Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance BARDHAMAN WEST BENGAL 713343 INDIA UDYAM WB 23 0014625 19AKCPS8801R1ZB R M MII STATUS AS VERIFIED | PASCHIM BARDHAMAN | WEST BENGAL | 713343 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance 64N COLLEGE ROAD KULTI BARDHAMAN WEST BENGAL 713343 | PASCHIM BARDHAMAN | WEST BENGAL | 713343 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.9 L
EMD Value
₹6,200
Closing Date
21 Mar 2025, 9:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Area Engineer(EnM)
Area Engineer(EnM), Sodepur Area
Repairing/Rewinding of 150 KVA, 3.3 KV/550V, Crompton Parkinson make Power Transformer, SI no -1844 of Ranipur Colliery (Filter Plant) under Parbelia Group of Mines used for domestic water supply (b) Repairing/Rewinding of 250 KVA, 3.3 KV/550V, GEC m
2025_ECL_332211_1
ECL/SDPA/AE(EnM)/e/24-25/1085 Date.06.03.2025
Open Tender
Miscellaneous Works
Item Rate
10 days
Sodepur Area
Please refer Tender documents.
5 documents required · 5 mandatory
₹6,200
22 Mar 2025
12 Mar 2025
22 Mar 2025
12 Mar 2025
21 Mar 2025
12 Mar 2025
12 Mar 2025 - 15 Mar 2025
Amount
Items Description
Repairing/Rewinding of 150 KVA, 3.3 KV/550V, Crompton Parkinson make Power Transformer, SI no -1844 of Ranipur Colliery (Filter Plant) under Parbelia Group of Mines used for domestic water supply
Removing of Top caver, Inspection cover, conservator, top cores and dismantling burnt winding colls and carbonized core.
Dismantling of core structure, cleaning and de-carbonzing of core structure dry out and re-assembling of core.
Cost new copper conductor -78Kg
Cost of insulating materials for TPC for both Primary & Secondary coll
Decarburizing & Cleaning of old balanced existing copper conductor for secondary side 3 LImb
Wooden forma for making Primary & Secondary coils.
Insulating materials (Prespun board, leather paper, tapes and varnish etc.)
Pressure lock chip for coil locking
Reformation of Primary & Secondary coll as per sample
De-carbonizing, cleaning of top core, channel, tank cooling tubes etc.
Re-assembling of both reformed Primary and Secondary coils, top core setting, channel fixing, oil duct, making connections etc.
Cost of brazing rod EUTEC 1405 for Primary and Secondary colls.
Cost of neoprene synthetic gasket for top cover, inspection cover & Insulators.
Painting of transformer
Filtration of Transformer oil
Labour Cost / Heating, baking of Transformer at Heat chamber then box up and internal Primary & Secondary connections.
Less Scrap value -78
Overhead cost & others @10%
Add Transporting Cost up & down.
Add CMPE/EPF
Add: Bonus 8.33%
Add: Pension @ 7%
Repairing/Rewinding of 250 KVA, 3.3 KV/550V, GEC make power Transformer of Ranipur Colliery (River Side) under Parbelia Group of Mines used for domestic water supply
Removing of Top cover, Inspection cover, conservator, top cores and dismantling burnt winding coils and carbonized core.
Dismantling of core structure, cleaning and de-carbonizing of core structure dry out and re-assembling of core.
Cost new copper conductor -88Kg
Cost of Insulating materials for TPC for both Primary & Secondary coil
Decarbonizing & Cleaning of old balanced existing copper conductor for secondary side 3 limpb
Wooden forma for making Primary & Secondary colls.
Insulating materials (Prespun board, leather paper, tapes and varnish
Pressure lock chip for coil
Reformation of Primary & Secondary coll as per sample
De-carbonizing. cleaning.of top core, channel, tank cooling tubes etc.
Re-assembling of both reformed Primary and Secondary colls, top core setting, channel Axing, oll duct, making connections etc.
Cost of brazing rod EUTEC 1405 for Primary and Secondary colls.
Cost of neoprene synthetic gasket for top cover, inspection cover & Insulators.
Painting of transformer
Filtration of Transformer oil
Labour Cost / Heating, baking of Transformer at Heat chamber then box up and internal Primary & Secondary connections.
Less Scrap value -88Kg
Overhead cost & others @10%
Add Transporting Cost up & down.
CMPF/EPF , Bonus & Pension (12% + 8.33%+7%)=27.33% on labour charges.
Repairing of 315 KVA, 3.3 KV/550 Volt, A/Y make, TSU, Air Cooled Transformer of dewatering/pumping of mine water at west section of Parbelia Colliery under Sodepur Area.
Removing of top cover and taken out core and winding.
Dismantling of core & winding after de-brazing of Primary & Secondary connection and removing the colls the core, deaning, de-carbonizing, dry out and varnishing.
Cost new copper-105Kg
Cleaning and decarburizing of old balance exiting copper strip
Re-insulating of Primary & Secondary copper strip by D.G.C. and F-50 varnish
Reformation of Disc coil Pri & Sec
Glass fiber separator In between every layer of Primary and secondary coils
Varnishing, Heating and baking of Transformer.
Providing Molded Bush Insulator for Primary & Secondary side
Body bolt and nuts, washer, etc. changing.
Labour charges / Assembling (Fixing of Primary & Secondary colls in the core structure, fixing of core channel, making of primary & secondary
Less Scrap value -105Kg
Overhead cost & others @10%
CMPF/EPF , Bonus & Pension (12% + 8.33%+7%)=27.33% on labour charges.
Add Transporting Cost up & down.
Total impact of GST for the purpose of CTC
S.M. TRADERS (BID ID -1142782)
moon light (BID ID -1143404)
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .