| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.5 LAdmitted-Finance | ₹13.5 L | L1 | Admitted-Finance |
| 2 | L2₹18.7 LAdmitted-Finance | ₹18.7 L | L2 | Admitted-Finance |
| 3 | L3₹20.5 LAdmitted-Finance PLOT NO 39 HIGH STREET VGN TRINITY GARDEN TAMBARAM WEST CHENNAI 600 045 | CHENNAI | CHENNAI | TAMIL NADU | 600045 | ₹20.5 L | L3 | Admitted-Finance |
| 4 | L4₹21.7 LAdmitted-Finance | ₹21.7 L | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical Evaluation Rejected |
| Sl No | Description | Qty | Unit | PREMKUMAR L2 | H.Venkateswaran L1 | MK DHANALAKSHMI INFRASTRUCTURE PRIVATE LIMITED L4 | Phoenix Engineering L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | cleaning juliflora jungle with uprooting | 1,795.2 | Sqm | 50 ₹89,760 | 2 ₹3,590.40 | 1 ₹1,795.20 | 5 ₹8,976 |
| 2.00 | Earth work excavation in all soils for Foundation with initial lead, lift, etc., complete. | 7 | cum | 200 ₹1,400 | 150 ₹1,050 | 150 ₹1,050 | 100 ₹700 |
| 3.00 | Supplying and filling with good river sand for foundation including cost of sand, all labour, lead,lift, consolidation etc. complete. | 13 | cum | 1,500 ₹19,500 | 500 ₹6,500 | 500 ₹6,500 | 1,600 ₹20,800 |
| 4.00 | PCC 1:3:6, with 40mm HBG m/c metal without form work including cost of all materials, cement, all labour, lead, lift, etc. complete. | 15 | cum | 5,500 ₹82,500 | 3,000 ₹45,000 | 5,000 ₹75,000 | 5,000 ₹75,000 |
| 5.00 | Providing PCC 1:2:4 raft using 20 mm HBG metal without form work including cost of all material, lead, lift, etc., complete but excluding cost of all respects | 21 | cum | 9,000 ₹1.9 L | 4,000 ₹84,000 | 5,000 ₹1.1 L | 5,000 ₹1.1 L |
| 6.00 | Providing PCC 1:2:4 raft using 20 mm HBG metal with form work including cost of all material, lead, lift, etc., complete but excluding cost of all respects | 5 | cum | 9,000 ₹45,000 | 4,000 ₹20,000 | 6,500 ₹32,500 | 6,000 ₹30,000 |
| 7.00 | RCC 1:1.5:3 with 20mm HBG m/c metal with form work below GL including cost of all materials, cement, all labour, lead, lift, etc. complete. | 2.86 | cum | 11,000 ₹31,460 | 4,000 ₹11,440 | 5,000 ₹14,300 | 10,000 ₹28,600 |
| 8.00 | Laying Granolithic flooring 50mm thick in CC1:2:4, using 3 to 6mm HBG chips and mixing with ironite powder in the ratio of 2kg / bag of cement including cost of all materials, labour, lead, etc., and finish the top surface with extra cement and thread line as per direction and specification - 1 m2 | 110 | Sqm | 600 ₹66,000 | 250 ₹27,500 | 500 ₹55,000 | 150 ₹16,500 |
| 9.00 | Supplying, fabricating and placing in position of steel reinforcements including cost of steel, binding wire, labour, lead, lift etc complete . | 0.18 | MT | 90 ₹16.20 | 50,000 ₹9,000 | 15,000 ₹2,700 | 40,000 ₹7,200 |
| 10.00 | Supplying and spreading of well gravel for low lying area including cost of well gravel, labour for consolidation, lead, lift, etc. complete. | 96 | cum | 800 ₹76,800 | 50 ₹4,800 | 800 ₹76,800 | 300 ₹28,800 |
Tender Value
Refer Docs
EMD Value
₹21,800
Closing Date
23 Feb 2026, 2:00 pmClosed
SE/GCC-II/CNI
Superintending Engineer, GCC II, 230 KV CMRL GIS SS, Alandur, Chennai-16
Civil miscellaneous works in control room building for ARS Garden 110/33 KV Sub Station.
2026_EB_654041_1
OT-92/2025-26 of SE/GCC-II
Open Tender
Civil Works
120 days
ARS Garden
Please refer tender documents
2 documents required · 2 mandatory
₹0
₹21,800
Yes
21 Apr 2026
10 Feb 2026
24 Feb 2026
10 Feb 2026
23 Feb 2026
10 Feb 2026
cleaning juliflora jungle with uprooting
Earth work excavation in all soils for Foundation with initial lead, lift, etc., complete.
Supplying and filling with good river sand for foundation including cost of sand, all labour, lead,lift, consolidation etc. complete.
PCC 1:3:6, with 40mm HBG m/c metal without form work including cost of all materials, cement, all labour, lead, lift, etc. complete.
Providing PCC 1:2:4 raft using 20 mm HBG metal without form work including cost of all material, lead, lift, etc., complete but excluding cost of all respects
Providing PCC 1:2:4 raft using 20 mm HBG metal with form work including cost of all material, lead, lift, etc., complete but excluding cost of all respects
RCC 1:1.5:3 with 20mm HBG m/c metal with form work below GL including cost of all materials, cement, all labour, lead, lift, etc. complete.
Laying Granolithic flooring 50mm thick in CC1:2:4, using 3 to 6mm HBG chips and mixing with ironite powder in the ratio of 2kg / bag of cement including cost of all materials, labour, lead, etc., and finish the top surface with extra cement and thread line as per direction and specification - 1 m2
Supplying, fabricating and placing in position of steel reinforcements including cost of steel, binding wire, labour, lead, lift etc complete .
Supplying and spreading of well gravel for low lying area including cost of well gravel, labour for consolidation, lead, lift, etc. complete.
Brick work in CM 1:5 using Second sort chamber burnt bricks at basement level including cost of all materials ,leads and lifts etc. complete.
Plastering with CM 1:3-12mm thick for wall both interior and exterior faces including cost of all materials lead lift etc complete.
Loading, transport, unloading of Debris and waste construction materials available at substation to waste yard including cost of all materials ,lead ,lift ,labour , etc.complete
Supplying fabricating and fixing in position natural color matt finish Aluminum door half glazed & half MDF Board using aluminum box section 45x50x2mm for top, middle, vertical section 45x45x2mm sides, 95x45x2mm for bottom, top 900mm fixed with 5.5mm thick Machine Frosted float glass ( Mode, Saint Gobin or equivalent ) and bottom two section with 12mm thick MDF boards two sides laminated approved quality Mortice lock, designed aluminum handles at front and back, pivot at top and bottom, door closer etc including the cost of all materials, labour, lead, lift, T & Ps etc complete. In accordance with ISI 1868, 1962 specification for an average anodic film thickness not less than 5 microns and all the materials should be got approved from the Executive Engineer before use.
Supplying and fixing of prepolished hydraulic pressed non-skid, vibrated concrete tiles of approved design and colour 20 mm thick set in cm 1:3, 10mm thick for stepes etc., complete as per direction.
White washing with freshly burnt shell lime White colour (in Ceiling Portion) including cost of Lime and other materials brushes scaffolding chares et complete complying with standard specification as directed by site engineer
Painting 2 Coats with Approved Plastic Emulsion paint over one priming coat of plastinc emulsion paint over cement plastered wall surface ceiling and other new surface and including cleaing preparing the surface and curing etc., Complete
Painting New Iron works with two coats synthetic enamal paint over one coat of primer including coas of all material lead lift
Supplying and fixing in position of Aluminium Dye cast Powder coated letters of various sizes an emblem in 12mm thick as per the requiremnet of boad including cost of all materials aluminium letter emblem scaffoldings etc., complete as direscted by the engineer (TNEB emblem 1.2m Dia)
Supplying and fixing in position of Aluminium Dye cast Powder coated letters of various sizes an emblem in 12mm thick as per the requiremnet of boad including cost of all materials aluminium letter emblem scaffoldings etc., complete as direscted by the engineer (45cm size letters)
Supplying and fixing in position of Aluminium Dye cast Powder coated letters of various sizes an emblem in 12mm thick as per the requiremnet of boad including cost of all materials aluminium letter emblem scaffoldings etc., complete as direscted by the engineer (30 cm size letters)
Supplying and fixing in position of Aluminium Dye cast Powder coated letters of various sizes an emblem in 12mm thick as per the requiremnet of boad including cost of all materials aluminium letter emblem scaffoldings etc., complete as direscted by the engineer (23 cm size letters)
Suplying, fabricating and fixing in position of MS angle fence post with MS angle with making necessary groovs in that to fix the barbed wire fencing including cost of all materials, all labour,lead, lift, etc. and cost of red-oxide primer and two coats of approved enamel paint etc., complete as directed by the engineer at site.
Supplying and tying chain link size 50mm Sq. 3.15 m ht PVC coated including cost of all materials, labour, lead, lift etc.complete.
Providing Barbed wire fencing 10 Gauge - Two ply four pronged (Galvanised) over the compound wall in three rows with Y angles at regular intervals including cost of barbed wire, labour, lead, lift, etc., complete but excluding the cost of M.S.Angles.
Supplying and fixing of Name board using 18mm thick MS board and 45x6mm angles and letter painting etc., including cost of all materials, labour,etc.,complete.
Supplying and sticking the name / designation stickers in doors identifying the rooms including cost of material, labour etc. complete.
Supplying and fixing the Check Guard Plate of 6mm Thick in control room for control panels with initial lead lift etc.,
Supplying and providing of 300mm dia, flower pots containing green plants as directed by the Engineer at site.
GST for bidders outside TamilNadu (IGST)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
techsummary_784279.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_784279.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid