| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.6 LAccepted-Finance | ₹17.6 L | L1 | Accepted-Finance Accepted |
| 2 | L2₹21.9 LAccepted-Finance | ₹21.9 L | L2 | Accepted-Finance Accepted |
| 3 | L3₹22.3 LAccepted-Finance | ₹22.3 L | L3 | Accepted-Finance Accepted |
| Sl No | Description | Qty | Unit | G K P Const. Project Company L1 | M/S MADHU CONSTRUCTION L3 | M/S DURGA ELECTRIC L2 |
|---|---|---|---|---|---|---|
| 1.00Survey of Substations | ||||||
| 2.00 | Checking of incomming & outgoing VCB Panel working and parts on Quarterly basis( once in a three (03) month) | 40 | Yearly per Substation | 4,000 ₹1.6 L | 5,000 ₹2 L | 4,900 ₹2.0 L |
| 3.00Work | ||||||
| 4.00 | Complete overhauling of Panel, insulation of bus bar with HT Tape, Empire Tape and cleaning of spouts | 11 | JOB | 4,000 ₹44,000 | 4,500 ₹49,500 | 4,400 ₹48,400 |
| 5.00 | Complete Overhauling of Trolley and Manual and Motorised charging mechanism. | 11 | JOB | 2,000 ₹22,000 | 2,300 ₹25,300 | 2,200 ₹24,200 |
| 6.00 | Repairing and adjusting of Tripping Assembly and circuit. | 11 | JOB | 2,000 ₹22,000 | 2,500 ₹27,500 | 2,400 ₹26,400 |
| 7.00 | Repairing and adjusting of Closing Assembly and circuit. | 11 | JOB | 2,000 ₹22,000 | 2,500 ₹27,500 | 2,400 ₹26,400 |
| 8.00 | Adjusting of tripping and closing timing of breaker by checking contact resistance of Vacuum Interrupter of VCB. | 11 | JOB | 1,500 ₹16,500 | 2,000 ₹22,000 | 1,900 ₹20,900 |
| 9.00 | Replacement and Adjustment of Vacuum Interrupter | 11 | JOB | 1,500 ₹16,500 | 2,000 ₹22,000 | 1,900 ₹20,900 |
| 10.00 | Repairing and Adjusting of shutter Assembly | 11 | JOB | 2,500 ₹27,500 | 3,200 ₹35,200 | 3,200 ₹35,200 |
Tender Value
₹17.7 L
EMD Value
₹18,000
Closing Date
22 Jan 2026, 5:00 pmClosed
se
EDC Sonbhadra
Maintenance of VCB
2026_PVVNV_1106197_1
59/EDC(so)/2025-26
Open Tender
Electrical Works
90 days
sonbhadra
Pleased Ref Doc.
2 documents required · 2 mandatory
₹3,540
SE EDC SONEBHADRA Bank A/c No.089105000853
₹18,000
24 Mar 2026
14 Jan 2026
23 Jan 2026
14 Jan 2026
22 Jan 2026
14 Jan 2026
Checking of incomming & outgoing VCB Panel working and parts on Quarterly basis( once in a three (03) month)
Complete overhauling of Panel, insulation of bus bar with HT Tape, Empire Tape and cleaning of spouts
Complete Overhauling of Trolley and Manual and Motorised charging mechanism.
Repairing and adjusting of Tripping Assembly and circuit.
Repairing and adjusting of Closing Assembly and circuit.
Adjusting of tripping and closing timing of breaker by checking contact resistance of Vacuum Interrupter of VCB.
Replacement and Adjustment of Vacuum Interrupter
Repairing and Adjusting of shutter Assembly
Repairing and Adjusting of Interlocks
Servicing and adjusting of Spring charging Motor
Repairing of spouts with complete cleaning and adjusting
Complete cleaning of trench, tightening of cable boxes with rerouting of cable
Complete wiring of Pannels with checking of fuse and indicators
Complete testing of Tripping system of Breaker for successful Tripping
Replacement of Damage CT/PT Including Wiring
Cam Shaft Assembly
Charging Motor Rectifier
Charging Spring
HRC Fuse 3.15 Amp
Indicators
Flexible Connections
Charging Gear Big with Bearing
Charging Gear Small with Bearing
Insulated Housing Assembly for VI
Tulip contact
Upper Terminal Assembly
Lower Terminal Assembly
Rack In Gear
Tripping Coil 24V
Tripping Plate
Rack out Gear
Copper Wire 1.5 mm
Crank Assembly
Drive Shaft
Charging Handle
I/O Spout Set Busbar Side
I/O Spout Set CT Side
Closing Assembly
Closing Coil (24 V DC)
TNC Switch
Pla Relay
Terminals
Limit Switches
HRC Fuse 2A, 6A
Charging Motor
Vacuum Interrupter of different make
Support Insulator
Copper Strip Busbar (3 Phase for 1 Meter)
Auxiliary Switch
MCB 32AMP, 3P
SPACE HETER
THERMOSTATE
Ampere Meter
Volt Meter
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
Technical59.pdf
Tender Documents • 0.36 MB
BOQ_2040940.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid