Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹206.2 CrAccepted-Finance ADMINISTRATIVE BUILDING TEXMACO RAIL ENGINEERING LIMITED TEXMACO RAIL ENGINEERING LTD BELGHARIA KOLKATA 700056 NORTH 24 PARGANAS WEST BENGAL 700056 | 24 PARAGANAS NORTH | WEST BENGAL | 700056 | ₹206.2 Cr | L-1 | Accepted-Finance Lowest offer for LOT-I and LOT-II |
| 2 | L-2₹237.7 CrRejected-Finance 3RD FLOOR PLANT 11 ALTERNATE MOBILE NO 98749 32329 GITESH VERMA AIR CONDITIONER REFRIGERATOR VIKHROLI WEST MUMBAI MAHARASHTRA 400079 | MUMBAI SUBURBAN | MAHARASHTRA | 400079 | ₹237.7 Cr | L-2 | Rejected-Finance Not lowest offer for LOT-I and LOT-II |
| 3 | L-3₹268.2 CrRejected-Finance | ₹268.2 Cr | L-3 | Rejected-Finance Not lowest offer for LOT-I and LOT-II |
| 4 | Rejected-Technical BELAPUR BHAVAN PLOT NO 6 SECTOR 11 CBD BELAPUR NAVI MUMBAI 400614 | THANE | MAHARASHTRA | 400614 | - | - | Rejected-Technical Technical offer does not fulfil EQC para 3.1.4. |
Tender Value
Refer Docs
EMD Value
₹1.7 Cr
Closing Date
18 Apr 2024, 12:30 pmClosed
GM Electrical
MRVC, 2nd floor, Churchgate station building, Churchgate Mumbai-400020
Design,Supply,Construction,Installation,TestingandCommissioning of 220/132/110/55kV TSS,SPandSSP with 2X25kV Scott connected transformer and associated work for quadrupling of VR-DRD Section and Suburban corridor between PNVL-KJT section Design Build
2024_MRVC_796673_1
MRVC/W/122
Open Tender
Electrical Works
730 days
virar-dahanu and panvel-karjat
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹1.7 Cr
Yes
MRVC, Churchgate, Mumbai
30 Jul 2024
21 Feb 2024
18 Apr 2024
21 Feb 2024
18 Apr 2024
25 Mar 2024
21 Feb 2024 - 5 Mar 2024
6 Mar 2024
LOT-I Design, Supply, Construction, Installation, Testing and Commissioning of 220/132/110/55kV TSS, SP & SSPs with 2X25 kV Scott connected transformers and associated work on Design and Build Basis for 3rd& 4th line between Virar-Dahanu Section (64 Route Km) of Western Railway
LOT-II Design, Supply, Construction, Installation, Testing and Commissioning of 220/132/110/55kV TSS, SP & SSPs with 2X25 kV Scott connected transformers and associated work on Design and Build Basis for New Suburban corridor between Panvel-Karjat section (30Route Km) of Central Railway
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid