Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹65.6 LAccepted-AOC | L1 | Accepted-AOC L1 CONTRACTOR | |
| 2 | L2₹68.9 L+₹3.3 L (5.02%)Rejected-Finance MADURAI | MADURAI | TAMIL NADU | 625001 | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹67,000
Closing Date
10 Jan 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Additional collector DRDA Madurai
o/o Additional collector DRDA Madurai
Upgradation of M.Puliyankulam Mangammal road KM 0/0-1/400 (R215) in Kallikudi Block in Madurai district under NABARD XXX (2024-25)
2024_RDTN_514730_17
DIPR/5603/Tender/2024
Open Tender
Civil Works - Roads
Item Rate
180 days
Kallikudi
Refer Tender documents
5 documents required · 5 mandatory
₹0
₹67,000
o/o Additional collector DRDA Madurai
6 Feb 2025
31 Dec 2024
10 Jan 2025
31 Dec 2024
10 Jan 2025
3 Jan 2025
3 Jan 2025
Amount
Part-1:- Upgradation Of M.Puliyankulam Mangammal Road (R215) KM 0/0 - 1/400
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Construction of Retaining wall Ch @ 0/0-0/020 KM(Sub Estimate Enclosed)
Earthwork excavation in all classes of soils such as gravelly soils, hard stiffclay, and earth mixed silt or other loose soils sandy loam and ordinary soil but including depositing on banks with all leads and lifts including all charges etc complete.
Supplying and filling with river sand from approved quarry including cost and conveyance to work site and as directed by the dept officers etc complete.
Cement Concrete 1:4:8 mix (one cement, four sand,eight hard broken stone) using 40mm ISS HBG stone jelly for Foundation and flooring including labour charges for mixing concrete watring and laying the concrete complying with standard specifications etc c
Supplying and centering shuttering including necessary support for side walls and drains using steel sheets complying with standard specification as directed by departmental officers.
For BGL sides IInd Footing
Above GL sides
Cement concrete 1:3:6 mix using 40mm metal, ISS HBG metal including all cost and onveyance of all materials and all labour charges etc., complete
Supply and fixing of Weep Hole Chatges
Supply and fixing of HM stone SI No. 44 A
Supply and fixing of KM stone SI No. 44 A
Road Stud With Lens Reflector
Road Marking Hot applied Thermoplastic Compound With Reflectorising based on Bituminous Surface
Provision For Cautionary Sign Board
Provision for ,Name board etc.
Part-B:- Maintenance work
Maintenance Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to the above Government Contract Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
HEADWAY CONSTRUCTION (BID ID -1229414)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .