Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.8 LAccepted-Finance | ₹9.8 L | L1 | Accepted-Finance L1 |
| 2 | L2₹9.8 LRejected-Finance | ₹9.8 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | ARAVIND MUGESH L2 | MR.S.CHELLADURAI L1 |
|---|---|---|---|---|---|
| 1.00Construction of 3.00 m Span culvert at Kasitharmam Village and Panchayat in Kadayanallur Panchayat Union | |||||
| 2.00 | Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for foundation etc., complete. | 58.75 | Cum | 264 ₹15,510 | 263 ₹15,451.25 |
| 3.00 | Cement concrete 1:4:8 mix using 40m ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete. | 18.29 | cum | 5,485 ₹1.0 L | 5,484 ₹1.0 L |
| 4.00 | Centering charges for all concrete works including all cost and conveyance of all materials and all labour charges etc., complete. | 200.65 | sqm | 548 ₹1.1 L | 547 ₹1.1 L |
| 5.00 | Centering charges for all concrete works including all cost and conveyance of all materials and all labour charges etc., complete. | 26.16 | sqm | 1,096 ₹28,671.36 | 1,095 ₹28,645.20 |
| 6.00 | Cement concrete 1:3:6 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete. | 78.73 | cum | 5,755 ₹4.5 L | 5,754 ₹4.5 L |
| 7.00 | Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete. | 9.6 | cum | 9,098 ₹87,340.80 | 9,097 ₹87,331.20 |
| 8.00 | Supplying, Fabricating and placing in position of MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with standard specification. | 0.48 | MT | 92 ₹44.07 | 91.5 ₹43.83 |
| 9.00 | Cement concrete 1:2:4 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete. | 4.59 | cum | 6,778 ₹31,083.91 | 6,776.5 ₹31,077.03 |
| 10.00 | Refilling the basement with excavated earth other than Sand complying the Standard specification | 38.08 | cum | 46 ₹1,751.68 | 45.5 ₹1,732.64 |
Tender Value
₹10 L
EMD Value
₹25,000
Closing Date
5 Dec 2025, 4:00 pmClosed
BDO
BDO,KADAYANALLUR
Construction of 3.00 m Span culvert at Kasitharmam Village and Panchayat in Kadayanallur Panchayat Union, Tenkasi District under MLACDS 2024-25 (EST.AMT- 10.00L)
2025_RDTN_627053_1
BDOKNR/208/2025-A3
Open Tender
Civil Works
180 days
KADAYANALLUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹25,000
18 Feb 2026
28 Nov 2025
5 Dec 2025
28 Nov 2025
5 Dec 2025
28 Nov 2025
Amount
Construction of 3.00 m Span culvert at Kasitharmam Village and Panchayat in Kadayanallur Panchayat Union
Earth work excavation in all clauses of soil with initial lead and lift except hard rock requiring blasting as per SS 20B for foundation etc., complete.
Cement concrete 1:4:8 mix using 40m ISS HBG metal including cost and conveyance of all materials and all labour charges etc., complete.
Centering charges for all concrete works including all cost and conveyance of all materials and all labour charges etc., complete.
Centering charges for all concrete works including all cost and conveyance of all materials and all labour charges etc., complete.
Cement concrete 1:3:6 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete.
Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete.
Supplying, Fabricating and placing in position of MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with standard specification.
Cement concrete 1:2:4 mix using 20mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete.
Refilling the basement with excavated earth other than Sand complying the Standard specification
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
ARAVIND MUGESH (BID ID -1525481)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_749741.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
BOQ_749741.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid