Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance ASHAA BHAVAN RAMNAGAR NAKA FAIZABAD | AYODHYA | UTTAR PRADESH | 224001 | Admitted-Finance |
| 3 | Admitted-Finance 524 NIMRI COLONY ASHOK VIHAR PHASE II NEW DELHI 110052 | NORTH WEST | DELHI | 110052 | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹24.7 L
EMD Value
₹49,481
Closing Date
16 Jun 2020, 3:00 pmClosed
The Executive Engineer
The Executive Engineer, North West Building-2, DTU Campus, Bawana Road, Delhi-110042
Construction of Boundary Wall on Plot Owned by SC/ST/OBC Financial and Development Corporation at E-Block, Sultanpuri, Delhi.
2020_PWD_191523_1
42/EE/PWD/NWB-2/2019-20 (MODIFIED) (2ND CALL)
Open Tender
Civil Works
Works
120 days
Delhi
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹49,481
16 Jun 2020
9 Jun 2020
16 Jun 2020
9 Jun 2020
16 Jun 2020
9 Jun 2020
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size).
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
1:1:2 (1 cement : 1 coarse sand : 2 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1:2 (1 cement : 1 coarse sand (zone-III) : 2 graded stone aggregate 20 mm nominal size).
Centering and shuttering including strutting, propping etc. and removal of form for:
Foundations, footings, bases of columns, etc. for mass concrete
Lintels, beams, plinth beams, girders, bressumers and cantilevers
Columns, Pillars, Piers, Abutments, Posts and Struts
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
Thermo-Mechanically Treated bars of grade Fe-500 D or more.
Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete,improve workability without impairing strength and durability as per direction of the Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/recoverable separately)
All works upto plinth level
Brick work with common burnt clay F.P.S. (non modular) bricks of 1st class in foundation and plinth in:
Cement mortar 1:4 (1 cement : 4 coarse sand)
Brick work with common burnt clay F.P.S. (non modular) bricks of 1st class in superstructure above plinth level up to floor V level in all shapes and sizes in :
Cement mortar 1:4 (1 cement : 4 coarse sand)
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.
In gratings, frames, guard bar, ladder, spikes, bhallas, railings, brackets, gates and similar works
12 mm cement plaster of mix :
1:4 (1 cement: 4 coarse sand)
15 mm cement plaster on rough side of single or half brick wall of mix:
1:4 (1 cement: 4 coarse sand)
Finishing walls with Acrylic Smooth exterior paint of required shade :
New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :
Two or more coats on new work
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.
Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
Nominal concrete 1:4:8 or leaner mix (i/c equivalent design mix)
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
In cement mortar
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
Providing and erecting 2.00 metre high temporary barricading at site; each panel of size 2.50m x 2.00m made of 40 x 40 x 6 mm angle iron or 50 x 50 x 3 mm hollow MS tube posts/ horizontal members/ bracings covered with 1.63 mm thick MS sheet. The sheet shall be fixed with 30 x 5 mm MS flat by suitable welding/ riveting. The panels shall be made so that gap of 50 cm above the ground is available making overall height as 2.5m. MS channel ISLC 75 @ 5.70 kg/ m, 50 cm long shall be provided as the bottom having oval shaped holes of size 50 x 25 mm at both ends with 50 cm long MS angle 40 x 40 x 6 mm bracing. Suitable arrangement shall be made to fix the barricading to avoid from overturning by providing 250 mm long expansion fasteners at both ends. The work shall be executed as per drawing/ direction of Engineer-in-Charge which includes writing and painting, arrangement for traffic diversion such as traffic signals during construction at site for day and night, glow lamps, reflective signs, marking, flags, caution tape as directed by the Engineer-in- Charge. The barricading provided shall be retained in position at site continuously i/c shifting of barricading from one location to another location as many times as required during the execution of the entire work till its completion. Rate include its maintenance for damages, painting, all incidentals, labour materials, equipments and works required to execute the job. The barricading shall not be removed without prior approval of Engineer-in-Charge. (Note :- One time payment shall be made for providing barricading from start of work till completion of work i/c shifting. The barricading provided shall remain to be the property of the contractor on completion of the work).
Credit for dismantled old bricks i/c necessary carriage etc. all complete as per the directions of the Engineer-in-Charge. (Old bricks should be removed from site of work and nothing extra shall be paid on account of removing mortar from old bricks & cleaning of old bricks ).
Suresh Ray
RAJESH GUPTA
Laxmi Narayan
S S Enterprises
lamba enterprises
bhagatconstruction
A R Construction Co.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .