| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹51.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹51.6 L+₹53,480.90 (1.05%)Rejected-Finance KHANPUR CHOWK PATHANKOT PUNJAB | L2 | Rejected-Finance L2 | |
| 3 | L3₹52.9 L+₹1.8 L (3.60%)Rejected-Finance | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | V.S. Saini L1 | Dhotra Construction Company L2 | Bhupinder Singh Contractors L3 |
|---|---|---|---|---|---|---|
| 1.00 | Compacting original ground below road crust Loosening, leveling and compacting original ground up to a level of 500mm below road crust, Mixed with water at OMC, levelled, graded and compacted in layers by rolling so as to achieve minimum dry density as given in Table 300-2 for sub grade construction as per technical clause 305 of MORT&H specifications. | 198 | Cum | 60 ₹11,880 Lowest | 71 ₹14,058 | 72 ₹14,256 |
| 2.00 | Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and leads. | 1,249.27 | Cum | 30 ₹37,478.1 Lowest | 39 ₹48,721.53 | 33 ₹41,225.91 |
| 3.00 | Earth work containing Gravel (in loose from in non cohesive binding material) work in excavation with occasional use of picks exclusive of compensation of earth undressed icluding all lifts and leads with percentage of gravel or Kankar. Exceeding 40 % but upto 60 %. | 25.65 | Cum | 190 ₹4,873.5 | 191 ₹4,899.15 | 175 ₹4,488.75 Lowest |
| 4.00 | Cement concrete 1:4:8 with stone ballast 20mm gauge mixing by mechanical means using concrete mixer volumetric type. | 6.29 | Cum | 3,820 ₹24,027.8 Lowest | 5,780 ₹36,356.2 | 4,000 ₹25,160 |
| 5.00 | Cement concrete 1:3:6 mixing by mechanical means using concrete mixer volumetric type | 34.21 | Cum | 4,120 ₹1,40,945.2 Lowest | 6,128 ₹2,09,638.88 | 4,450 ₹1,52,234.5 |
| 6.00 | Cold twisted deFormed (Ribbed/ Tor steel) Bars (Fe 500 grade as per IS 1786-2008) , for R.C.C works, where not including in the complete rate of RCC including bending and binding placing in position complete. | 8.25 | Qtl | 7,890 ₹65,092.5 | 9,500 ₹78,375 | 7,500 ₹61,875 Lowest |
| 7.00 | Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth. | 14.45 | Cum | 5,575 ₹80,558.75 | 7,456 ₹1,07,739.2 | 5,500 ₹79,475 Lowest |
| 8.00 | Weaving wire netting for wire crates including binding sides and partitions to make crate of 15 cm x 15 cm or 25 cm x 7.5 cm mesh to the satisfaction of Engineer in charge. | 3,325.6 | Sqm | 190 ₹6,31,864 Lowest | 246 ₹8,18,097.6 | 190 ₹6,31,864 Lowest |
| 9.00 | Random rubble masonry built to courses in foundations and plinth in cement mortar 1:6 | 117.33 | Cum | 4,895 ₹5,74,330.35 | 5,000 ₹5,86,650 | 4,800 ₹5,63,184 Lowest |
| 10.00 | Filling Boulder stones into crates and hand packing. | 528 | Cum | 1,340 ₹7,07,520 Lowest | 2,471 ₹13,04,688 | 1,430 ₹7,55,040 |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
29 Dec 2025, 9:00 amClosed
Xen RSD Civil Maintenance Division
XEN Civil Maintenance Division Shahpurkandi Township
Estimate for Providing protection work Gabion Wall and for Changing the alignment of the road at around RD 12000 of the project road.
2025_WR_155362_1
113/2025
Open Tender
Civil Works
Item Rate
150 days
Ranjit Sagar Dam Shahpurkandi Township
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
₹1.1 L
25 Feb 2026
10 Dec 2025
29 Dec 2025
11 Dec 2025
29 Dec 2025
11 Dec 2025
Compacting original ground below road crust Loosening, leveling and compacting original ground up to a level of 500mm below road crust, Mixed with water at OMC, levelled, graded and compacted in layers by rolling so as to achieve minimum dry density as given in Table 300-2 for sub grade construction as per technical clause 305 of MORT&H specifications.
Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and leads.
Cement concrete 1:4:8 with stone ballast 20mm gauge mixing by mechanical means using concrete mixer volumetric type.
Weaving wire netting for wire crates including binding sides and partitions to make crate of 15 cm x 15 cm or 25 cm x 7.5 cm mesh to the satisfaction of Engineer in charge.
Providing and laying of Filter media of size 5-10mm with small boulder/stone at upstream side of retaining wall laid down as per clause 7 of IS 14458 part 5,provided over the entire surface behind the wall complete in all respect and the full height compacted to a firm condition complete as per drawing and Technical Specification.
Providing and laying of Filter media of size 2-4mm with small boulder/stone at upstream side of retaining wall laid down as per clause 7 of IS 14458 part 5,provided over the entire surface behind the wall complete in all respect and the full height compacted to a firm condition complete as per drawing and Technical Specification.
Geotextile Membrane upstream side of filter media laid down as per clause 7 of IS 14458 part 5,provided over the entire surface behind the wall complete in all respect
Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density complete as per technical clause 406 of MORT&H specifications.
Providing and laying semi dense bituminous concrete 30mm thick with batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 5%, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per IRC-111 (2009) Specifications.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.39 MB
Drawings.pdf
Additional Documents • 1.69 MB
BOQ_315282.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .