| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹19.4 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹21.2 Cr+₹1.8 Cr (9.54%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹21.6 Cr+₹2.2 Cr (11.3%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹21.9 Cr+₹2.6 Cr (13.3%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | Rejected-Technical | - | Rejected-Technical Reject |
Tender Value
₹22.0 Cr
EMD Value
₹43.9 L
Closing Date
20 Feb 2023, 6:00 pmClosed
EE 9
JDA Jaipur
Construction of Drains for Strengthening of Drainage System on Jagatpura area Zone 9, JDA Jaipur (Part-I Main Drainage Line)
2023_JDAJP_316062_1
JDA_EE_9_2022_23_NIB_31
Open Tender
Civil Works
Percentage
270 days
EE 9 Area
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Secretary, JDA (Online)
₹43.9 L
Yes
20 Mar 2023
23 Jan 2023
24 Feb 2023
23 Jan 2023
20 Feb 2023
23 Jan 2023
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing, fixing, maintaining, shifting & refixing, barricading of a steel portable barricade with horizontal sheet 0.60 mtr wide, 2.4mtr in length fitted on a “A” frame and sheet painted with 2 coats of yellow paint, lettering (CAUTION, JDA AT WORK, DRIVE SLOW) on sheet with RED paint & border with reflective paint at the time of every shifting, traffic diversion arrangement, safety guard, suitable lightning arrangement during night if required, complete in all respect till completion of the project as per technical specification and direction of Engineer-In-charge and same shall be possessed by the contractor after completion of the project. Payment under this item will be released:-
(1) 50% at the time of providing new barricading at the time of start of project at location and plan as approved by the Engineer & certification
(2) 50% After completion of project including shifting, re-erecting and maintaining the barricading in position, during entire construction tenure with requisite manpower/flagman etc. Complete for guiding traffic and safety etc and dismantling after completion of project. | 400 | Each | 2,918 | ₹11,67,200 |
| 2 | Providing and fixing reinforced concrete precast kerb stone or dand R.Mtr of M-20 grade cement concrete 120 cm long having 4 Nos. bars of 8 mm dia hysd and stirrups 6 Nos of 6 mm dia as per IS with in built provision of interlocking of jointing and lifting compaction of reinforced concrete by mechanical and table vibrators jointing at site with cement mortar 1:4 complete in all respect as directed by Engineer incharge on: 100 mm thick cement concrete 1:4:8 (1 Cement : 4 Coarse sand : 8 stone aggregate 20 mm thick nominal size) including excavation of earth and cutting of BT road cutting of WBM road etc. and disposal of surplus material with all lead and lift. The size of kerb shall be (11.5+16.5)/2*30+(16.5*7.5) | 2,123 | P.R.mtr. | 617 | ₹13,09,891 |
| 3 | Removing and Refixing of Pre cast Kerb stone obtained from site and fixing at as per direction of engineer-in-charge over 100 mm thick C.C. 1:4:8 and jointing of kerbs with cement morter 1:4 including cost of loading unloading transporting and curing complete in all respect as per direction of Engineer-in-charge. | 9,140 | R.Mtr. | 40 | ₹3,65,600 |
| 4 | Dismantling of Flexible Pavements Dismantling of Flexible Pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRD Specification Clause 202.
By Manual Means
Granular Courses | 9,156 | Cum. | 198 | ₹18,12,888 |
| 5 | By Mechanical Means.
Bituminous Courses | 2,289 | Cum. | 115.2 | ₹2,63,692.8 |
| 6 | Construction of Cut-off Walls/Head Walls
Earthwork in excavation for structures as per drawing and MoRD specification Clause 305.
Excavation for Structures
Earthwork in excavation for structures as per drawing and MoRD specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
Ordinary soil
3 m to 6 m depth | 95,803 | Cum. | 133.2 | ₹1,27,60,959.6 |
| 7 | Earth, Sand, Lime, Morrum manure or sludge. For 5 Km. | 71,852.25 | Cum. | 54 | ₹38,80,021.5 |
| 8 | Building Rubbish Stone metal (Grit and ballast etc.). For 5 Km. | 20,585 | Cum. | 59.4 | ₹12,22,749 |
| 9 | CEMENT CONCRETE (CAST-IN-SITU)
Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M15 grade Nominal Mix 1: 2: 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size). | 85.97 | Cum. | 2,882.7 | ₹2,47,822.84 |
| 10 | M10 grade Nominal Mix 1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). | 2,381.4 | Cum. | 2,398.5 | ₹57,11,787.9 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_559710.xls
BOQ • 0.33 MB
Techbid_DrainageJagatpuraPt1_EE9_31.pdf
Tender Documents • 15.67 MB
Finbid_DrainageJagatpuraPt1_EE9_31.pdf
Tender Documents • 5.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .