| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.5 LAccepted-AOC | ₹13.5 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹18.7 LRejected-AOC | ₹18.7 L | L2 | Rejected-AOC Not Considered |
| 3 | L3₹20.5 LRejected-AOC PLOT NO 39 HIGH STREET VGN TRINITY GARDEN TAMBARAM WEST CHENNAI 600 045 | CHENNAI | CHENNAI | TAMIL NADU | 600045 | ₹20.5 L | L3 | Rejected-AOC Not Considered |
| 4 | L4₹21.7 LRejected-AOC | ₹21.7 L | L4 | Rejected-AOC Not Considered |
| 5 | Rejected-Technical | - | - | Rejected-Technical Evaluation Rejected |
| Sl No | Description | Qty | Unit | PREMKUMAR L2 | H.Venkateswaran L1 | MK DHANALAKSHMI INFRASTRUCTURE PRIVATE LIMITED L4 | Phoenix Engineering L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | cleaning juliflora jungle with uprooting | 1,795.2 | Sqm | 50 ₹89,760 | 2 ₹3,590.4 | 1 ₹1,795.2 Lowest | 5 ₹8,976 |
| 2.00 | Earth work excavation in all soils for Foundation with initial lead, lift, etc., complete. | 7 | cum | 200 ₹1,400 | 150 ₹1,050 | 150 ₹1,050 | 100 ₹700 Lowest |
| 3.00 | Supplying and filling with good river sand for foundation including cost of sand, all labour, lead,lift, consolidation etc. complete. | 13 | cum | 1,500 ₹19,500 | 500 ₹6,500 Lowest | 500 ₹6,500 Lowest | 1,600 ₹20,800 |
| 4.00 | PCC 1:3:6, with 40mm HBG m/c metal without form work including cost of all materials, cement, all labour, lead, lift, etc. complete. | 15 | cum | 5,500 ₹82,500 | 3,000 ₹45,000 Lowest | 5,000 ₹75,000 | 5,000 ₹75,000 |
| 5.00 | Providing PCC 1:2:4 raft using 20 mm HBG metal without form work including cost of all material, lead, lift, etc., complete but excluding cost of all respects | 21 | cum | 9,000 ₹1,89,000 | 4,000 ₹84,000 Lowest | 5,000 ₹1,05,000 | 5,000 ₹1,05,000 |
| 6.00 | Providing PCC 1:2:4 raft using 20 mm HBG metal with form work including cost of all material, lead, lift, etc., complete but excluding cost of all respects | 5 | cum | 9,000 ₹45,000 | 4,000 ₹20,000 Lowest | 6,500 ₹32,500 | 6,000 ₹30,000 |
| 7.00 | RCC 1:1.5:3 with 20mm HBG m/c metal with form work below GL including cost of all materials, cement, all labour, lead, lift, etc. complete. | 2.86 | cum | 11,000 ₹31,460 | 4,000 ₹11,440 Lowest | 5,000 ₹14,300 | 10,000 ₹28,600 |
| 8.00 | Laying Granolithic flooring 50mm thick in CC1:2:4, using 3 to 6mm HBG chips and mixing with ironite powder in the ratio of 2kg / bag of cement including cost of all materials, labour, lead, etc., and finish the top surface with extra cement and thread line as per direction and specification - 1 m2 | 110 | Sqm | 600 ₹66,000 | 250 ₹27,500 | 500 ₹55,000 | 150 ₹16,500 Lowest |
| 9.00 | Supplying, fabricating and placing in position of steel reinforcements including cost of steel, binding wire, labour, lead, lift etc complete . | 0.18 | MT | 90 ₹16.2 Lowest | 50,000 ₹9,000 | 15,000 ₹2,700 | 40,000 ₹7,200 |
| 10.00 | Supplying and spreading of well gravel for low lying area including cost of well gravel, labour for consolidation, lead, lift, etc. complete. | 96 | cum | 800 ₹76,800 | 50 ₹4,800 Lowest | 800 ₹76,800 | 300 ₹28,800 |
Tender Value
Refer Docs
EMD Value
₹21,800
Closing Date
23 Feb 2026, 2:00 pmClosed
SE/GCC-II/CNI
Superintending Engineer, GCC II, 230 KV CMRL GIS SS, Alandur, Chennai-16
Civil miscellaneous works in control room building for ARS Garden 110/33 KV Sub Station.
2026_EB_654041_1
OT-92/2025-26 of SE/GCC-II
Open Tender
Civil Works
Works
120 days
ARS Garden
Please refer tender documents
2 documents required · 2 mandatory
₹0
₹21,800
Yes
20 Jul 2026
10 Feb 2026
24 Feb 2026
10 Feb 2026
23 Feb 2026
10 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | cleaning juliflora jungle with uprooting | 1,795.2 | Sqm | - | - |
| 2 | Earth work excavation in all soils for Foundation with initial lead, lift, etc., complete. | 7 | cum | - | - |
| 3 | Supplying and filling with good river sand for foundation including cost of sand, all labour, lead,lift, consolidation etc. complete. | 13 | cum | - | - |
| 4 | PCC 1:3:6, with 40mm HBG m/c metal without form work including cost of all materials, cement, all labour, lead, lift, etc. complete. | 15 | cum | - | - |
| 5 | Providing PCC 1:2:4 raft using 20 mm HBG metal without form work including cost of all material, lead, lift, etc., complete but excluding cost of all respects | 21 | cum | - | - |
| 6 | Providing PCC 1:2:4 raft using 20 mm HBG metal with form work including cost of all material, lead, lift, etc., complete but excluding cost of all respects | 5 | cum | - | - |
| 7 | RCC 1:1.5:3 with 20mm HBG m/c metal with form work below GL including cost of all materials, cement, all labour, lead, lift, etc. complete. | 2.86 | cum | - | - |
| 8 | Laying Granolithic flooring 50mm thick in CC1:2:4, using 3 to 6mm HBG chips and mixing with ironite powder in the ratio of 2kg / bag of cement including cost of all materials, labour, lead, etc., and finish the top surface with extra cement and thread line as per direction and specification - 1 m2 | 110 | Sqm | - | - |
| 9 | Supplying, fabricating and placing in position of steel reinforcements including cost of steel, binding wire, labour, lead, lift etc complete . | 0.18 | MT | - | - |
| 10 | Supplying and spreading of well gravel for low lying area including cost of well gravel, labour for consolidation, lead, lift, etc. complete. | 96 | cum | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_784279.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].