Loading…
Loading…
Tender Value
₹48.2 L
EMD Value
₹96,420
Closing Date
2 Oct 2026, 2:00 pm5d left
Executive Engineer REW Leh
Office of the Executive Engineer REW Leh
Development of flower garden at choglamasr. (by way of chain-link fencing part II)
2026_RDD_19624_1
43- UTL REW Leh of 2026-27
Open Tender
Civil Works - Others
Percentage
30 days
Leh
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Payable To Executive engineer REW Leh
₹96,420
26 Sept 2026
26 Sept 2026
3 Oct 2026
26 Sept 2026
2 Oct 2026
26 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. | 95.64 | cum | - | - |
| - | Dry stone pitching (any thickness) including cost of stones.
On horizontal | 8.4 | cum | - | - |
| - | Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level :1:3:6 (1 cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 8.4 | cum | - | - |
| - | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level ::1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 25.47 | cum | - | - |
| - | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 2,295 | kgs | - | - |
| - | Centering and shuttering including strutting, propping etc. and removal of form for Lintel, beams, plinth beams, girders, bressumers and cantilevers. | 167.22 | sqm | - | - |
| - | Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4graded stone aggregate 20 mm nominal size derived from natural sources) | 82.9 | cum | - | - |
| - | 15mm Cement plaster on the rough side of single or half brick wall of mix:1 : 4 ( 1 cement : 4 fine sand) | 83.61 | sqm | - | - |
| - | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : 13.61.1 Two or more coats on new wor | 83.61 | sqm | - | - |
| - | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade : 13.41.1 New work (two or more coats) over and including water thinnable priming coat with cement primer | 83.61 | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_46405.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .