Loading…
Loading…
Tender Value
₹8.9 Cr
EMD Value
₹17.8 L
Closing Date
9 Jul 2026, 6:30 pmDue tomorrow
Executive Engineer
Executive Engineer, Kalpa Division, HPPWD Kalpa, Kinnaur HP
Extension of Stadium at Kalpa in District Kinnaur (HP) (SH -C/O Ceiling beam and slab
2026_PWD_138044_1
PW/KNR-E-Tender/26-2228-40 dated 30-06-2026
Open Tender
Civil Works
365 days
Kalpa, Kinnaur HP
Please refer Tender documents.
9 documents required · 9 mandatory
₹10,000
₹17.8 L
3 Jul 2026
3 Jul 2026
10 Jul 2026
3 Jul 2026
9 Jul 2026
3 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Centering and shuttering including strutting, propping etc. and removal of form work complete upto all floor level including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | |||||
| 1.01 | Suspended floors, roofs, landings, balconies and access platform | 4,563.49 | Per Square meter | 792.5 | ₹36,16,565.82 |
| 1.02 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 2,079.99 | Per Square meter | 626.6 | ₹13,03,321.73 |
| 2 | Providing and laying in position Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases, up to all floor level, excluding the cost of centering, shuttering, finishing and reinforcement, with Design Mix M-30 (M-Thirty), including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 2,800.58 | Per Cubic meter | 11,948.65 | ₹3,34,63,150.22 |
| 3 | Steel reinforcement (TATA /SAIL / JINDAL PANTHER/RINL) for R.C.C. (Reinforcement cement concrete) work including straightening, cutting, bending, placing in position and binding complete including cost of binding wire plinth level upto floor all level Thermo-Mechanically Treated bars of grade Fe-550D (Five hundred fifty D) or more steel bars complete upto all floor level, including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 4,64,906.57 | Per Kilogram | 108.85 | ₹5,06,05,080.14 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
GCC.pdf
Tender Documents • 5.19 MB
BOQ_204422.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid