| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹9.3 L
EMD Value
₹9,300
Closing Date
15 Jul 2024, 12:00 pmClosed
SE EDC I MZN
H NO 60/168 LAXMAN VIHAR KAMBALWALA BAGH MUZAFFARNAGAR
VARIOUS 33/11 KV SUBSTATION LAYING ADDITIONAL CABLE AND NEW 11 KV LINE ERRECTION WORK IN BUSINESS PLAN 2024-25
2024_PVVNL_924003_2
211/2023-24/EDC-I/MZN
Open Tender
Electrical Works
Lump-sum
UNDER THE AREA OF EDD II MZN
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SE EDC I MZN
₹9,300
18 Jul 2024
10 May 2024
15 Jul 2024
10 May 2024
15 Jul 2024
10 May 2024
Amount
The work of delivering following material from the Departmental store center to the site in which includes loading and unloading on both sides. (distance 0 to 50 km)
PCC Pole 8.5 Meter
PCC Pole 11 Meter
11 KV VCB, O/G CTR 200/100/5A. 350 MVA 24 VOLT
ACSR Rabbit Conductor
11 KV XLPE CABLE 3x185 Sqmm
11 KV XLPE CABLE 3x300 Sqmm
11 KV OUTDOOR CABLE JOINTING KIT 3x185 Sqmm
11 KV OUTDOOR CABLE JOINTING KIT 3x300 Sqmm
11 KV INDOOR CABLE JOINTING KIT 3x185 Sqmm
11 KV INDOOR CABLE JOINTING KIT 3x300 Sqmm
LINE MATERIAL (Insulator, Disc, X-Arm, ANGLE, CHANNEL ETC.)
Complete work of installing the electrical material received from the store center at the site.
Complete work of installation and commissioning of New 11 KV VCB, O/G CTR 200/100/5A. 350 MVA 24 VOLT at 33/11 KV sub-station. as per RESPO standards. Including WORK OF Laying / Installing 11 KV XLPE CABLE 3x185 Sqmm (120 Mtr.)
Complete work of Pipe Earthing (upto Water Level) of Established 11 KV VCB, O/G CTR 200/100/5A. 350 MVA 24 VOLT. as per RESPO standards.
Complete work of Laying/Installing ACSR RABBIT CONDUCTOR on the Established electric poles installed as per RESPO norms.
Complete work of UNDERGROUND (Double Circuit 550 Mtr. x 2) Installing 11 KV XLPE CABLE 3x185 Sqmm on the site as per RESPO norms.
Complete work of Laying / Installing 11 KV XLPE CABLE 3x185 Sqmm by Installing with G.I. Pipe (60 Mtr.) on the Established electric poles installed as per RESPO norms.
Complete work of Laying / Installing 11 KV XLPE CABLE 3x300 Sqmm at 33/11 KV substation. In which bricks, sand, cement and other necessary decentralized materials will be provide by the contractor / Firm.
Work of Fixing/Installing Single Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of length of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disc insulator, angle channel etc. and decentralized material will be provide by the Contractor/Firm.
Work of Fixing/Installing Double Pole of the PCC Pole installed at the site support with proper alignment & upto depth of one sixth of length of pole with proper fabrication as per RESPO standards. Which includes installation of all accessories like pin/disc insulator, angle channel etc. and decentralized material will be provide by the Contractor/Firm.
Replace Damage V-Type Cross-Arm to New 11 KV V-Type X-Arm Fixing/installation on Established Single Pole of Line As per the RESPO standards.
Complete work of installation of Stay Set Complete on Established Double pole & Single Pole of Line As per the RESPO standards.
Complete work of Installing and Commissioning of 11 KV OUTDOOR CABLE JOINTING KIT 3x185 Sqmm (18 No.) & 11 KV OUTDOOR CABLE JOINTING KIT 3x300 Sqmm (05 No.) as per RESPO standards.
Complete work of Installing and Commissioning of 11 KV INDOOR CABLE JOINTING KIT 3x185 Sqmm (02 No.) & 11 KV INDOOR CABLE JOINTING KIT 3x300 Sqmm (05 No.) as per RESPO standards.
Complete work of Pole concreting on Established Double Pole / Single Pole as per RESPO standards. In which cement, sand and other necessary decentralized material will be provide by the Contractor/Firm.
Complete work of Earthing completing with earthing road of Established Pole as per RESPO standards. In which decentralized material will be provide by the Contractor/Firm.
Complete work of cutting and Chopping the branches of tree standing between the lines established on the site.
Supply of NUT & BOLT as per RESPO standards
Supply of BARBED WIRE as per RESPO standards
Supply of F-CLAMP as per RESPO standards
Supply of X-ARM HOLDING CLAMP as per RESPO standards
Supply of HOLDING CLAMP for XLPE CABLE as per RESPO standards
Supply of CLAMP with NUT & BOLT as per RESPO standards
Supply of DANGER BOARD as per RESPO standards
Supply of PG CLAMP as per RESPO standards
Supply of GI Pipe 6" DIA as per RESPO standards
Supply of STONE PAD as per RESPO standards
SUNDRIES ITEMS
Divakar Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .