Loading…
Loading…
Tender Value
₹3.8 L
EMD Value
₹7,592
Closing Date
3 Oct 2026, 6:00 pm5d left
Office of the Pradhan, Takdah G.P.
Office of the Pradhan, Takdah G.P., Takdah Cantonment.
Drinking Water Scheme at Upper Hum Busty, Sansad No II, AC 111284266
2026_GTA_5075500_3
01/TGP/15thFC/2026-27
Open Tender
CIVIL WORKS
Percentage
45 days
Upper Humbusty
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹7,592
25 Sept 2026
25 Sept 2026
6 Oct 2026
26 Sept 2026
3 Oct 2026
26 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: | 3.46 | Cum | 260.3 | ₹900.64 |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 2.08 | Cum | 196 | ₹406.9 |
| 3 | 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.44 | Cum | 7,178.75 | ₹3,158.65 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | 2.64 | Cum | 9,045.75 | ₹23,880.78 |
| 5 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement. | 1.94 | Cum | 10,852.95 | ₹21,054.72 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircase and spiral staircase above plinth level upto floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement :1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 0.4 | Cum | 11,505.5 | ₹4,602.2 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for. (a) Walls (any thickness) including attached pilasters, butteressess, plinth and string courses etc) | 29.7 | Sqm | 842.5 | ₹25,022.25 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for (b) Suspended floors, roofs, landings, balconies and access platform) | 4.41 | Sqm | 927.25 | ₹4,089.17 |
| 9 | Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. | 508.21 | kg | 107.85 | ₹54,810.45 |
| 10 | CEMENT PLASTER (IN FINE SAND) : 12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand) | 35.49 | Sqm | 347.05 | ₹12,316.8 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
BOQ_5165718.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .