Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.2 LAccepted-Finance | ₹16.2 L | L1 | Accepted-Finance Being L1 |
| 2 | L2₹17.2 L+₹99,975 (6.19%)Accepted-Finance 43 6 VIDYA NAGAR HUT BAY 744207 | SOUTH ANDAMANS | ANDAMAN AND NICOBAR ISLANDS | 744207 | ₹17.2 L+₹99,975 (6.19%) | L2 | Accepted-Finance Being L2 due to high rate |
| Sl No | Description | Qty | Unit | Charming Construction L2 | KVB CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Cutting and removing grass and removal of the rubbish upto a distance of 50m outside the periphery of the area cleared and including cost of all labour charges, minor tools and GST and Labour Cess etc., Complete. | 43,900 | Sqm | 7.2 ₹3,16,080 | 4 ₹1,75,600 Lowest |
| 2.00 | Dismantling the damaged concrete portion of richer mix including removing/ disposal of the dismantled materials, chipping and clearing the surface the surface to receive to receive the new concrete including cost of all minor tools and labour cess, GST etc., complete. | 5 | Cum | 2,780 ₹13,900 | 2,500 ₹12,500 Lowest |
| 3.00 | Providing and laying R.C.C 1:1.5:3 mix 20mm size stone chips (one cement one and half mainland river sand, & three mainland stone chips of size 2cm graded) in all RCC works as directed by the EIC, including cost of cement, mainland stone chips and mainland river sand, screening and washing of both the aggregates, mixing concrete, conveying the concrete, placing in position, consolidation with vibrator curing but excluding cost of fabrication charges of steel reinforcement, including all labour charges, transportation charges of all materials to work site, cost of minor tools, hire charges of mixer machine and vibrator, GST & Labour cess etc complete. | 5 | Cum | 26,350 ₹1,31,750 | 24,995 ₹1,24,975 Lowest |
| 4.00 | Providing and fixing Tor steel reinforcement for concrete work including cost of tor steel of grade FE 500, cutting, bending, binding, and placing in position cost of binding wire, minor tools all labour charges, GST & labour cess etc complete . | 2.5 | Qtl | 10,800 ₹27,000 Lowest | 13,990 ₹34,975 |
| 5.00 | Providing watch and ward for Break water complex, work site area round the clock, as and when required as per the instruction of EIC including cost of all labour charges, cost of torch lights, cells, GST & Labour cess etc., complete. | 1,095 | Nos. | 890 ₹9,74,550 Lowest | 945 ₹10,34,775 |
| 6.00 | Conveying tetrapods from the casting yard to break water and placing to strengthen the section of break water as per the instruction and direction of the Engineer in Charge including hire charge of truck, cost of slings, loading, conveying, unloading, placing in postion, cost of slings, GST & labour cess but excluding hire charges of crane for placing the tetrapods in position, etc., complete. | 50 | Nos. | 2,300 ₹1,15,000 Lowest | 2,500 ₹1,25,000 |
| 7.00 | Painting two coats of approved ready mixed synthetic enamel black and yellow paint in strips on the kerb of approach trestle and old steel structure, etc. after cleaning the surface including cost of paint brushes, transportation cost of all materials to work site all labour charges and minor tools, GST and labour welfare cess etc complete. | 720 | Sqm | 190 ₹1,36,800 | 149 ₹1,07,280 Lowest |
Tender Value
₹17.7 L
EMD Value
₹35,375
Closing Date
9 Apr 2026, 3:00 pmClosed
Executive Engineer(KandGN), ALHW, Campbell Bay
O/o The DCE(N), ALHW, Campbell Bay
Routine maintenance of Breakwater and other allied structure at Breakwater complex at Campbell Bay for period of one year 2026-27
2026_ALHW_904184_1
ALHW/EEC/CB/DB/TEND-38/2025-26
Open Tender
Miscellaneous Works
Item Rate
365 days
Campbell Bay
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹35,375
5 May 2026
1 Apr 2026
10 Apr 2026
1 Apr 2026
9 Apr 2026
1 Apr 2026
1 Apr 2026 - 4 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting and removing grass and removal of the rubbish upto a distance of 50m outside the periphery of the area cleared and including cost of all labour charges, minor tools and GST and Labour Cess etc., Complete. | - | Sqm | - | - |
| 2 | Dismantling the damaged concrete portion of richer mix including removing/ disposal of the dismantled materials, chipping and clearing the surface the surface to receive to receive the new concrete including cost of all minor tools and labour cess, GST etc., complete. | - | Cum | - | - |
| 3 | Providing and laying R.C.C 1:1.5:3 mix 20mm size stone chips (one cement one and half mainland river sand, & three mainland stone chips of size 2cm graded) in all RCC works as directed by the EIC, including cost of cement, mainland stone chips and mainland river sand, screening and washing of both the aggregates, mixing concrete, conveying the concrete, placing in position, consolidation with vibrator curing but excluding cost of fabrication charges of steel reinforcement, including all labour charges, transportation charges of all materials to work site, cost of minor tools, hire charges of mixer machine and vibrator, GST & Labour cess etc complete. | - | Cum | - | - |
| 4 | Providing and fixing Tor steel reinforcement for concrete work including cost of tor steel of grade FE 500, cutting, bending, binding, and placing in position cost of binding wire, minor tools all labour charges, GST & labour cess etc complete . | - | Qtl | - | - |
| 5 | Providing watch and ward for Break water complex, work site area round the clock, as and when required as per the instruction of EIC including cost of all labour charges, cost of torch lights, cells, GST & Labour cess etc., complete. | - | Nos. | - | - |
| 6 | Conveying tetrapods from the casting yard to break water and placing to strengthen the section of break water as per the instruction and direction of the Engineer in Charge including hire charge of truck, cost of slings, loading, conveying, unloading, placing in postion, cost of slings, GST & labour cess but excluding hire charges of crane for placing the tetrapods in position, etc., complete. | - | Nos. | - | - |
| 7 | Painting two coats of approved ready mixed synthetic enamel black and yellow paint in strips on the kerb of approach trestle and old steel structure, etc. after cleaning the surface including cost of paint brushes, transportation cost of all materials to work site all labour charges and minor tools, GST and labour welfare cess etc complete. | - | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.37 MB
BOQ_950376.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .