Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹87.7 LAccepted-Finance 206 ANSAL CLASSIQUE TOWER J BLOCK COMMUNITY CENTRE RAJOURI GARDEN NEW DELHI 110027 | NEW DELHI | NEW DELHI | DELHI | 110027 | L1 | Accepted-Finance Financial Bid Accepted | |
| 2 | L2₹87.8 L+₹3,514 (0.04%)Accepted-Finance 110 FIRST FLOOR ANSAL CLASSIQUE TOWER J BLOCK COMMUNITY CENTRE RAJOURI GARDEN NEW DELHI 110027 | NEW DELHI | NEW DELHI | DELHI | 110027 | L2 | Accepted-Finance Financial Bid Accepted |
Tender Value
₹87.9 L
EMD Value
₹1.8 L
Closing Date
19 Mar 2026, 3:00 pmClosed
EE(E) HMED(N) PWD,
EE(E) HMED(N) PWD, Dr. BSA Hospital Sec-6 Rohini Delhi-110085.
SH Comprehensive Maintenance of various capacity UPSs TVSS SSM Isolation Transformer and PACs installed at Bhagwan Mahavir Hospital
2026_PWD_288479_1
104/EE(E)HMED(N)/PWD/BSAH/2025 26
Open Tender
Composite Works
Percentage
730 days
BM Hospital Pitmapura Delhi
Please refer the tender Documents as per NIT
11 documents required · 11 mandatory
₹0
₹1.8 L
30 Mar 2026
11 Mar 2026
19 Mar 2026
11 Mar 2026
19 Mar 2026
11 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Comprehensive maintenance of "LABOTEK" make 3 phase microprocessor based UPS but without main transformer battery bank, battery circuit breaker and battery software etc including repairing / replacing all defective etc complete as reqd. details as under. | |||||
| 1.01 | 2 x 10 KVA UPS | 12 | P/Month | 6,368 | ₹76,416 |
| 1.02 | 2 x 15 KVA UPS | 12 | P/Month | 9,160 | ₹1,09,920 |
| 2Supply & Fixing of SMF in the UPS installed at Various location of Bhagwan Mahavir Hospital, Pitampura, Delhi i/c connection with existing leads i/c dismantaling of old battery etc as red. | |||||
| 2.01 | 12 volt 26 AH SMF batteries with Tow years warranty/Guarantee. | 100 | Each | 3,330 | ₹3,33,000 |
| 3Comprehensive maintenance of "LABOTEK" make True online double conversion VFI technology, high frequency PWM using IGBT technology, parallel redundant, 3 phase AC input & 3 phase AC output UPS inpurt range should be 360 VAC-450 VAC, dual input (separate input for rectifiier and separate input for bypass etc including repairing / replacing all defective etc complete as reqd. details as under | |||||
| 3.01 | 120 KVA - 3 Nos. | 12 | Per / Job | 97,915 | ₹11,74,980 |
| 4Comprehensive maintenance of "LABOTEK" make following rating UPS in paralleling mode at 0.99 input power factor with SNMP card, compatible for BMS connectivity on backnet/MODBUS, as per specification given in the document with following broad features etc complete as reqd. details as under | |||||
| 4.01 | 200 KVA - 2 Nos. | 12 | Per / Job | 75,912 | ₹9,10,944 |
| 5Comprehensive maintenance of "LABOTEK" make True online double conversion VFI technology, high frequency PWD using IGBT technology , paralle redundant, 3 Phase AC input & 3 phase AC output UPS input range should be 360 VAC-450 VAC dual input (Separate input for rectifier and separate input for bypass.) etc including repairing / replacing all defective etc complete as reqd. details as under | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.15 MB
BOQ_382587.xls
BOQ • 0.29 MB
NIT.pdf
Tender Documents • 3.14 MB
Cori104.pdf
PDF • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .