Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC Less Estimate Value |
| 2 | L2₹1.1 Cr+₹3.6 L (3.31%)Rejected-Finance | ₹1.1 Cr+₹3.6 L (3.31%) | L2 | Rejected-Finance Above Estimate Rate |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
18 Jul 2023, 3:00 pmClosed
JOINT DIRECTOR/PROJECT DIRECTOR
DRDA, PUDUKKOTTAI
MGSMT 25 Percent -22-23- Pack - 16 -Strengthening and Five years Maintenace of Two Roads in Avudaiyarkoil Block-Pudukkottai District
2023_RDTN_331035_1
Avudaiyarkoil-16-/MGSMT 25 Percent -22-23/PDK
Open Tender
Civil Works
Item Rate
180 days
PUDUKKOTTAI
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.1 L
16 Nov 2023
23 Jun 2023
18 Jul 2023
23 Jun 2023
18 Jul 2023
23 Jun 2023
Amount
R-249 Strengthening to the Palaiyur vennathur road KM 0/0-1/600
Earth work excavation in all clauses of soils using hydraulic excavator and tippers with disposal upto 1000m excavation of road work in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections and transporting to the embankment location with a lift upto 1.5m and lead upto 1000m as per Technical Specification clause 302.3.
Scarifying existing worn out BT surface to a depth of 150mm by Mechanical means and scarifying existing granular surface to a depth of 150mm and disposal of scarifying material with a lift upto 3m and leads upto 1000m as per Technical Specification Clauses 301.4
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 23.232Kg of bitumen and 1.168 Kg of Plastic waste for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm.departmental condition mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms
Road Marking with hot applied thermoplastic compound with Reflectorising Glass Beads on Bituminous surface
Reinforced cement concrete M15 grade kilometre stone, Hectametre stone and Guard stone of standard design as per IRC-8 fixing in position including painting and printing, etc as per drawing and Technical Specification clause 1703.
b. Provision for HM Stones (precast)
a. Provision for KM Stones (precast)
a. 60cm Equilateral triangle (Cautionary) sign boards
Providing and fixing Name board cum Citizen Board etc
Construction of RCC NP3 Pipe caseway @ Ch 640-655
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation.
Filling with Good river Sand including cost and conveyance of sand to work site including all labour charges for filling etc complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete.
Cost & Supply of RCC Pipe 900mm dia (NP3)
Supplying and filling girty gravel including cost and conveyance of gravel at site and all labour charges for filling ect., complete.
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Guard stone
Construction of 1.50m RCC slab Culvert @ Ch 10
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation.
Filling with Good river Sand including cost and conveyance of sand to work site including all labour charges for filling etc complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete.
Above sill
Supplying and fabrication of steel rods including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement Concrete 1:1.5:3 mix using 20mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
Gravel filling between body wall including cost and conveyance of gravel, labour for filling, watering and compacting etc complete complying with standard specification and as directed by the departmental officer.
DPR preparation
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
R-125 Strengthening to the Gopalapattinam road KM 0/0-1/0
Earth work excavation in all clauses of soils using hydraulic excavator and tippers with disposal upto 1000m excavation of road work in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections and transporting to the embankment location with a lift upto 1.5m and lead upto 1000m as per Technical Specification clause 302.3.
Scarifying existing worn out BT surface to a depth of 150mm by Mechanical means and scarifying existing granular surface to a depth of 150mm and disposal of scarifying material with a lift upto 3m and leads upto 1000m as per Technical Specification Clauses 301.4
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 23.232Kg of bitumen and 1.168 Kg of Plastic waste for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms
Reinforced cement concrete M15 grade kilometre stone, Hectametre stone and Guard stone of standard design as per IRC-8 fixing in position including painting and printing, etc as per drawing and Technical Specification clause 1703.
b. Provision for HM Stones (precast)
a. Provision for KM Stones (precast)
a. 60cm Equilateral triangle (Cautionary) sign boards
Providing and fixing Name board cum Citizen Board etc
Construction of RCC NP3 Pipe Culvert @ Ch 100m
Earth work excavation and depositing on sides with initial lead and lift in hard graually soil as per SS 20B for foundation.
Filling with Good river Sand including cost and conveyance of sand to work site including all labour charges for filling etc complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Centering for the sides and soffits RCC items including all cost and conveyance and all labour charges etc., complete.
Cost & Supply of RCC Pipe 900mm dia (NP3)
Supplying and filling course gravel including cost and conveyance of gravel at site and all labour charges for filling ect., complete.
Towards DPR preparation
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
PALANISAMY UDAYAR PALANIAMMAL
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .