Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1ST₹21.2 LAccepted-AOC | 1ST | Accepted-AOC successful | |
| 2 | Rejected-Technical AT CENTRAL LINE PO PS BURLA DIST SAMBALPUR ODISHA | BURLA | SAMBALPUR | ODISHA | 768017 | - | Rejected-Technical UNSUCCESSFUL | |
| 3 | Rejected-Technical | - | Rejected-Technical UNSUCCESSFUL | |
| 4 | Rejected-Technical | - | Rejected-Technical UNSUCCESSFUL | |
| 5 | Rejected-Technical | - | Rejected-Technical UNSUCCESSFUL |
Tender Value
₹21.2 L
EMD Value
₹21,162
Closing Date
18 May 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
COMMISSIONER, SMC
SAMBALPUR MUNICIPAL CORPORATION, DURGAPALI, SAMBALPUR, 768006
Construction of Approach Road and Water Facility for Cow Shed near Gosala, Ward No.-02
2026_ORULB_128869_1
10/SMC_SBP/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
SAMBALPUR MUNICIPAL CORPORATION
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹21,162
Yes
15 Jul 2026
8 May 2026
19 May 2026
8 May 2026
18 May 2026
8 May 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Excavation of foundation in hard soil within initial lead & lift including leveling the bed & depositing the soil away working area etc completed as direction of Engineer. | 216.6 | cum | 230.7 | ₹49,969.62 |
| 2 | Supply fillimg sand in F & P including cost, conveyance & royalty od sand cost of all labour cess, Watering, raming etc | 9.6 | cum | 826.11 | ₹7,930.66 |
| 3 | Cement Concrete (1:3:6) using 4cm size B.H.G. (C. B.) Metal including cost, conveyance , royalty & taxes of all materials etc. complete | 98.15 | cum | 5,794.7 | ₹5,68,749.81 |
| 4 | Cement Concrete (1:2:4) using 12mm size B.H.G. (C. B.) Chips including cost, conveyance , royalty & taxes of all materials etc. complete | 26.95 | cum | 7,443.5 | ₹2,00,602.32 |
| 5 | Rigid & smooth centering & shuttering for C.C.works including dismantling for reuse after casting etc. complete. | 269.5 | SQM | 248.7 | ₹67,024.65 |
| 6 | Providing, spreading Quarry Rubbish in Sub-Base in layers not exceeding 22.5cm. including watering ,compacting to the required density in O.M.C. with rolling by Vibratory Roller as per O.P.W.D. specifications including cost, conveyance & royalty of all materials,cost of all labour, T & P, labour cess, watering, turfedging, hire & running charges of Vibratory Roller etc. complete. | 88.6 | cum | 1,408.71 | ₹1,24,811.71 |
| 7 | Providing, and laying 80mm thick factory made cement concrete interlocking paver block of m-40 grade made by block making machine with strong vibratory compaction of approved size design and shape laid in requiered colour and patytern over and including 50 mm thick compacted bed of coarse sand filling the joint with fine sand etc all complete as per the direction of engineer incharge. | 885.5 | SQM | 608.4 | ₹5,38,738.2 |
| 8 | Labou for diling a perfectly vertical bore hole of specified dia for a specified depth below+B22 ground level through
consolidated and unconsolidated rock with down the hole hammer drılling rigs or combination drilling rigs (1200 cfm/ 300 psi) as required to suit the site condition as per the direction of Engineer- in-charge including use of own
rigs with its accessories, tools and plant and onsumables etc for lowering of 200 mm dia PVC/GI pipes for housing fitted with socket and with or without well screen as per the necessity for soft. medium, hard and boulder formation (GI/PVC casing pipes if required to prevent
Collapse of over burden is to be provided by the contractor and including lowering withdrawing after completion of the tube well) | 300 | MTR | 865.4 | ₹2,59,620 |
| 9 | Drilling of 200mm dia bore
O mtr to 300 mtr.
2 Lowering the following size of GI/PVC/MS housing pipes with or without slotted pipes as per the necessity from ground level up to 45.Om depth and fitted ad fixed
up in perfectly vertical p osition including cutting and threading of pipes and slotted pipes and supplying and fixing all jinting maternals, tools and plant etc. all complete ad keeping the top of casing pipe threading includıng LowERING of 200 mm da PVC casno ppes (Sch- 80)
0 mtr to 45 mtr | 45 | MTR | 208.9 | ₹9,400.5 |
| 10 | Cost of materials b Cost of 200mm PVC plastic Pipes Schedule -80 as per ASTM -D-1785/2004 | 45 | SQM | 1,577.84 | ₹71,002.8 |
stage.html
html • 0.08 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_589988.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_589988.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .