Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.1 LAdmitted-Finance FLAT NO 5 IIND FLOOR SIGNATURE APARTMENT SECTOR 3A AVAS VIKAS COLONY BODLA AGRA | AGRA | AGRA | UTTAR PRADESH | L1 | Admitted-Finance | ||
| 2 | L2₹8.4 L+₹30,506.69 (3.77%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹8.5 L
EMD Value
₹84,741
Closing Date
23 Jun 2026, 12:00 pmClosed
CHIEF ENGINEER
NAGAR NIGAM AGRA
Work on constructing an RCC frame structure for the main entrance gates dedicated to Hanuman and Bageshwar Nath at St. John Crossing, Bagh Muzaffar Khan (Zone-1, Chhatta Ward No. 27).
2026_DOLBU_1161346_1
02-06-2026/NAGAR NIGAM AGRA/23-06-2026/310
Open Tender
Construction Works
Percentage
30 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
NAGAR NIGAM
₹84,741
22 Jul 2026
17 Jun 2026
23 Jun 2026
17 Jun 2026
23 Jun 2026
17 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning of the site for warkable etc. All complete. (Non Scheduled) | 1 | Job | 2,000 | ₹2,000 |
| 2 | Excavation in foundation in ordinary soil (loam, clay or sand) including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of oxcavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 30m form the foundation trenches. (Rate including Royalty of earth also) (4-Chapter S.I.NO.- 251) | 8.78 | Cum | 150 | ₹1,317 |
| 3 | Providing and laying cement concrete in 1:5:10 (1 cement :6 fine sand 12 stone ballast 40 mm gauges) and curing complete, including cost of form work in foundation and floors. (5-Chapter S.I. No. 01) | 0.32 | Cum | 5,325 | ₹1,704 |
| 4 | Class-150 brick work in 1:6 cement and Coarse sand 1.25 fineness modulus mortor in Foundation including supply of all material, labour and tolls and plants etc. All complete. (CP-6 S.I. No. 01) | 23.4 | Cum | 5,650 | ₹1,32,210 |
| 5 | Reinforced cement concrete work in walls/columns (any thickness), including attachedpilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abulments, posts and struts etc. including cost of centering, shuttering, finishing and excluding reinforcement:1:1.5:3 (1 cement: 1.5 coarse sand ;3 graded stone aggregate 20 mm nominal size) | 10.64 | Cum | 8,350 | ₹88,844 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having balconies, shelves, chajjas, bands, staircases and spiral stair cases above plinth level up to floor five level, including the cost of centering, shuttering, finishing exlcuding reinforcement, with 1:1.5:3 in heavier beam (1 cement: 1.5 coarse sand(zone-lll) : 3 graded stone). | 4.5 | Cum | 8,900 | ₹40,050 |
| 7 | Providing and laying cement concrete in 1:1.5:3 (1Cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) and curing complete, lncluding cost of form work. ln Foundation and floors. | 7.09 | Cum | 6,900 | ₹48,921 |
| 8 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in and an overall rates) brought for proper completion of the work and including supply of steel, its wastage bend hooks and authorized over lapping shall be measured up to floor two level.
(b) 10mm to 12mm tor.
(Chapter No. 10 S.I. No. 504(B)) | 62.63 | Qtl | 8,500 | ₹5,32,355 |
| 9 | Sub Total | 1 | Rs | 1 | ₹1 |
| 10 | Add/Deduction Rs. For Estimate Figure Amount Match | 1 | Rs | 7 | ₹7 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.36 MB
BOQ_2176807.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .