Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.1 LAccepted-AOC GLENBURN T E P O SINGRIMTAM | ₹40.1 L | L1 | Accepted-AOC quoted lowest |
| 2 | L2₹40.5 LRejected-AOC | ₹40.5 L | L2 | Rejected-AOC quotred higher |
| 3 | L3₹41.3 LRejected-AOC | ₹41.3 L | L3 | Rejected-AOC quoted higher |
Tender Value
₹40.1 L
EMD Value
₹80,268
Closing Date
16 Feb 2026, 6:55 pmClosed
Executive Engineer TED
OFFICE OF THE EXECUTIVE ENGINEER TAKDAH ENGINEERING DIVISION 6TH MILE NAYA BUSTY, DARJEELING
Construction of Play Ground at Glenburn T.E. .under R.R. Block, GTA.
2026_GTA_998254_6
GTA/EE/TED/NIeT-16(1st Call)/e-Tender/2025-26
Open Tender
CIVIL WORKS
Percentage
180 days
Takdah
AS PER NIeT
5 documents required · 5 mandatory
₹0
₹80,268
Yes
2 Jul 2026
3 Feb 2026
19 Feb 2026
3 Feb 2026
16 Feb 2026
3 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for Structures Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, removing, spreading or stacking of spoils within a lead of 150 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge I. In all sorts of soil excluding marshy soil & rocks (soft or hard) by manual means.a) upto 3 m depth(iv) Without pumping out water and shoring | 18.48 | cum | 114 | ₹2,106.72 |
| 2 | Plum concrete work with 40 % cement concrete with 30 mm down graded stone metal and 60 % stone boulder of size 150 mm and above, placed in position as directed excluding shuttering if any.
(i) (1:3:6) proportion | 1 | cum | 3,964.8 | ₹3,960.84 |
| 3 | Hire and labour charges for Shuttering with or without staging upto 4.0 m height using approved stout props with wooden planks/ply wood/steel sheet plate with required bracing for any kind of plain or reinforced concrete works in all sorts of minor structure including culvert, box culvert, crossdrain etc. The rate is inclusive of fitting, fixing and striking out after completion of work as per specification and direction. b) For portion of Ht above 1m and upto 3m | - | Sqm | 214 | - |
| 4 | Providing weep hole (150X75MM) in walls including packing brick bats or boulder of approved quality and size at the backsides of walls etc all complete. | 83 | each | 117 | ₹9,711 |
| 5 | Filling properly the empty sausage crates with boulders of any size & shape with hand packing after preparation of bed of placement, placing the crate in position, carriage of boulders from road stacks with a lead upto 150m etc. complete in all respect including stitching the rest of the crate with wire (passage for filling boulders) after filling up the crate with boulders and launching the crate in position if necessary and as directed by the Engineer-in charge.
[Rate provided is exclusive of the cost of stone
boulders and sausage crate] | 57.6 | cum | 2,765.62 | ₹1,59,299.71 |
| 6 | Earth in filling in foundation trenches and at the back of abutments with good earth (sandy soil) in layers not exceeding 15 cm. including watering and ramming layer by layer complete with earth obtained by fresh excavation from land arranged by Department beyond 150 m. but within 300 m. including all lifts. Earth to be approved by the Engineer-in-charge. | - | cum | 161 | - |
| 7 | Providing and laying Design Mix concrete for plain /reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works.(a) M-15 Grade | - | cum | 5,399.61 | - |
| 8 | Dry Box Type Drain Earthwork in excavation for foundation of structures as per technical specification including setting out removing spreading or stacking spoils with in a lead of 150 m as directed and including trimming the sides of trenches ..all complete as per direction of E-I-C. | 57 | Sqm | 114 | ₹6,498 |
| 9 | Handpacked rough dressed stone work with boulders including all costs complete. | 17.1 | cum | 2,452.8 | ₹41,942.88 |
| 10 | Providing and laying Design Mix concrete for plain /reinforced concrete work in any part of bridge (excluding bottom plugging) with coarse aggregates of appropriate nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of approved quality and cement, as necessary, including labour, cost and carriage of all materials and including preparation of design mix, approval of the same by the Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete but excluding cost of labour and materials for formwork & reinforcement works.(a) M-15 Grade | 1 | cum | 5,399.61 | ₹5,394.21 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.17 MB
BOQ_2444801.xls
BOQ • 0.29 MB
TenderForm6.pdf
Tender Documents • 0.94 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].