| 1 | L1₹32.6 LAccepted-AOC NO 94 OLD NO 100 19TH MAIN ROAD 1ST N BLOCK RAJAJI NAGAR BANGALORE 560 010 | BANGALORE | BANGALORE | KARNATAKA | 560010 | L1 | Accepted-AOC Lowest quoted hence admitted | |
| 2 | L2₹33.7 L+₹1.1 L (3.23%)Rejected-AOC NO 23 SECOND MAIN ROAD RAJAMMAL NAGAR MADAMBAKKAM CHENNAI 600 126 | CHENNAI | CHENGALPATTU | TAMIL NADU | 600126 | L2 | Rejected-AOC Not Lowest quoted hence not admitted | |
| 3 | L3₹34.7 L+₹2.1 L (6.36%)Rejected-AOC | L3 | Rejected-AOC Not Lowest quoted hence not admitted | |
| 4 | L4₹35.0 L+₹2.4 L (7.27%)Rejected-AOC 5 45 10A PALACE ENCLAVE ARAMANE BAGILU ROAD NEAR VENKATRAMANA TEMPLE DAKSHINA KANNADA KARNATAKA 574227 INDIA | DAKSHINA KANNADA | KARNATAKA | 574227 | L4 | Rejected-AOC Not Lowest quoted hence not admitted | |
| 5 | Rejected-Technical | - | Rejected-Technical Not Admitted, The documents asked in Short fall is not submitted hence rejected |
Tender Value
Refer Docs
EMD Value
₹66,000
Closing Date
24 Jan 2023, 6:00 pmClosed
COL MANOJ NEGI
CWE AF North Bangalore Bellary Road JC Nagar Post Bangalore 560006
COMPREHENSIVE MAINTENANCE OF LIFTS IN VARIOUS BUILDING INCLUDING MAP ACCN AT CHAFB UNDER GE (AF) BANGALORE
2022_MES_569450_1
87475CWEAFNBAN
Open Tender
Civil Works
Item Rate
330 days
GE (AF) BANGALORE
AS PER NIT
7 documents required · 7 mandatory
₹500
GE (AF) BANGALORE
₹66,000
Yes
2 Mar 2023
16 Dec 2022
1 Feb 2023
17 Dec 2022
24 Jan 2023
9 Jan 2023
18 Dec 2022 - 27 Dec 2022
Amount
Comprehensive maintenance and repairs of microprocessor controlled VVV frequency drive electric driven passenger lift of 884 kg carrying 13 passengers ARD facility from ground plus five/six floors consisting of examining, adjusting, lubricating, greasing the parts. Including replacement of connected mentioned following parts such as Relays, Rectifier & Indication Display, Main Contactors transformers, Brake liner & Gear oil, motor oil & servicing lubrication, Gate lock switches, Gate levers, Gate breaks, Gate track rollers, contact switches and limit switches, Floor level with switch and oscillator switch, Car, Counter weight shoes and doors & Gate shoes, Pit Switch and safety Switches, Landing Floorsindicators, Car bush Buttons and Switches and Car indicators,Car top INS penal board, Emergency Alarm buttons, Up & down Indicator Cards, Limit switches and rollers, Aluminium Brackets, Controller MCB and PF & RR, OSG Roller and Lubrication, Guide Lubrication, Auto Door, Track Rollers and Linking Rolls, Door locks contact, Door lubrication and oil, OSG rope, OSG Clips & Main Rope and Xlips, Rope Tension Spring, OSG Safety Switch, RCR Coil rewinding & RCR Coil, bolt & nuts, Buffer spring,All door track rollers & Surclips, Travelling Cable, LOP & COP buttons with indicators, Door opening Buzzer, Stop Button, Door Stop Car & Landing Doors, Door screen sensor, Door screen sensor cable, PC Boards & repair to Mother Boards, Door Opening Emergency Keys, Breaking Releasing Brake handle, Car door frame, Landing and Car door safety switch wiring cables, Door sensor cable, Door contact switches, Door opening & Closing belt, Door limit switches, Door frame, Main Wheel pulley,replacement of main rope, Main brake wheel fill and etc, Main Gear bearing, Main Motor Bearing, Door Motor Rewinding/Replacing, Cabin Car Lights (LED), Exhaust Fan Rewinding and connected parts,cleaning of lifts etc any items connected to the above items will be provided by Contractor/Vendor. etc. complete all as directed by Engr-in - Charge. Make - KONE Loc -Bldg No P-223(G+6) at MAP Accn Pocket-I.
All as per item No 1.00 above but Make - KONE Bldg No P-224 (G+6) at MAP Accn Pocket-I.
All as per item No 1.00 above but Make - KONE Bldg No P-225 (G+6)at MAP Accn Pocket-I.
All as per item No 1.00 above but Make - KONE Bldg No P-226(G+6) at MAP Accn Pocket-II.
All as per item No 1.00 above but Make - KONE Bldg No P-227 (G+6)at MAP Accn Pocket-II.
All as per item No 1.00 above but Make - KONE Bldg No P-228 (G+6)at MAP Accn Pocket-II.
All as per item No 1.00 above but Make - KONE Bldg No P-229 (G+6)at MAP Accn Pocket-II.
All as per item No 1.00 above but Make - KONE Bldg No P-230 (G+5) at MAP Accn Pocket-II.
All as per item No 1.00 above but Make - KONE Bldg No P-231 (G+5) at MAP Accn Pocket-III.
All as per item No 1.00 above but Make - JOHNSON LOC-AIRMEN BILLET-1(G+5)
All as per item No 1.00 above but Make - JOHNSON LOC-AIRMEN BILLET-2(G+5)
All as per item No 1.00 above but Make - JOHNSON Bldg No P-265 (G+5)MES QTRS
All as per item No 1.00 above but Make : ECE Bldg No P-164(G+5)
All as per item No 1.00 above but Make - ECE Bldg - P-165(G+5)
All as per item No 1.00 above but Make ECE Bldg - P-166 (G+5)
All as per item No 1.00 above but Make ECE Bldg - P-167 (G+5)
All as per item No 1.00 above but Make:- THYSEEN KRUPP LTD at Path lab,(G+4)
All as per item No 1.00 above but for lift of 544kg 08 passengers Make:- THYSEEN KRUPP LTD at Path lab,(G+4)
All as per item No 1.00 above but for lift of 544kg 08 passengers Make - KONEBldg No P-223 (G+6) at MAP Accn Pocket-I.
All as per item No 1.00 above but for lift of 544kg 08 passengers Make - KONE Bldg No P-224(G+6) at MAP Accn Pocket-I.
All as per item No 1.00 above but for lift of 544kg 08 passengers Make - KONE Bldg No P-225(G+6) at MAP Accn Pocket-I.
All as per item No 1.00 above but for lift of 544kg 08 passengers Make - KONE Bldg No P-226 (G+6) at MAP Accn Pocket-II.
All as per item No 1.00 above but for lift of 544kg 08 passengers Make - KONE Bldg No P-227(G+6) at MAP Accn Pocket-II.
All as per item No 1.00 above but for lift of 544kg 08 passengers Make - KONE Bldg No P-228 (G+6) at MAP Accn Pocket-II.
All as per item No 1.00 above but for lift of 544kg 08 passengers Make : OTIS Bldg No P-107(G+5)
All as per item No 1.00 above but for lift of 544kg 08 passengers Make : OTIS Bldg No P-108(G+5).
All as per item No 1.00 above but for lift of 544kg 08 passengers Make Johnson Location : MNS Single Md Accn P-230(G+6)
All as per item No 1.00 above but for lift of 544kg 08 passengers Make Johnson Location: MNS Single Md Accn P-231(G+6)
All as per item No 1.00 above but for lift of 544kg 08 passengers Make:- THYSEEN KRUPP LTD at P127(G+5).
All as per item No 1.00 above but for lift of 544kg 08 passengers Make:- THYSEEN KRUPP LTD at P128(G+5).
All as per item No 1.00 above but for lift of 544kg 08 passengers Make:- THYSEEN KRUPP LTD at P129(G+5).
All as per item No 1.00 above but lift 1020 Kgs capacity 23 Passengers Make :- OTIS Location : OT Complex.(G+2)
All as per item No 1.00 above but bed cum passenger lift of capacity 15 Passengers Make - OTIS. Location Family Wing(G+2)
All as per item No 1.00 above but bed cum passenger lift of capacity 15 Passengers Make - OTIS. Location OT Complex(G+2)
All as per item No 1.00 above but bed cum passenger lift of capacity 20 Passengers Make - THYSSEN KRUP. Location Med Division(G+1). Note: For (SL item No 1 to 35) 1. In addition to items mentioned in item No 1 to 35 comprehensive maintenance of lifts also consist of the following: - (a) At Machine Room :(i) checking of motor oil, Gear Oil, controller all loose connection, Brake sleepage while moving and stopping, main rope condition, Drive condition & resistance loose connection, main switch (ii) Cleaning of Motor Gear Brake and Speed Governer (iii) Greasing of Pedestal, OSG diverted pulley (b) At Hoistway (i) Checking of Gate Locks, Read Switches, Guide rail bolts, Limit switches, RCR, Magnets, Car top reed switch, Main rope clips, thimple rod bolts split pins, safety pin, pit pulley, Car gate switches, Car shoe & counter weight shoe, Final limit switches, All brackets Carsill, Car top, landing sill (ii) Lubrication in pit pulley, for satisfactory operation of lifts as specified and as directed by Engr-in-Charge. 2. Monthly inspection and servicing of lifts shall be done by the original lifts manufacter/ MES Enlisted contractor who is holding the lift maintenance licence from state govt of karnataka and service report duly signed by the authorised company rep shall be submitted every month during the contract period. 3. The item rate quoted againist 1 to 35 as comprehensive maintenance is deemed to inclusive of any spares for satisfactory operation of lifts as specified above.
4. Attending lift break down/ rectifying all defects of unserviceable lift : If any lift gets struck/block/unserviceable at site the lift mechanic should attend the complaint within two hours on receipt of complaint and the complaint should be resolved without any futher delay. Incase the problem could not be solved , the matter should be informed to the contractor as well as to the MES authority. Further if the contractor failed to the rectify the fault a recovery @ of Rs 200/- per hour wef the time of lodging the complaint till completion of 24hrs will be recovered from the Contractor dues. Also incase of any lift requires repair for want of spares the contractor should provide the spare parts in time or within 24hrs the Lift should be made serviceable failing which a sum @ of Rs 500/- per hour wef the time after 24hrs should be recovered from the Contractor dues. The contractor should keep all the spare parts intact for the above mentioned. The rates should be quoted keeping in mind of the above mentioned expenses of the items from Item ser no 1 to 35 above). 5. A Lift mechanic shall be present at installation at night hours(2200 hrs to 0600 hrs) or as desired by the Engr-in-charge and the rates are deemed to be included in the quoted rate for rescue/ repairs at place directed by Engr-in-charge. Rate quoted deemed to be inclusive for the same. 6. A record of repairs carried out in each visit of each lift installation to be maintained separately duly signed by Contractor, JE and Eng-in-charge. The maintainenance certificate duly signed by contractor & concerned JE E/M and Eng-in-charge separately for each lift every monthy. 7 The lift mechanic to collect the complaint register daily and on completion/ rectification of complaint the register will be updated & signed. 8 The firm is responsible to purchase spare parts as required for day to day comprehensive maint shall be procured from lift original manufacturers/ auth distributor/ dealer only and the GST vouchers to be submitted to Deptt while claiming payments.
Carrying out Annual Inspection of lift by government lift inspector for worthiness certificate during the currency of contract aggreement within due dates including load testing as per lift act and submitting the worthiness certificate all as directed by Engineer-in-charge for the Lift as per schedule for Sl No-1 to 35.
M & L for Spray painting the lift with colour coding o as per site required of any capacity from Up to Ground +6 floor rangingafter preparation of rough unequasurface and applying two coats of synthetic enamel (as per guidelines of Engineer in charge) paint over a coat of primer on old steel surafces and floor wise number marking in front of lift in each floor all as specified and as directed.
Dismantling the existing unserviceable hoisting motor of 10 HP capacity 3 phase, 440 volts from site and carrying out rewinding, changing bearing and all connected parts etc including transporting the motor to the workshop and back and fixing to its original position all as specified and directed.
S &F ARD system in case of mains power failure and Lift control system failure, the Lift’s own rechargeable and maintenance free battery power shall move the car to the nearest floor and the door shall open automatically for automatic rescue of passengers. A battery run-down indicator shall be providedcomplete with Battery 12volts and battery charger and make the system functional all as specified and directed.
S &F Battery 12 Volts 7 AH for ARD System.
PREMIER ENGINEERING SYSTEMS
KAALIKA ELEVATORS
ICARE LIFTS PRIVATE LIMITED
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .