Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 LAccepted-AOC | L1 | Accepted-AOC TC Recommendation | |
| 2 | L2₹5.6 LSame as L1Rejected-Finance KHOITADIH PROJECT BILPAHARI BARDHAMAN BARDHAMAN 713378 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713378 | L2 | Rejected-Finance TC Recommendation | |
| 3 | L3₹5.7 L+₹13,261.88 (2.38%)Rejected-Finance DVC MORE PANDAVESWAR DALURBANDH PANDAVESWAR 713346 WEST BENGAL INDIA | PANDAVESWAR | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | L3 | Rejected-Finance TC Recommendation |
Tender Value
₹5.6 L
EMD Value
₹7,000
Closing Date
23 Jan 2025, 6:00 pmClosed
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Installation of haulage in RVIIB seam and replacement of power cable behind load centre at Nakrakonda Kumardihi B Colliery
2025_ECL_325660_1
ECL/GM/BA/E TENDER/24-25/ENM/356 Dt 13.01.2025
Open Tender
Electrical and Maintenance Works
Item Rate
25 days
Nakrakonda Kumardihi B Colliery
Please refer to NIT document
4 documents required · 4 mandatory
₹7,000
1 Apr 2025
13 Jan 2025
24 Jan 2025
13 Jan 2025
23 Jan 2025
13 Jan 2025
13 Jan 2025 - 17 Jan 2025
Amount
Item Description/ Heading
Dismantling of Voldrum make Haulage installed in drift bottom of driftfrom RVIIB to RVIIC seam.
Transporting of haulage drum, motor, bed plate, starter, controlling switch,LS switch, connecting cables etc from RVIIC seam to RVIIB through incline no 2
Complete installation of Haulage and lowering and fitting of haulage rope (transportation from surface, 180m)
Dismantling of Voldrum make Haulage installed in drift bottom of drift from RVIIB to RVIIC seam.
Transporting of haulage drum, motor, bed plate, starter, controlling switch,LS switch, connecting cables etc from RVIIC seam to RVIIB through incline no 2
Complete Installation of Haulage and lowering and fitting of haulage rope (transportation from surface 230m)
Unreeling and transporting of 150sq. mm. PVCDWA power cable from surface via incline no.2 to RVIIB seam in LHCM-1 District.
Laying of new cable and dismantling of damaged cable behind load centre for electrical safety
Transporting of damaged cable to surface from LHCM- 1 working district to surface
Loading for transporting of Winding rope from central Work store.
Unreeling and Laying of winding rope at pit top before installation.
Adjustment of south side and north side rope from Inside of winding engine's drum as per readily elongation.
Total impact of GST for the purpose of CTC
BABLU SINHA (BID ID -1117584)
NANDI ENTERPRISE (BID ID -1117585)
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .