Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-AOC 223 N DHARMAPALLY TENTULTALA ASANSOL BURDWAN WEST BENGAL 713304 | ASANSOL | BURDWAN | WEST BENGAL | 713304 | L1 | Accepted-AOC Stands L1 and Satisfactory | |
| 2 | L2₹1.4 L+₹1,349.90 (1.00%)Rejected-Finance | L2 | Rejected-Finance Stands L2 | |
| 3 | L3₹1.4 L+₹2,697.57 (2.00%)Rejected-Finance 266 1 S B GORAI ROAD BESIDE VIDYASAGAR MAIDAN ASANSOL 713301 | ASANSOL | BURDWAN | WEST BENGAL | 713301 | L3 | Rejected-Finance Stands L3 | |
| 4 | L4₹1.4 L+₹4,050.88 (3.00%)Rejected-Finance KALYANESWARI PASCHIM BARDHAMAN WEST BENGAL | KALYANESWARI | PASCHIM BARDHAMAN | WEST BENGAL | L4 | Rejected-Finance Stands L4 |
Tender Value
Refer Docs
EMD Value
₹3,500
Closing Date
16 Nov 2022, 3:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Asn Mech Divn, PHE Dte
Janasasthya Karigori Bhaban, Sen-Releigh Road, Opp ESI Hospital, Asansol - 05
Carrying out defective maintenance work of 75 HP Centrifugal Pump Motor No 2 at Ramnagar Pump House within Kalyaneswari Water Work under RCFA Part - I Water Supply Scheme.
2022_PHED_418664_1
WBPHE /EE/AMD/NIT 30e / 2022-2023
Open Tender
Electrical Work/ Equipment
Item Wise
15 days
Kalyaneswari
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,500
2 Feb 2023
2 Nov 2022
18 Nov 2022
2 Nov 2022
16 Nov 2022
2 Nov 2022
Amount
Pump Portion
Dismantling the existing 75 HP Centrifugal Pump set from its base plate after decoupling from motor with loosen of nut bolt washer etc.the help of lifting arrangement including disconnection the all suction delivery pipe line as per direction.
Carrying charges of 75 HP Pump set from Ramnagar Pump House within Kalyaneswari Water Work to workshop at Asansol by hired vehicle including loading unloading all complete.
Dismantling and removal of damaged spares of 75 H.P. pump part by part very carefully by special attachment as per direction.
Repairing of existing wearout pump shaft with remetalling and machining with require size all complete .
Impeller collar turning polish both side .
Pump casing studs re - taping .
Supply and delivery following new spares as per sample :-
a) Shaft sleeve check nut ( G.M. ) .
b) Shaft sleeve check nut ( S.S. ) .
c ) Neck Ring ( G.M. ) .
d ) Neck bush ( G.M. ) .
e ) Gland ( G.M. ) .
f ) Bearing housing sleeve making as per bearing dia.size ( 6308 )
g ) Pump casing new studs .
h ) Gland slot studs new fitting .
i ) Tyre Coupling complete set .
j ) Shaft Sleeve S.S.long .
k ) Motor & Pump shaft key .
l ) Base plate both motor side .
m ) Pump base plate both .
n ) Pump suction side delivery side nut both .
o) Bearing 6308 . Make SKF.
Pump coupling bore making as per shaft dia. Size with key way making .
Motor coupling bore making as per shaft dia. Size with key way making .
Pump bast plate motor side base hole re - holing slide shape with gas cutting arrangement .
Gland water drain water PVC pipe union new fitting .
Pump gland packing , rubber sheet , grease etc. all complete .
Re-assembling the shaft Impeller assembly with the spares supplied mentioned above ( Item No. 7, a to o ) and other serviceable materials complete as per direction of E.I.C.
Painting the pump motor set No 1 by two coats of anticorrosive paints after scrapping cleaning the surface complete.
Back carryage of 75 HP Pump Motor sets from Asansol Workshop to Ramnagar Pump House within Kalyaneswari Water Work by hired vehicle including loading unloading as per direction.
Motor Portion. ( Work at site with engagement of workshop team.)
Dismantling the existing 75 HP motor set from its base plate after decoupling from motor with loosen of nut bolt washer etc.the help of lifting arrangement including disconnection the all electrical power line as per direction.
Dismantling and removal of damaged spares of 75 H.P. motor part by part very carefully by special attachment as per direction.
Rotor cleaning by air pressure .
Motor inner wire winding cleaning by petrol and air pressure .
Grease cap cleaning hole taping both side .
i ) Supply and delivery the following bearing for the Motor :
Re-assembling the motor i.e. rotor stator assembly with the spares supplied mentioned above ( Item No. 21, A to B ) and other serviceable materials complete as per direction of E.I.C.
Installation of Centrifugal Pump & Motor on the base and coupling with both pump - motor and connection with suction and delivery pipe line and electrical connection including supply of all necessary materials with maintain proper alignment as per direction.
Testing the Centrifugal Pump Motor set with full load condition mantaning from 12 hours running by engaging skilled personnel as per direction.
Add. GST@18%
Add. Cess@1%
INDUSTRIAL ELECTRICAL CORPORATION
M/S. SWAPAN BANERJEE
SUNRISE ENGINEERING CORPORATION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .