hot mix plant 20-30 tonne capacity, conveying the mix by tipper trucks to paver site, spreading the mix in required temperature in uniform thickness of 50mm with mechanical paver to the specified grades and cross section and compaction by 80-100 KN power roller to the required density etc., including labour for loading bitumen into bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges 20-30 tonne CMP with two bitumen boiler, tipper trucks, paver finisher /9m paver finisher, vibratory/pneumatic roller and all other tools and plant required,includingall other incidential charges etc., complete as per specification usinf CMP clause 504 of MORTH Rev-5 specification.
Providing and laying 30 mm compacted thickness Bitumenous concrete using 8% of Plastic waste and 0.13 cum of 19.00 - 9.50mm,0.17cum of 9.50-2.36mm and 0.26 cum of 2.36 and below graded metal with 46.28kgs of VG30/VG40 bitumen and 4.02kg of plastic Waste for premixing per 10 sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in central hot mix plant 20-30 tonne capacity, conveying the mix by tipper trucks to paver site, spreading the mix in required temperature in uniform thickness of 40mm with mechanical paver to the specified grades and cross section and compaction by 80-100 KN power roller to the required density etc., including labour for loading bitumen into bitumen tank and metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges 20-30 tonne CMP with bitumen boiler, tipper trucks, paver finisher /9m paver finisher, vibratory/pneumatic roller and all other tools and plant required,includingall other incidential charges etc., complete as per specification usinf CMP clause 507 of MORTH Rev-5 specification.
ABBI ASSOCIATES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
ITB.pdf
Additional Documents • 0.05 MB
Pkg5.pdf
Tender Documents • 0.35 MB
BOQ_297832.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .