Tender Value
₹10.0 L
EMD Value
₹10,545
Closing Date
10 Sept 2025, 9:30 pmClosed
Directorate of Municipal Administration
Construction of CD & Drain near Hukkerikar nagar park at Y S Colony in w.no. 23
DMA/2025-26/OW/WORK_INDENT47563
DMA/2025-26/OW/WORK_INDENT47563
Reserved
Other Works
Electronic Documents, First(One Cover)
DMA City Corporation Hubballi-Dharawada
₹500
₹10,545
21 Aug 2025
21 Aug 2025
4 Sept 2025
Construction of CD & Drain near Hukkerikar nagar park at Y S Colony in w.no. 23
Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and te...
Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work. (PWD SR 2023-24 Vol.3 Page no.15 Item no 3.1)
Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
Providing and laying in position Cement Concrete for all Sub structures ofbuilding, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. Th...
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Addendum I Additionalities for Formwork, Centering & Scaffolding for Cement Concrete Drain Walls 35% Percentage on finished rate of concrete per m3 (SL No-4)SR 2023-24 P.No.111(Volume-1)
Addendum I Additionalities for Formwork, Centering & Scaffolding for Solid Slab Super Structure 20% Percentage on finished rate of concrete per m3 (SL No-1)SR 2023-24 P.No.112(Volume-1)
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .