| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.3 LAccepted-Finance UTTAR PRADESH UP | BASTI | UTTAR PRADESH | 271305 | ₹19.3 L | L1 | Accepted-Finance L1 |
| 2 | L2₹19.3 L+₹2,898.20 (0.15%)Accepted-Finance BILRAM GATE KASGANJ | KASGANJ | KASGANJ | UTTAR PRADESH | ₹19.3 L+₹2,898.20 (0.15%) | L2 | Accepted-Finance L2 |
| 3 | L3₹19.5 L+₹20,287.38 (1.05%)Accepted-Finance BILLRAM GATE KASGANJ | KASGANJ | UTTAR PRADESH | 207123 | ₹19.5 L+₹20,287.38 (1.05%) | L3 | Accepted-Finance L3 |
Tender Value
₹19.3 L
EMD Value
₹19.3 L
Closing Date
10 Aug 2026, 2:00 pmClosed
Dy. Director (Construction)
Mandi Parishad Aligarh
Repair of Link Road from Bachhmai to Beenpur via Moti nagla.
2026_RKUMP_1173022_1
424-1/18.07.2026
Open Tender
Civil Works - Roads
Percentage
120 days
Kasganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,400
DY. Director (Const.) Mandi Parishad
₹19.3 L
Yes
21 Aug 2026
28 Jul 2026
10 Aug 2026
28 Jul 2026
10 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part-A Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregates, watering and compacting to the required density grading 3 as per Technical Clause 405(4.8-3) Part-B | 60 | M3 | 4,530 | ₹2,71,800 |
| 2 | CEMENT CONCRETE PAVEMENT (C.C ROAD) construction of un-reinforced plain cement concrete pavement thickness as per design, over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M 30 (grade) (1:1.5:3) coarse and fine aggregates conforming to IS 383 maximun size of coarse aggregate not exceeding 25mm mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed side from work (steel channel laying and fixing of 125 micron thick plastic sheet, wedges steel plates including levelling the form work as per drawing) spreading the concrete with shovels, rakes compacted using needle, screed and plate vibrators and finished in continuous opration including provision of contraction and expansion construction joints applying debonding strips primer, sealant admixtures as approved curing concrete slabs for 14 days, curing compound (where specified) and water finishing to lines and grade as per drawing and technical specification (approved Quarri grit) Part B | 180 | M3 | 8,000 | ₹14,40,000 |
| 3 | Excavating, supplying and filling of local earth by mechanical transport upto a lead upto 5Km also including ramming and watering of the earth in layers not exceeding 20 cm in trenchs, plinth, of foundation etc. complete Part | 357 | M3 | 258 | ₹92,106 |
| 4 | Excavation in foundation in ordinary soil (Loam, Clay or Sand) Including lift upto 1.50 m & lead upto 30m & including filling watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or into the plinth & removal & disposal of surplus earth as directed by the Engineer In-charge upto a distance of 30m from the foundation trenches. (SI 251) | 8.86 | M3 | 150 | ₹1,329 |
| 5 | Providing & laying cement concrete in 1:6:12 (1 cement : 6 coarse sand : 12 graded stone ballast 40mm nominal size) & curing complete, including cost of form work. In Foundation & floors. (SI 273) A | 2.98 | M3 | 4,600 | ₹13,708 |
| 6 | Class-150 brick work in 1:4 cement & Coarse sand of 2.25 fineness modulus mortar in foundation & plinth including supply of all material, labour & T&P etc. required for proper completion of the work. | 5.72 | M3 | 5,700 | ₹32,604 |
| 7 | Struck pointing in 1:2 cement and fine sand including supply of all materials labour and T&P etc. required for proper completion of work. | 17.98 | SQM | 180 | ₹3,236.4 |
| 8 | Supply of 350MM dia R.C.C. Hume pipe including supply of all materials labour and T&P etc. required for proper completion of work. | 15 | RM | 1,900 | ₹28,500 |
| 9 | Laying & fixing of 350MM dia R.C.C. Hume pipe including supply of all materials labour and T&P etc. required for proper completion of work. | 15 | RM | 250 | ₹3,750 |
| 10 | Maintainance of First Year (@0.00% of Total Work Amount of Part B | 18,03,906 | Job | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.50 MB
BOQ_2202803.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .