| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹26.7 LAccepted-AOC | ₹26.7 L | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹27.6 L+₹85,680 (3.21%)Rejected-Finance | ₹27.6 L+₹85,680 (3.21%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹27.7 L+₹97,812 (3.66%)Rejected-Finance | ₹27.7 L+₹97,812 (3.66%) | L-3 | Rejected-Finance L-3 |
| 4 | L-4₹27.8 L+₹1.1 L (4.13%)Rejected-Finance OFFICE 556 FIRST FLOOR SECTOR 28 FARIDABAD 121008 HARYANA | FARIDABAD | HARYANA | 121008 | ₹27.8 L+₹1.1 L (4.13%) | L-4 | Rejected-Finance L-4 |
| 5 | L-5₹31.4 L+₹4.7 L (17.5%)Rejected-Finance 3 4 JEEVAN DEEP BUILDING 10 PARLIAMENT STREET NEW DELHI 1 PH 011 43573493 9899713006 | ₹31.4 L+₹4.7 L (17.5%) | L-5 | Rejected-Finance L-5 |
Tender Value
₹41.5 L
Closing Date
4 Jan 2022, 6:00 pmClosed
Sh. K Santhosh Kumar, AGM (E-E)
Office of AGM (E-E), NATS Complex, IGI Airport, New Delhi-110037
AMC of Water Treatment for AC Plant and also providing treated water to DATS Building for 02 Yrs. at NATS Complex, IGI Airport, New Delhi (2021-23)
2021_AAI_99811_1
AAI/NATS/EE/AMC-Water Treat/2021-22
Open Tender
Electrical Works
Works
730 days
NATS Complex, IGI Airport
As per ENIT, PQQ Check List and Tender Documents
11 documents required · 11 mandatory
₹1,180
Yes
Exempted
4 Feb 2022
28 Dec 2021
6 Jan 2022
29 Dec 2021
4 Jan 2022
29 Dec 2021
29 Dec 2021 - 4 Jan 2022
Amount
1. Regeneration of salt 200 kg per softener is required approx three times in a month to meet the required parameters of hardness for (2x 120 TR)& (2x250 TR) central A/C plant i/c providing of commercial salt as given below for each regeneration, testing of hardness of water etc. complete as reqd at site & as specified.
2. Supply & pouring of chemical minimum 0.6 kg/day or as required for each Chiller for prevention of scale in the cooling tower, pipe line and condenser unit to meet the parameter as per site water condition. The chemical must have dispersant and HSP and work upto 250 PPM hardness. The chemical shall be dosed on daily basis. (Make : NALCO - 7401 or its similar specification in venza/Aquachem/ ION Exchange/ GE/ Thermax).
3. Supply & pouring of chemical minimum 0.5 kg/day or as required for each Chiller for prevention of corrosion in the cooling tower, pipe line and condenser unit to meet the required parameters as per site water condition. The chemical must have corrosion inhibitor PSO for effective anodic & chathodic protection.The chemical shall be dosed on daily basis. (Make : NALCO - 1393 or its similar specification in venza/Aquachem/ ION Exchange/ GE/ Thermax).
4. Supply & pouring of chemical 0.2 kg/day for each C.Tower bio dispersant for prevention of algae in the cooling tower.The chemical shall be dosed on daily basis. (Make : NALCO - 7308 or its similar specification in venza/Aquachem/ ION Exchange/ GE/ Thermax).
5. Supply & pouring of chemical 4 kg/week for each C.Tower Non-Oxidizing biocide for prevention of micro organisms in the cooling tower as per site water condition. The chemical shall be dosed on weekly basis. (Make : NALCO - 2593 or its similar specification in venza/Aquachem/ ION Exchange/ GE/ Thermax).
6. Supply & pouring of chemical 0.8 Kg/day for each C.Tower Oxidizing biocide for prevention of micro organisms in the cooling tower as per site water condition.The chemical shall be dosed on daily basis. (Make : NALCO - 3935 or its similar specification in venza/Aquachem/ ION Exchange/ GE/ Thermax).
7. Supply & pouring of chemical 1 kg/day for each Chiller Alkanity reducer to control pH within control limits. The chemical shall be dosed on daily basis. (Make : NALCO - 70895 or its similar specification in venza/Aquachem/ ION Exchange/ GE/ Thermax).
8. Supply & pouring of chemical for corrosion inhibitor in the chiller pipe line circuit as per site water condition. Initial dosing (Minimum 160 Kgs) and subsequent dozing 10 Kg per month (Minimum) till the chemical achieve the nitrite product residual range 600-800 PPM. (Make : NALCO - TRAC 109 or its similar specification in venza/Aquachem/ ION Exchange/ GE/ Thermax).
9. Supply & pouring of chemical 8 Kg per month for prevention of micro-organism in the chiller pipe line circuit. The chemical shall be dosed on daily basis. (Make : NALCO - 2593 or its similar specification in venza/Aquachem/ ION Exchange/ GE/ Thermax).
10. Replacement of INDION NA 220 resin (i/c supply) for softening plant as and when required and as per direction of E-I-C.
(a) Plant No. 1 / Plant No. 2
11. Replacement of top filter section along with the necessary fitting (i/c supply) suitable for the softening plant (Make: Pentair Water,.Size:4872-6''T/6"B & Volume:1840 litres) at site i/c labour(as & when required) as per satisfaction of E-I-C.
12. Replacement of bottom filter section along with the necessary fitting (i/c supply) suitable for the softening plant (Make: Pentair Water,Size:4872-6''T/6"B & Volume:1840 litres) at site i/c labour (as & when required)as per satisfaction of E-I-C.
13. Replacement of Multiport valve of softner 2.5 " or 65 mm , Make : Pentier / Starlite/Syntex or Equivalent.
14. Replacement of Multiport valve of multigrade filter 2" or 50 mm, Make : Pentier / Starlite/Syntex or Equivalent.
Ess Kay Engineers
Global Oxidane
SURYA RO SYSTEMS PVT. LTD.
SNOWMEX ENGINEERS LIMITED
SAWEN CONSULTANCY SERVICES PVT. LTD.
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .