Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹148.5 CrAdmitted-Finance | ₹148.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹165 CrAdmitted-Finance | ₹165 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Project Code D is Extradose structure which doesnot fulfill requirement under clause 2.2.2.2 iii. c. as per RFP. Hence, bidder is Disqualified. |
| 4 | Rejected-Technical | - | - | Rejected-Technical Bidder does not fulfill similar work criteria as per clause 2.2. B.7., clause 2.2.2.2 iii.c. and clause 2.2.2.2 iii. g. Hence, bidder is Disqualified. |
| 5 | Rejected-Technical | - | - | Rejected-Technical 1. Electrical Contractor License is not submitted as per 2.2. B. 1. 2. Litigation history is not submitted as per 2.1. 14. i. Hence, bidder is Disqualified. |
| Sl No | Description | Qty | Unit | T AND T INFRA LIMITED L1 | GPT Infraprojects Limited L2 |
|---|---|---|---|---|---|
| 1.00 | Construction of Cable Stayed Major Bridge on Kumbharoshi Kalamgaon Tapola Ahir Road MDR.17 at km.55/900, in Back Water of Koyana Dam (Tapola to Ahir), Tal.Mahabaleshwar, Dist.Satara. (in Engineering, Procurement and Construction (EPC) Form) | 1 | Lumpsum | 1,48,50,00,000 ₹148.5 Cr | 1,65,00,00,000 ₹165 Cr |
Tender Value
₹134.8 Cr
EMD Value
₹70 L
Closing Date
6 Jan 2022, 5:30 pmClosed
Executive Engineer, P.W. (West) Division,Satara
Executive Engineer, P.W. (West) Division,Satara, Bandhkam Bhavan, Sadar Bazar, Satara, 415001
Construction of Cable Stayed Major Bridge on Kumbharoshi Kalamgaon Tapola Ahir Road MDR.17 at km.55/900, in Back Water of Koyana Dam (Tapola to Ahir), Tal.Mahabaleshwar, Dist.Satara. (in Engineering, Procurement and Construction (EPC) Form)
2021_PWDRP_732834_1
E-TENDER NOTICE NO 30 FOR 2021-2022 (EPC Form)
Open Tender
Civil Works - Bridges
910 days
MDR.17 at km.55/900, in Back Water of Koyana Dam
As Per EPC Tender Document
13 documents required · 13 mandatory
₹5,600
₹70 L
Yes
In Office of the Chief Engineer P.W. Region, Pune
8 Mar 2022
27 Oct 2021
11 Jan 2022
27 Oct 2021
6 Jan 2022
27 Oct 2021
23 Nov 2021
Amount
Construction of Cable Stayed Major Bridge on Kumbharoshi Kalamgaon Tapola Ahir Road MDR.17 at km.55/900, in Back Water of Koyana Dam (Tapola to Ahir), Tal.Mahabaleshwar, Dist.Satara. (in Engineering, Procurement and Construction (EPC) Form)
GPT Infraprojects Limited
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.12 MB
EPC_Tapola_Agreement_and_Schedules_27_10_2021.pdf
Tender Documents • 7.89 MB
1614269163782_Sheet_1_of_2_Tapola_Rev_GAD.pdf
Additional Documents • 8.57 MB
Sheet_2_of_2_Tapola_Rev_GAD_1_.pdf
Additional Documents • 4.34 MB
BOQ_1262817.xls
BOQ • 0.28 MB
EPC_Tapola_RFP_Rs_134.75_Cr_27_10_2021_with_electrical.pdf
Tender Documents • 0.65 MB
Download all tender documents and submit your bid