| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAccepted-AOC | L1 | Accepted-AOC L1 Accpeted | |
| 2 | L2₹7.4 L+₹3,427.02 (0.46%)Rejected-Finance | L2 | Rejected-Finance L2 Rejected |
| Sl No | Description | Qty | Unit | SSM ENGINEERING CONSTRUCTION L1 | S. ANANDABABU L2 |
|---|---|---|---|---|---|
| 1.00Construction of Bus shelter at Pulavanarkudi in Edaiyathur Panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for foundation. | 15.7 | Cum | 264 ₹4,144.8 Lowest | 265 ₹4,160.5 |
| 3.00 | Filling with M.Sand including cost and conveyance of sand to work site including all labour charges for filling etc complete. | 4.11 | Cum | 1,932 ₹7,940.52 Lowest | 1,942 ₹7,981.62 |
| 4.00 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges and all other incidental charges etc., completed. | 5.12 | Cum | 5,681 ₹29,086.72 Lowest | 5,709 ₹29,230.08 |
| 5.00 | R.C.C. 1:11.5:3 MIX USING 20MM HBG METAL including cost and conveyance of all materials to work site and all labour charges etc.complete | 13.1 | Cum | 9,600 ₹1,25,760 Lowest | 9,648 ₹1,26,388.8 |
| 6.00 | Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of all materials to site and labour charges etc. complete | 90.33 | Sqm | 1,094 ₹98,821.02 Lowest | 1,099 ₹99,272.67 |
| 7.00 | Supplying fabricating and placing in position mild steel or ribbed for steel and all roinforced cement concrete works as per the design given including cost of steel and binding wire in all foors etc., complete complying with standard specification. | 0.95 | Mt | 91,991 ₹87,391.45 Lowest | 92,451 ₹87,828.45 |
| 8.00 | Brick work in cement mortar 1:5 (one cement and five sand) using country bricks ground moulded of size 23 x 11 x 7 cm. For the following including curing etc. complete complying with standard specification. For super structure in Ground floor. | 18.03 | Cum | 6,199 ₹1,11,767.97 Lowest | 6,230 ₹1,12,326.9 |
| 9.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 32.05 | Sqm | 309 ₹9,903.45 Lowest | 311 ₹9,967.55 |
| 10.00 | Plastering with cement mortor 1:5 (one cement and five sand) 12mm thick in all floor including curing etc. complete complying with standard specification. | 127.97 | Sqm | 288 ₹36,855.36 Lowest | 289 ₹36,983.33 |
Tender Value
₹7.5 L
EMD Value
₹7,500
Closing Date
28 Aug 2025, 3:00 pmClosed
Block Development Officer(BP)
Panchayaat Union Office, Ponnamaravathy
Construction of Bus shelter at Pulavanarkudi in Edaiyathur Panchayat
2025_RDTN_593653_1
PNR/SIUS/NNT_02
Open Tender
Civil Works
Item Rate
Ponnamaravathy
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹7,500
11 Sept 2025
16 Aug 2025
28 Aug 2025
16 Aug 2025
28 Aug 2025
16 Aug 2025
Amount
Construction of Bus shelter at Pulavanarkudi in Edaiyathur Panchayat
Earth work excavation and depositing on bank with initial lead and lift in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for foundation.
Filling with M.Sand including cost and conveyance of sand to work site including all labour charges for filling etc complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges and all other incidental charges etc., completed.
R.C.C. 1:11.5:3 MIX USING 20MM HBG METAL including cost and conveyance of all materials to work site and all labour charges etc.complete
Supplying and errecting centring for sides and soffits of all RCC works including cost and conveyance of all materials to site and labour charges etc. complete
Supplying fabricating and placing in position mild steel or ribbed for steel and all roinforced cement concrete works as per the design given including cost of steel and binding wire in all foors etc., complete complying with standard specification.
Brick work in cement mortar 1:5 (one cement and five sand) using country bricks ground moulded of size 23 x 11 x 7 cm. For the following including curing etc. complete complying with standard specification. For super structure in Ground floor.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Plastering with cement mortor 1:5 (one cement and five sand) 12mm thick in all floor including curing etc. complete complying with standard specification.
Finishing the top of roof with one course of Pressed tiles conveyance of all materials to site and all labour charges etc complete
Supplying and Fixing of creamic Tiles including cost and conveyance of all materials to site and all labour charges etc., complete.
Supplying and Fixing of Glaized Tiles including cost and conveyance of all materials to site and all labour charges etc., complete.
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Exterior Emulsion Two coats Painting including Cleaning, preparing the Surface including cost and conveyance of all materials to site and all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 1 & 16 of Section 2 of Instruction to Bidders (ITB) of SBD)
S. ANANDABABU (BID ID -1441426)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .