| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.9 LAccepted-AOC | L1 | Accepted-AOC - | |
| 2 | L2₹33.1 L+₹21,658.35 (0.66%)Rejected-Finance FIRST FLOOR 360 1 GREEN CITY KONDARASAMPALAYAM CHITHRAVUTHANPALAYAM DHARAPURAM TK TIRUPPUR 638657 | TIRUPPUR | TAMIL NADU | 638657 | L2 | Rejected-Finance High Rate |
Tender Value
₹39.5 L
EMD Value
₹79,000
Closing Date
14 Feb 2024, 3:00 pmClosed
Executive Officer, Mulanur Town Panchayat
Mulanur Town Panchayat office Mulanur
CONSTRUCTION OF STORM WATER DRAIN WITH COVER SLAB at WARD NO. 06, SUBALAKSHMI MAHAL TO KARUR-DHARAPURAM MAIN ROAD IN MULANUR TOWN PANCHAYAT
2024_DTP_421674_1
515/2023
Open Tender
Civil Works - Others
Works
180 days
Mulanur Town Panchayat
As per tender norms
2 documents required · 2 mandatory
₹0
₹79,000
Mulanur Town Panchayat office
2 Mar 2024
9 Feb 2024
14 Feb 2024
9 Feb 2024
14 Feb 2024
9 Feb 2024
9 Feb 2024 - 14 Feb 2024
12 Feb 2024
Amount
Earth work excavation for foundation in all kinds of soils depositing on bank with initial lead and lift of 10 m 2m except sand or loose soil hard stiff clay, stiff block cottan soil and hard gravelly soil, SS20B
CC (1:4:8) mix using 40 mm ISS HBG Jelly including cost & conveyance of all material to site and all labours charges etc complete.
Centering for soffits of reinforced cement concrete slab on plan surfaces including cost & conveyance of all materials to site and all labours charges etc complete.
Plain cement concrete 1:2:4 mix Using 20 mm HBGs jelly to the required thickness camper and gradient including centering and providing expansion joints with filler materials ramming, finishing the surface smooth and rough with float and brooming including curing the concrete for 24 hours immediately by covering with burlop and moistry the surface
Supplying and Fabricaton of TMT rods including cost of cutting,bending and tying with cost of binding wire including cost and conveyance of all materials and labours charges etc., complete as per standard specification
RCC 1:1.5:3 (One part of cmeent , one and half part of sand and three part of metal) - mix using 20mm ISS HBG Metal including cost and conveyance of all materials and labour charges etc., as per standard specification.
Providing Grono floorfinish 1:2:4 mix 25mm thick using 6-10mm Chips ISS HBG Metal including cost and conveyance of all materials and labour charges etc., as per standard specification.
SRI SAKTHIVEL AND CO
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .